Planning report · Meath County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 20:01

Cockhill Road, Stamullen, Rath

53.62872, -6.26176

Homes here mostly date from the 2000s. 2 planning files on this house, the latest from 2023.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 2 planning files on this house, the latest from 2023.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Cockhill RoadBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2023: 2360085 · work already done, approved2023: 2360081 · work already done, withdrawn or invalid2024: 1 file on Cockhill Road2025: 2 files on Cockhill Road3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2023
    2360085 · work already done · approved 2023 · work already done
    approvedstartedsigned off?
  2. 2023
    2360081 · work already done · withdrawn
    approved?startedsigned off?
On this site
M2
Zoning · Major town centre
Yes
Protected or listed · inside the zone around a recorded monument (ME034-001005-)
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningM2 · Major town centre
What it says

B1 - Commercial Town or Village Centre: Commercial Town or Village Centre

The main town centre — retail, offices, civic uses, apartments.

meath county development plan 2021 2027 · 3 Nov 2021 – 2 Nov 2027

ZoningM2 · Major town centre
What it says

B1 - Commercial Town or Village Centre: Commercial Town or Village Centre

The main town centre — retail, offices, civic uses, apartments.

meath county development plan 2021 2027 as varied · 3 Nov 2021 – 2 Nov 2027

Protected building2 within 100 m on the council's record (not republished); on the council's record (not republished)
Monument zoneOn this site Tomb - effigial, Stamullin; Tomb - effigial, Stamullin
Radon1 in 10 homes have high radon (EPA)

Not on this site: heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Stamullen (201 m)

Vacant land taxNo not on the map
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Radon grid squares5
Monuments7Church; House - medieval
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 4 on the draft 2027 map; 4 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Sites and Monuments Record, SMR zones of notification, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM) · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Records of Protected StructuresNo licence stated · shown as a yes/no only—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 58% approved, and 1 in 2 are asked for more information.

New house in a garden or site12 decided · more info asked 58%
58% · council 75%
Approved nearbyMeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 12 nearby, 1,651 council-wide

Figure 3

Cockhill Road, file by file since 2024

1 of 1 decided extensions on the road were approved.

3 planning files on Cockhill Road since 2024, by kind and decision.202420252026Extensions, atticsNo number · 2025 · other extension · approved · 2560060Porches, roofs, otherNo number · 2024 · other work · approved · 2460335No number · 2025 · other work · approved · 2560391New house in a side garden
ApprovedRefusedWithdrawn or invalid

3 files with "Cockhill Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2024–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days.

    Comments open: 5 weeks · €20; Council decision: 53 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–54 (n=17)53 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off50% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated21 decided home extensions, 2 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 4 appealed refusals became permissions.

    Refusals appealed4 decided
    1 became permissions
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Cockhill Road, Stamullen, Rath with 7 numbered planning items
    ⌖ the houseEmpty land zoned for homesApproved
    1. 11.5 ha zoned for homesEmpty land zoned for homes · 47 m
    2. 20.2 ha zoned for homesEmpty land zoned for homes · 49 m
    3. 31.2 ha zoned for homesEmpty land zoned for homes · 177 m
    4. 43.3 ha zoned for homesEmpty land zoned for homes · 417 m
    5. 5Watery Lane (Lemare), Stamullen 2561273Approved with conditions · 123 m
    6. 6Stadalt, Stamullen 2660390Approved with conditions · 297 m
    7. 7The Close Silver Banks, Stamullin 2660173Approved with conditions · 468 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 17 permissions since 2016, 1 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    20 applications lodged within 500 m. Council: 17 approved, 3 refused. After appeals: 17 approved. Of those: 0 signed off, 1 built with the owner's opt-out, 0 started, 16 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT17: lodged → approved3: lodged → refused17: approved → approved3: refused → refused16: approved → no start notice found1: approved → built, owner opted out20 lodged20 lodged17 approved17 approved3 refused3 refused17 approved17 approved3 refused3 refused16 no start notice found16 no start notice found1 built, owner opted out1 built, owner opted out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured20 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 4 within 500 m

      Empty land zoned for homes 4

      • 11.5 ha zoned for homes · no homes built on it yet · 47 m
      • 20.2 ha zoned for homes · no homes built on it yet · 49 m
      • 31.2 ha zoned for homes · no homes built on it yet · 177 m
      • 43.3 ha zoned for homes · no homes built on it yet · 417 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 8

      Applications within 500 m, by year

      Between 1 and 7 a year; busiest 2025. 85% of decisions were approvals.

      2021: 1, 2022: 3, 2023: 1, 2024: 6, 2025: 7, 2026: 205102021: 1 approved1’21*2022: 2 approved2022: 1 refused3’222023: 1 approved1’232024: 5 approved2024: 1 refused6’242025: 6 approved2025: 1 refused7’252026: 2 approved2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 6 in the last 12 months

      See every application on the map

      • The Mill Yard , Stamullen , Co. Meath Withdrawn or not valid
        retention for change of use from that granted under Planning Ref. No. SA40484 which includes building No. 2…
        26612469 Oct 2026334 m
      • 6 The Close , Silverbanks Stamullen , Co Meath Withdrawn or not valid
        an attic conversion with dormers to rear and side roof to accommodate stairs to allow access to attic as non…
        266114814 Sept 20261 homes491 m
      • 6Stadalt , Stamullen , Meath Approved with conditions
        A single storey dwelling, vehicular entrance on to existing laneway & all associated site works.
        26603902 Jun 2026297 m
      • Stadalt , Stamullen , Co. Meath Withdrawn or not valid
        A single storey dwelling, vehicular entrance on to existing laneway & all associated site works
        266033525 Mar 20261 homes297 m
      • 7The Close Silver Banks , Stamullin , Co. Meath Approved with conditions
        A). Single-storey detached structure to rear consisting of office, utility, WC and creche use. B). External…
        266017318 Jun 2026468 m
      • 5Watery Lane (Lemare) , Stamullen , Co. Meath Approved with conditions
        the development will consist of the installation of a new wastewater treatment plant and percolation area…
        256127310 Mar 2026123 m
      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Building work nearby 2 in the last 12 months
      2 no sign-off needed
      • Gormanston Road, Stamullin, Meath · 28 May 2026 · 1 homes · start notice, opted out no sign-off needed · 2560989 · 416 m
      • Gormanston Road, Stamullin, Meath · 28 May 2026 · short notice no sign-off needed · 2560989 · 416 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Cuddles Creche · Crèche31 Oct 2024 · report · Tusla Early Years Inspectorate687 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of Meath County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here214
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      71% owner-occupied (council 75%).

      Homes built before 1971
      10% · council 18%
      Homes built since 2001
      40% · council 45%
      Owner-occupied
      71% · council 75%
      Rented
      26% · council 20%
      Children under 15
      16% · council 23%
      Aged 65 and over
      15% · council 12%
      Households with 2+ cars
      58% · council 54%
      Work mainly from home
      12% · council 11%
      This small area (275 people)Meath

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 167085005/01

      Bus
      86 m
      Gough's Corner · 191, 192 · busiest stop within 500 m: 1 an hour at peak
      Radon
      1 in 10
      homes here likely high (EPA). Test it
      Flood
      Yes
      OPW flood map area within 100 m
      Nearest school
      385 m
      S N Naomh Padraig, 524 pupils
      Homes sold nearby
      27
      in 3 years, 17 new (Property Price Register)
      Schools, stops and the council

      Schools

      • S N Naomh Padraig · primary · 524 pupils · 385 m

      Stops 8

      • Gough's Corner · 191, 192 · 1/hour at peak · 86 m
      • Gough's Corner · 191, 192 · 1/hour at peak · 132 m
      • Stamullen · 191, 192 · 0/hour at peak · 231 m
      • Stamullen · 191, 192 · 1/hour at peak · 233 m
      • Silver Banks · 191, 192 · 1/hour at peak · 614 m
      • Silver Banks · 191, 192 · 1/hour at peak · 617 m
      • Mountain View · 191, 192 · 1/hour at peak · 629 m
      • Mountain View · 191, 192 · 0/hour at peak · 633 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • S N Naomh Padraig · 385 m-1.1% pupils (524) · an extension 2025, approved with conditions
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      Council consultation portalsPublic31 Oct 2026, 01:06open
      Council meetings (ModernGov)Public31 Oct 2026, 02:21open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Work already done (2360085): work kept with permission. Done as approved?
        Ask for: The retention grant and an opinion of compliance.
        Seller · solicitor
      2. Next to a recorded monument: does digging need notice?
        Ask for: Details of past works from the seller.
        Seller · council
      3. Flood risk area within 100 m: can you insure it?
        Ask for: A flood-cover quote before sale agreed.
        Insurer
      4. High radon area (1 in 10 homes): has it been tested?
        Ask for: Radon test results.
        Seller
      5. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Stamullin
      Electoral division
      Stamullin
      Electoral area
      Ashbourne
      Council
      Meath County Council
      Everything we found, as a list 8 lines
      • 2 applications on this site; latest 2360085, approved 2023, work already done.
      • Zoned M2 (major town centre); monument zone; no vacant land tax; flood risk area within 100 m; high radon area.
      • 4 sites nearby could change: 4 empty zoned plots.
      • Gough's Corner (bus 191, 192) 86 m away: 1 an hour at morning peak; 4 from all stops within 500 m.
      • Here (2022 census): 71% owner-occupied (council 75%); 5% of homes empty (council 6%); most built 2001–2010; 71% drive to work (council 64%); population up 9% since 2016.
      • Around here the council decides in a median 55 days (about 8 weeks); 36% are asked for more information.
      • 6 applications nearby in the last 12 months.
      • S N Naomh Padraig, 385 m away: an extension approved (2025).
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
      • Permission for work already done (Retention permission): An application to keep something that was built without permission.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 33
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
      www2.courts.ie—© the publisher30 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
      services6.arcgis.comLocal authorities (Record of Protected Structures)No licence stated · flag only—
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      water.ie—© the publisher · flag only—
      water.ie—© the publisher · flag only—
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 31 Oct 2026, 20:01 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.