Planning report · Roscommon County Council · 2000 m around the house · the last 12 months · 27 Oct 2026, 21:08

Castle Street

53.63355, -8.19183

Homes here mostly date from the 1970s. 1 planning file on this house, the latest from 2023. Home extensions nearby almost always get approved (100%). A building site 1.9 km away stopped before it was finished.

See on the mapWatch this area

Not held yet for Roscommon County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992). 1 planning file on this house, the latest from 2023.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of CloonbracknaBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2023: 2360033 · work already done, withdrawn or invalid2023: 5 files on Cloonbrackna5 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2023
    2360033 · work already done · withdrawn
    approved?startedsigned off?
On this site
Yes
Protected or listed · inside the zone around a recorded monument (RO039-043018-)
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Heritage inventory1 within 100 m The Royal
Monument zoneOn this site Designed landscape - avenue, Ballypheasan,Cloonbrackna; Prison, Ballypheasan

Not on this site: protected building, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings47Sunny Side House; Castle Street
Monuments76R162480; R162486
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 14 on the draft 2027 map; 14 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Sites and Monuments Record, SMR zones of notification, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 75% approved, and 1 in 2 are asked for more information.

New house in a garden or site16 decided · more info asked 62%
75% · council 79%
Approved nearbyRoscommon overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 16 nearby, 694 council-wide

Figure 3

Cloonbrackna, file by file since 2023

1 of 1 decided extensions on the road were approved.

5 planning files on Cloonbrackna since 2023, by kind and decision.2023202420252026Extensions, atticsNo number · 2023 · rear · approved · 23361Porches, roofs, otherNo number · 2023 · other work · refused · 2332No number · 2023 · other work · approved · 23322No number · 2023 · other work · approved · 23408No number · 2023 · other work · approved · 2360091New house in a side garden
ApprovedRefusedWithdrawn or invalid

5 files with "Cloonbrackna" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2023–2026

Extensions and refusals right beside you 1 within 250 m · 1 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic10—

Refused within 100 m 1 in the last 12 months

  • 2560523 · work already done · refused 12 Dec 2025 · 22 m
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 27 Oct 2026, 01:33
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
Question 3

How long, and what if someone objects?

Figure 4

A home extension's journey here

A decision takes 55 days. 1 in 2 is asked for more information, which adds about 109 days. Building starts about 6 months after permission.

Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 2): 162 days; Appeal window: 4 weeks; Building starts: 187 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=17)55 daysIf more info asked (1 in 2)With further information: median 162 days (n=18)162 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 187 days after permission (n=14)187 days after permissionSigned off43% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated35 decided home extensions, 14 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 5

What appeals changed

4 of 5 appealed refusals became permissions. 1 of 2 appealed approvals were reversed.

Refusals appealed5 decided
4 became permissions
Approvals appealed2 decided
1 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Appeals nearby 3 in the last 12 months
  • 501462 Granted with conditions · The Old Stables, ?rd Com?in, Henry Street, Roscommon. · 604 m
  • 500762 Refused · Golf Links Road, Roscommon, Co. Roscommon. · 1.4 km
  • 500785 Granted · Ardsallagh Beg, Roscommon, Co. Roscommon. · 1.6 km
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 27 Oct 2026, 01:33
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Courts Service legal diary (judicial reviews)© the publisher26 Oct 2026, 23:11open
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
Question 4

What's changing around you?

Street map around Castle Street with 15 numbered planning items
⌖ the houseOpen for commentsWindow closingDerelict buildingApproved, not startedLarge schemeRefusedEmpty land zoned for homes
  1. 1Castle View House, Castle St. 2660537No decision yet · 238 m
  2. 2Ardsallagh Beg off Golf Links Road, Roscommon Town 2660509No decision yet · 1.5 km
  3. 3Mount Prospect Lodge Ardsallaghbeg, Golf Links Road 2660495No decision yet · 1.7 km
  4. 4Roscommon Community College, Ardnanagh 2560532Approved with conditions · 940 m
  5. 5Racecourse Rd., Roscommon 2660130Approved with conditions · 1.3 km
  6. 6Grouse Lodge, Lanesborough Road 2661Approved with conditions · 1.9 km
  7. 7Roscommon 010-2026Derelict building · 136 m
  8. 8Castle St, Ballypheasan 17-2025Derelict building · 168 m
  9. 9Ardsallagh Beg Td. 2560388Approved, no sign building has started · 1.8 km
  10. 10Golf Links Road, Roscommon 2660480No decision yet · 1.4 km
  11. 11Castle Street, Ballypheasan Td. 2560523Refused · 22 m
  12. 120.7 ha zoned for homesEmpty land zoned for homes · 48 m
  13. 130.2 ha zoned for homesEmpty land zoned for homes · 96 m
  14. 140.4 ha zoned for homesEmpty land zoned for homes · 264 m
  15. 150.8 ha zoned for homesEmpty land zoned for homes · 447 m
Figure 6

What happens to applications within 500 m

Permission isn't building. Of 26 permissions since 2016, 6 show a start notice and 1 has a completion certificate.

30 applications lodged within 500 m. Council: 25 approved, 5 refused. After appeals: 26 approved. Of those: 1 signed off, 2 built with the owner's opt-out, 3 started, 20 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT25: lodged → approved5: lodged → refused25: approved → approved4: refused → refused1 refused by the council, approved after an appeal20: approved → no start notice found2: approved → built, owner opted out3: approved → started, not signed off1: approved → signed off30 lodged30 lodged25 approved25 approved5 refused5 refused26 approved26 approved4 refused4 refused20 no start notice found20 no start notice found2 built, owner opted out2 built, owner opted out3 started, not signed off3 started, not signed off1 signed off1 signed off

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured30 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 7

The next 30 days

7 deadlines within 2.0 km; the first closes 27 Oct 2026.

7 deadlines in the next 30 days: 2026-10-27 2660495: application received — Permission for (a) demolition of existing conservatory and boiler house attached to rear of house, (b) proposed single-s; 2026-10-30 2660509: application received — Permission for development which will consist of 52 no. dwellings comprising of 22 no. 4-bed semi-detached 2 & 1/2-sto; 2026-11-02 2560532: CONDITIONAL — Permission for development consisting of: the demolition of 5 no. outbuildings, fire safety upgrades to existing school ; 2026-11-05 2661: CONDITIONAL — Permission to make alterations to the windows and add additional windows on the existing house, construction of a new pi; 2026-11-10 2660537: application received — Permission to demolish rear single storey extension and adjoining outbuilding. Construct dormer style domestic extensio; 2026-11-12 2660130: CONDITIONAL — Permission to construct a domestic dwelling house and domestic garage together with connection to public water mains and; 2026-11-16 ACP 501462: Grant permission with conditionstoday1 Nov6 Nov11 Nov16 Nov21 Nov26 Nov2660495: application received — Permission for (a) demolition of existing conservatory and boiler house attached to rear of house, (b) proposed single-s · 1.7 km away · 2026-10-272660509: application received — Permission for development which will consist of 52 no. dwellings comprising of 22 no. 4-bed semi-detached 2 & 1/2-sto · 1.5 km away · 2026-10-302560532: CONDITIONAL — Permission for development consisting of: the demolition of 5 no. outbuildings, fire safety upgrades to existing school · 940 m away · 2026-11-022661: CONDITIONAL — Permission to make alterations to the windows and add additional windows on the existing house, construction of a new pi · 1.9 km away · 2026-11-052660537: application received — Permission to demolish rear single storey extension and adjoining outbuilding. Construct dormer style domestic extensio · 238 m away · 2026-11-102660130: CONDITIONAL — Permission to construct a domestic dwelling house and domestic garage together with connection to public water mains and · 1.3 km away · 2026-11-12ACP 501462: Grant permission with conditions · 604 m away · 2026-11-16
Comments closeTime to appeal endsHigh Court window ends
  • Comments close 27 Oct 2026closes today
    32660495 · application received — Permission for (a) demolition of existing conservatory and boiler house attached to rear of…
    €20 to the council · 1.7 km away
  • Comments close 30 Oct 20263 days left
    22660509 · application received — Permission for development which will consist of 52 no. dwellings comprising of 22 no. 4-bed…
    €20 to the council · 1.5 km away
  • Time to appeal ends 2 Nov 20266 days left
    42560532 · CONDITIONAL — Permission for development consisting of: the demolition of 5 no. outbuildings, fire safety upgrades to…
    €220 to An Coimisiún Pleanála (€110 observer) · 940 m away
  • Time to appeal ends 5 Nov 20269 days left
    62661 · CONDITIONAL — Permission to make alterations to the windows and add additional windows on the existing house,…
    €220 to An Coimisiún Pleanála (€110 observer) · 1.9 km away
  • Comments close 10 Nov 202614 days left
    12660537 · application received — Permission to demolish rear single storey extension and adjoining outbuilding. Construct dormer…
    €20 to the council · 238 m away
  • Time to appeal ends 12 Nov 202616 days left
    52660130 · CONDITIONAL — Permission to construct a domestic dwelling house and domestic garage together with connection to public…
    €220 to An Coimisiún Pleanála (€110 observer) · 1.3 km away
  • Time to ask the High Court for a review ends 16 Nov 202620 days left
    Grant permission with conditions
    604 m away

Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

Figure 8

Approved, stalled or planned, not built yet

12 homes 1.8 km away were approved Jun 2026 with no start notice yet; the permission runs to Jun 2031. 1 building site nearby stopped before sign-off.

92-93 Oldwood, Roscommon · 111 homes: 111 homes, started Aug 2022, never signed off; Ardsallagh Beg Td. · 12 homes: 12 homes approved Jun 2026, not started2022202320242025202620272028202920302031203292-93 Oldwood, Roscommon · 111 homes1.9 km · 11/259 & 22/3002111 homes, started Aug 2022, never signed off111 homes, started Aug 2022, never signed offArdsallagh Beg Td. · 12 homes1.8 km · 256038812 homes approved Jun 2026, not started12 homes approved Jun 2026, not startedtoday

Each row is a dated fact from a public register: no score and no forecast.

Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

Sites that could change 22 within 2.0 km

Derelict building 10

  • 7Roscommon · listed as derelict · 136 m
  • 8Castle St, Ballypheasan · listed as derelict · 168 m
  • Church St, Ballypheasan · listed as derelict · 466 m
  • Roscommon · listed as derelict · 513 m
  • Henry st Ros, Ballypheasan · listed as derelict · 532 m
  • Roscommon · listed as derelict · 610 m
  • Roscommon · listed as derelict · 739 m
  • 18B Convent Cou, Ardnanagh · listed as derelict · 856 m
  • Roscommon · listed as derelict · 1.1 km
  • 14 Antogher Rd, Ballypheasan · listed as derelict · 1.3 km

Building site that stopped 1

  • 92-93 Oldwood, Roscommon · 111 homes, started Aug 2022, never signed off · 1.9 km

Approved, not started 1

Empty land zoned for homes 10

  • 120.7 ha zoned for homes · no homes built on it yet · 48 m
  • 130.2 ha zoned for homes · no homes built on it yet · 96 m
  • 140.4 ha zoned for homes · no homes built on it yet · 264 m
  • 150.8 ha zoned for homes · no homes built on it yet · 447 m
  • 0.7 ha zoned for homes · no homes built on it yet · 763 m
  • 0.8 ha zoned for homes · no homes built on it yet · 974 m
  • 4.3 ha zoned for homes · no homes built on it yet · 1.1 km
  • 0.5 ha zoned for homes · no homes built on it yet · 1.2 km
  • 1.8 ha zoned for homes · no homes built on it yet · 1.5 km
  • 2.6 ha zoned for homes · no homes built on it yet · 1.6 km

Not covered here: council land to be sold (Dublin only).

Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 27 Oct 2026, 02:09
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Figure 9

Applications within 500 m, by year

Between 5 and 9 a year; busiest 2023. 83% of decisions were approvals.

2021: 3, 2022: 5, 2023: 9, 2024: 5, 2025: 7, 2026: 105102021: 3 approved3’21*2022: 5 approved5’222023: 5 approved2023: 4 refused9’232024: 5 approved5’242025: 6 approved2025: 1 refused7’252026: 1 approved1’26*
ApprovedRefusedWithdrawn or invalidUndecided

2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

Measuredcouncil register via NPAD

Open for comments €20 to comment

Every application within 2.0 km 35 in the last 12 months

See every application on the map

How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
Building work nearby 12 in the last 12 months
9 not signed off3 no sign-off needed
  • 41 Main Street, Roscommon, F42 VR44 · 22 Oct 2026 · start notice not signed off · 391 m
  • Racecourse Road, Roscommon · 20 Oct 2026 · 7-day notice not signed off · 2660106 · 1.2 km
  • Ashbrook, St Theresa's Road, Roscommon · 19 Oct 2026 · 3 homes · start notice not signed off · 2560400 · 1.3 km
  • 26 Hyde Court, Roscommon · 28 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2560483 · 1.3 km
  • Lanesborough Street, Clooneybeirne, Roscommon, F42 HD73 · 12 Aug 2026 · 1 homes · 7-day notice not signed off · PD/24/106 · 1.1 km
  • 22 Woodview Court, Roscommon · 26 Jun 2026 · short notice no sign-off needed · PD/23/323 · 1.9 km
  • 2 Lanesborough Street, Roscommon, F42 X678 · 10 Mar 2026 · 1 homes · 7-day notice not signed off · 2560469 · 225 m
  • 24 Saint Theresa's Road, Roscommon · 9 Mar 2026 · 2 homes · start notice not signed off · PD25/5 · 1.3 km
  • Gleesons Carpark, Roscommon · 4 Mar 2026 · start notice not signed off · 24/60273 · 313 m
  • Abbeytown, Roscommon, F42 V273 · 14 Feb 2026 · short notice no sign-off needed · 2560295 · 858 m
  • Athlone Road, Roscommon · 13 Jan 2026 · 7-day notice not signed off · 2560274 · 668 m
  • Racecourse Road, Roscommon, F42 AK02 · 30 Dec 2025 · start notice not signed off · 25/60091 · 1.0 km
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Source: Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
Homes coming 12 not started
How we work this out
Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 27 Oct 2026, 02:09
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
Named places nearby: estate, schemes, crèches, schools

Named places estate, developments, inspections

Crèches and schools inspected

NameLatest inspectionDistance
Roscommon Community Playgroup Ltd · Crèche8 May 2026 · report · Tusla Early Years Inspectorate718 m
How we work this out
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
Sources: Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 23:37
SourceLicenceFetchedLink
Department of Education school listCC BY 4.027 Sept 2026, 23:32open
Tusla early years registerPublic register21 Oct 2026, 23:37open
How busy is this area About as busy as most of Roscommon County Council.
Homes approved
Here0
Council middle0
Homes started
Here10
Council middle1
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
Question 5

What's the area like?

Figure 10

This street block against the council

15% of homes built before 1971 (council 29%). 50% owner-occupied (council 74%).

Homes built before 1971
15% · council 29%
Homes built since 2001
22% · council 37%
Owner-occupied
50% · council 74%
Rented
43% · council 20%
Children under 15
24% · council 20%
Aged 65 and over
23% · council 19%
Households with 2+ cars
22% · council 47%
Work mainly from home
8% · council 9%
This small area (281 people)Roscommon

MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 197098003

Bus
299 m
Roscommon · 425, 426, 433 · busiest stop within 500 m: 3 an hour at peak
Nearest school
695 m
St Cóman's Wood Primary School, 605 pupils
Schools, stops and the council

Schools

  • St Cóman's Wood Primary School · primary · 605 pupils · 695 m
  • Mercy College · postprimary · 505 pupils · 786 m
  • C.B.S. Roscommon · postprimary · 450 pupils · 840 m
  • Roscommon Community College · postprimary · 603 pupils · 1.1 km
  • Gaelscoil de hIde · primary · 149 pupils · 1.5 km

Stops 7

  • Roscommon · 425, 426, 433, 440, 461, 570 · 3/hour at peak · 299 m
  • Roscommon · AI02 · 0/hour at peak · 624 m
  • Roscommon · UL06 · 660 m

Schools growing or shrinking planning in 3 years · pupils last year

  • St Cóman's Wood Primary School · 695 m-2.3% pupils (605)
  • Mercy College · 786 m-2.5% pupils (505) · temporary classrooms 2026, approved with conditions
  • C.B.S. Roscommon · 839 m+3.2% pupils (450) · a pitch or play area 2025, approved with conditions
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 27 Oct 2026, 01:57
SourceLicenceFetchedLink
Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
Department of Education school listCC BY 4.027 Sept 2026, 23:32open
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
Council consultation portalsPublic27 Oct 2026, 00:57open
Council meetings (ModernGov)Public27 Oct 2026, 01:57open
Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
cso_saps_2022CC BY 4.0—open
National Transport AuthorityCC BY 4.0——
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
EPA strategic noise mapsCC BY 4.0——
Fingal County CouncilCC BY 4.0——
Question 6

What to ask, and who

  1. Next to a recorded monument: does digging need notice?
    Ask for: Details of past works from the seller.
    Seller · council
  2. Application 238 m away open for comments until 10 Nov 2026: comment?
    Ask for: The plans on the council's website (€20 to comment).
    Council
  3. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.
    Seller · solicitor
Reference

Where this is, the terms, the sources

Townland
Cloonbrackna
Electoral division
Roscommon Urban
Electoral area
Roscommon
Council
Roscommon County Council
Everything we found, as a list 8 lines
  • 1 application on this site; latest 2360033, withdrawn.
  • Monument zone; no vacant land tax.
  • Flood Zone A 35 m away on the Roscommon Town Local Area Plan 2024-2030 flood map.
  • 22 sites nearby could change: 10 derelict, 1 stalled build, 1 approved scheme, 10 empty zoned plots.
  • 3 applications open for comments nearby; nearest closes 10 Nov 2026.
  • 1 application refused within 100 m since 2025; latest for work already done (2025).
  • 12 homes approved nearby, not started; largest 12 at Ardsallagh Beg Td..
  • Roscommon (bus 425, 426) 299 m away: 3 an hour at morning peak.
What the terms mean 10 terms
  • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
  • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
  • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
  • Approved (Grant of permission): The council said yes, usually with conditions.
  • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
  • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
  • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
  • Permission for work already done (Retention permission): An application to keep something that was built without permission.
  • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
  • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
Sources and licences 28
SourcePublisherLicenceFetched
EPA strategic noise maps—CC BY 4.0—
Fingal County Council—CC BY 4.0—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
National Transport Authority—CC BY 4.0—
services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.027 Oct 2026
data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
dlrcoco.citizenspace.comLocal authorities (consultation portals)Public27 Oct 2026
www2.courts.ie—© the publisher26 Oct 2026
cso.ie—CC BY 4.0—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
services1.arcgis.com—CC BY 4.0—
transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
lda.ieLand Development AgencyCC BY 4.011 Sept 2026
meetings.fingal.ieLocal authorities (council meetings)Public27 Oct 2026
services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.027 Oct 2026
services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence27 Oct 2026
services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
gov.ieDepartment of EducationCC BY 4.027 Sept 2026
gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
Measured
counted from a public register
Calculated
a rate or median we worked out from those counts
Our classification
we sorted it by reading each description
Estimate
inferred from another source (census, map data)
Rule summary
the law, simplified: check before relying on it
How we work this out
Generated 27 Oct 2026, 21:08 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.