PlanningRegister.ie
Planning report · Roscommon County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 20:16

Bank Gardens, Roscommon

53.62861, -8.19192

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (100%).

See on the mapWatch this area

Not held yet for Roscommon County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BallypheasanBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2021: 3 files on Ballypheasan2022: 2 files on Ballypheasan2023: 3 files on Ballypheasan2024: 4 files on Ballypheasan2025: 2 files on Ballypheasan14 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
Yes
Protected or listed · inside the zone around a recorded monument (RO039-043028-)
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Protected building17 within 100 m Vent Pipe; House
Heritage inventory9 within 100 m Dunluce House; bank/financial institution
Monument zoneOn this site Cross-slab, Ballypheasan; Cross, Ballypheasan
DerelictListed by the council

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings32house; prison/jail
Monuments35R162495; R184453
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 2 on the draft 2027 map; 2 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Sites and Monuments Record, SMR zones of notification, Derelict sites registers, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 26 Oct 2026, 23:09
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 79% approved, and 1 in 2 are asked for more information.

New house in a garden or site19 decided · more info asked 58%
79% · council 79%
Approved nearbyRoscommon overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 19 nearby, 698 council-wide

Figure 3

Ballypheasan, file by file since 2021

4 of 4 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

14 planning files on Ballypheasan since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 15 · 2021 · two-storey rear · approved · 2154No number · 2024 · other extension · approved · 2460014No. 10 · 2024 · other extension · approved · 2460489No number · 2025 · single-storey rear · approved · 2560109Porches, roofs, otherNo number · 2021 · other work · approved · 21403No number · 2021 · other work · refused · 21495No number · 2022 · other work · approved · 22516No number · 2023 · other work · approved · 23390No number · 2023 · other work · approved · 2360101No number · 2023 · other work · refused · 2360124No. 2 · 2024 · other work · approved · 2460143No number · 2024 · other work · approved · 2460550No number · 2025 · other work · refused · 2560523New house in a side gardenNo number · 2022 · new house · approved · 2296
ApprovedRefusedWithdrawn or invalid

14 files with "Ballypheasan" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 1 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 1 in the last 12 months

  • 2660117 · new house · refused 12 May 2026 · 92 m
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 3

How long, and what if someone objects?

Figure 4

A home extension's journey here

A decision takes 55 days. 1 in 3 is asked for more information, which adds about 98 days. Building starts about 5 months after permission.

Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 3): 152 days; Appeal window: 4 weeks; Building starts: 166 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=22)55 daysIf more info asked (1 in 3)With further information: median 152 days (n=14)152 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 166 days after permission (n=13)166 days after permissionSigned off38% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated36 decided home extensions, 13 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 5

What appeals changed

6 of 7 appealed refusals became permissions. 1 of 2 appealed approvals were reversed.

Refusals appealed7 decided
6 became permissions
Approvals appealed2 decided
1 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Appeals nearby 1 in the last 12 months
  • 501462 Granted with conditions · The Old Stables, ?rd Com?in, Henry Street, Roscommon. · 92 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 4

What's changing around you?

Street map around Bank Gardens, Roscommon with 11 numbered planning items
⌖ the houseDerelict buildingRefusedEmpty land zoned for homesNo decision yetApproved
  1. 1Church St, Ballypheasan 01-2024Derelict building · 41 m
  2. 2Roscommon 009-2026Derelict building · 90 m
  3. 3Roscommon 015-2026Derelict building · 161 m
  4. 4Roscommon 008-2026Derelict building · 222 m
  5. 5Castle St, Ballypheasan 17-2025Derelict building · 431 m
  6. 6The Old Stables, Árd Comáin 2660117Refused · 92 m
  7. 70.8 ha zoned for homesEmpty land zoned for homes · 253 m
  8. 8The Rooster Bar, Church Street 2560555No decision yet · 41 m
  9. 9Abbeyside House, Abbey Street 2660282Approved with conditions · 230 m
  10. 10Convent Road, Ardnanagh 2660355Approved with conditions · 354 m
  11. 11Castle Street, Ballypheasan Td. 2560523Refused · 429 m
Figure 6

What happens to applications within 500 m

Permission isn't building. Of 41 permissions since 2016, 13 show a start notice and 2 have a completion certificate.

47 applications lodged within 500 m. Council: 40 approved, 7 refused. After appeals: 41 approved. Of those: 2 signed off, 1 built with the owner's opt-out, 10 started, 27 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT40: lodged → approved7: lodged → refused40: approved → approved6: refused → refused1 refused by the council, approved after an appeal27: approved → no start notice found1: approved → built, owner opted out10: approved → started, not signed off2: approved → signed off1: approved → ran out47 lodged47 lodged40 approved40 approved7 refused7 refused41 approved41 approved6 refused6 refused27 no start notice found27 no start notice found1 built, owner opted out1 built, owner opted out10 started, not signed off10 started, not signed off2 signed off2 signed off1 ran out1 ran out

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured47 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 7

The next 30 days

1 deadline within 500 m; the first closes 16 Nov 2026.

1 deadlines in the next 30 days: 2026-11-16 ACP 501462: Grant permission with conditionstoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecACP 501462: Grant permission with conditions · 92 m away · 2026-11-16
High Court window ends
  • Time to ask the High Court for a review ends 16 Nov 202615 days left
    Grant permission with conditions
    92 m away

Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

Sites that could change 8 within 500 m

Derelict building 6

  • 1Church St, Ballypheasan · listed as derelict · 41 m
  • 2Roscommon · listed as derelict · 90 m
  • 3Roscommon · listed as derelict · 161 m
  • 4Roscommon · listed as derelict · 222 m
  • 5Castle St, Ballypheasan · listed as derelict · 431 m
  • Henry st Ros, Ballypheasan · listed as derelict · 0 m

Empty land zoned for homes 2

  • 70.8 ha zoned for homes · no homes built on it yet · 253 m
  • 0.2 ha zoned for homes · no homes built on it yet · 435 m

Not covered here: council land to be sold (Dublin only).

Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Figure 8

Applications within 500 m, by year

Between 7 and 13 a year; busiest 2024. 85% of decisions were approvals.

2021: 4, 2022: 7, 2023: 10, 2024: 13, 2025: 10, 2026: 3051015202021: 3 approved2021: 1 refused4’21*2022: 7 approved7’222023: 8 approved2023: 2 refused10’232024: 12 approved2024: 1 refused13’242025: 8 approved2025: 2 refused10’252026: 2 approved2026: 1 refused3’26*
ApprovedRefusedWithdrawn or invalidUndecided

2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

Measuredcouncil register via NPAD

Every application within 500 m 6 in the last 12 months

See every application on the map

How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
Building work nearby 5 in the last 12 months
4 not signed off1 no sign-off needed
  • 41 Main Street, Roscommon, F42 VR44 · 22 Oct 2026 · start notice not signed off · 207 m
  • 2 Lanesborough Street, Roscommon, F42 X678 · 10 Mar 2026 · 1 homes · 7-day notice not signed off · 2560469 · 399 m
  • Gleesons Carpark, Roscommon · 4 Mar 2026 · start notice not signed off · 24/60273 · 237 m
  • Abbeytown, Roscommon, F42 V273 · 14 Feb 2026 · short notice no sign-off needed · 2560295 · 371 m
  • Athlone Road, Roscommon · 13 Jan 2026 · 7-day notice not signed off · 2560274 · 426 m
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
0
Named places nearby: estate, schemes, crèches, schools

Named places estate, developments, inspections

Crèches and schools inspected

NameLatest inspectionDistance
Roscommon Community Playgroup Ltd · Crèche8 May 2026 · report · Tusla Early Years Inspectorate169 m
Willow Outdoor Preschool · Crèche7 Jan 2026 · report · Tusla Early Years Inspectorate808 m
How we work this out
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
SourceLicenceFetchedLink
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
Tusla early years registerPublic register28 Oct 2026, 23:19open
How busy is this area Busier than most of Roscommon County Council.
Homes approved
Here15
Council middle0
Homes started
Here37
Council middle1
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 5

What's the area like?

Figure 9

This street block against the council

39% of homes built before 1971 (council 29%). 23% owner-occupied (council 74%).

Homes built before 1971
39% · council 29%
Homes built since 2001
9% · council 37%
Owner-occupied
23% · council 74%
Rented
74% · council 20%
Children under 15
28% · council 20%
Aged 65 and over
14% · council 19%
Households with 2+ cars
8% · council 47%
Work mainly from home
5% · council 9%
This small area (169 people)Roscommon

MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 197098007

Bus
382 m
Roscommon · AI02 · busiest stop within 500 m: 3 an hour at peak
Nearest school
322 m
St Cóman's Wood Primary School, 605 pupils
Schools, stops and the council

Schools

  • St Cóman's Wood Primary School · primary · 605 pupils · 322 m
  • C.B.S. Roscommon · postprimary · 450 pupils · 353 m
  • Mercy College · postprimary · 505 pupils · 398 m
  • Roscommon Community College · postprimary · 603 pupils · 646 m

Stops 5

  • Roscommon · AI02 · 0/hour at peak · 382 m
  • Roscommon · UL06 · 401 m
  • Roscommon · 425, 426, 433, 440, 461, 570 · 3/hour at peak · 467 m
  • Roscommon Station · 570 · 0/hour at peak · 503 m
  • Roscommon · Dublin - Westport · 1/hour at peak · 556 m

Schools growing or shrinking planning in 3 years · pupils last year

  • St Cóman's Wood Primary School · 322 m-2.3% pupils (605)
  • C.B.S. Roscommon · 353 m+3.2% pupils (450) · a pitch or play area 2025, approved with conditions
  • Mercy College · 398 m-2.5% pupils (505) · temporary classrooms 2026, approved with conditions
  • Roscommon Community College · 646 m+4.1% pupils (603) · 40 classrooms 2025, approved with conditions
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Council consultation portalsPublic1 Nov 2026, 01:08open
Council meetings (ModernGov)Public1 Nov 2026, 02:24open
Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
cso_saps_2022CC BY 4.0—open
National Transport AuthorityCC BY 4.0——
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
EPA strategic noise mapsCC BY 4.0——
Fingal County CouncilCC BY 4.0——
Question 6

What to ask, and who

  1. Next to a recorded monument: does digging need notice?
    Ask for: Details of past works from the seller.
    Seller · council
  2. Listed by the council as derelict: is a levy owed?
    Ask for: The register entry and any notices.
    Solicitor · council
  3. Derelict building 41 m away (Church St, Ballypheasan): is action under way?
    Ask for: The council's derelict sites register entry.
    Council
  4. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.
    Seller · solicitor
Reference

Where this is, the terms, the sources

Townland
Ballypheasan
Electoral division
Roscommon Urban
Electoral area
Roscommon
Council
Roscommon County Council
Everything we found, as a list 8 lines
  • Monument zone; no vacant land tax; listed as derelict.
  • 8 sites nearby could change: 6 derelict, 2 empty zoned plots.
  • 1 application refused within 100 m since 2025; latest a new house (2026).
  • Roscommon (bus 425, 426) 467 m away: 3 an hour at morning peak.
  • Here (2022 census): 74% rent (council 20%); 12% of homes empty (council 17%); most built 1991–2000; 42% drive to work (council 67%); population up 18% since 2016.
  • The council decides in a median 98 days (about 14 weeks); 57% are asked for more information.
  • Homes started within 1 km: 7 in the last year, 17 three years before.
  • 6 applications nearby in the last 12 months.
What the terms mean 8 terms
  • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
  • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
  • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
  • Approved (Grant of permission): The council said yes, usually with conditions.
  • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
  • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
  • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
  • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 28
SourcePublisherLicenceFetched
EPA strategic noise maps—CC BY 4.0—
Fingal County Council—CC BY 4.0—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
National Transport Authority—CC BY 4.0—
services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
www2.courts.ie—© the publisher31 Oct 2026
cso.ie—CC BY 4.0—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
lda.ieLand Development AgencyCC BY 4.011 Sept 2026
meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
gov.ieDepartment of EducationCC BY 4.027 Oct 2026
gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
Measured
counted from a public register
Calculated
a rate or median we worked out from those counts
Our classification
we sorted it by reading each description
Estimate
inferred from another source (census, map data)
Rule summary
the law, simplified: check before relying on it
How we work this out
Generated 1 Nov 2026, 20:16 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.