How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built after 2016, with building records online. 2 planning files on this house, the latest from 2021.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2016–2021. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of KilcarnBuilt: most homes in this small area date from 2016–2021 (census estimate)most built2021: 211731 · the development will, refused2021: 211468 · the development will, withdrawn or invalid2021: 1 file on Kilcarn2023: 1 file on Kilcarn2024: 1 file on Kilcarn2025: 1 file on Kilcarn2026: 1 file on Kilcarn5 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    211731 · the development will · refused 2021
    approvedstarted?signed off?
  2. 2021
    211468 · the development will · withdrawn
    approved?started?signed off?
On this site
R1
Zoning · New residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR1 · New residential
What it says

A2 - New Residential: New Residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

meath county development plan 2021 2027 · 3 Nov 2021 – 2 Nov 2027

ZoningR1 · New residential
What it says

A2 - New Residential: New Residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

meath county development plan 2021 2027 as varied · 3 Nov 2021 – 2 Nov 2027

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings1worker's house
Radon grid squares1
Monuments4Font (present location); Stone sculpture (present location)
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3 on the draft 2027 map; 3 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 86% approved, and 1 in 2 is asked for more information.

Single-storey rear10 decided · more info asked 0%
100% · council 97%
Attic or dormer24 decided · more info asked 17%
100% · council 92%
New house in a garden or site7 decided · more info asked 43%
86% · council 75%
Approved nearbyMeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 41 nearby, 2,566 council-wide

Figure 3

Kilcarn, file by file since 2021

2 of 2 decided extensions on the road were approved.

5 planning files on Kilcarn since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2025 · attic conversion / dormer · approved · 2560537No number · 2026 · single-storey rear · approved · 2660409Porches, roofs, otherNo. 7 · 2021 · other work · refused · 211731No number · 2023 · other work · approved · 23724No number · 2024 · other work · approved · 2457New house in a side garden
ApprovedRefusedWithdrawn or invalid

5 files with "Kilcarn" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Dormer or attic11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days. 1 in 7 is asked for more information, which adds about 101 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 7): 153 days; Appeal window: 4 weeks; Building starts: 126 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–54 (n=50)53 daysIf more info asked (1 in 7)With further information: median 153 days (n=9)153 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 126 days after permission (n=13)126 days after permissionSigned off46% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated59 decided home extensions, 13 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    3 of 3 appealed approvals were reversed.

    Approvals appealed3 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Johnstown with 9 numbered planning items
    ⌖ the houseWindow closingBuilding site that stoppedApproved, not startedEmpty land zoned for homesApproved
    1. 141 KILCARN WOODS, Navan 2661073Approved with conditions · 138 m
    2. 2Kilcarn Woods 2, Navan NA/180276Building site that stopped · 90 m
    3. 3Kilcarn 2457Approved, no sign building has started · 93 m
    4. 40.2 ha zoned for homesEmpty land zoned for homes · 339 m
    5. 50.4 ha zoned for homesEmpty land zoned for homes · 376 m
    6. 62.7 ha zoned for homesEmpty land zoned for homes · 0 m
    7. 770 Carne Hill, Johnstown Navan 2561334Approved with conditions · 274 m
    8. 874 Carne Hill, Johnstown Navan 2660205Approved with conditions · 317 m
    9. 9Kilcarn Johnstown, Navan 2660409Approved with conditions · 486 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 15 permissions since 2016, 2 show a start notice and 1 has a completion certificate.

    18 applications lodged within 500 m. Council: 15 approved, 3 refused. After appeals: 15 approved. Of those: 1 signed off, 1 built with the owner's opt-out, 0 started, 13 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT15: lodged → approved3: lodged → refused15: approved → approved3: refused → refused13: approved → no start notice found1: approved → built, owner opted out1: approved → signed off18 lodged18 lodged15 approved15 approved3 refused3 refused15 approved15 approved3 refused3 refused13 no start notice found13 no start notice found1 built, owner opted out1 built, owner opted out1 signed off1 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured18 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 16 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-16 2661073: CONDITIONAL — the development will consist of the conversion of attic space to existing 2 storey dwelling to accommodate a new bedroomtoday3 Nov8 Nov13 Nov18 Nov23 Nov28 Nov2661073: CONDITIONAL — the development will consist of the conversion of attic space to existing 2 storey dwelling to accommodate a new bedroom · 138 m away · 2026-11-16
    Time to appeal ends
    • Time to appeal ends 16 Nov 202618 days left
      12661073 · CONDITIONAL — the development will consist of the conversion of attic space to existing 2 storey dwelling to…
      €220 to An Coimisiún Pleanála (€110 observer) · 138 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    11 homes 93 m away were approved May 2024 with no start notice yet; the permission runs to Apr 2029. 1 building site nearby stopped before sign-off.

    Kilcarn Woods 2, Navan · 51 homes: 51 homes, started May 2022, never signed off; Kilcarn · 11 homes: 11 homes approved May 2024, not started202220232024202520262027202820292030Kilcarn Woods 2, Navan · 51 homes90 m · NA/18027651 homes, started May 2022, never signed off51 homes, started May 2022, never signed offKilcarn · 11 homes93 m · 245711 homes approved May 2024, not started11 homes approved May 2024, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 5 within 500 m

    Building site that stopped 1

    • 2Kilcarn Woods 2, Navan · 51 homes, started May 2022, never signed off · 90 m

    Approved, not started 1

    • Kilcarn · 11 homes approved May 2024, not started · 93 m

    Empty land zoned for homes 3

    • 40.2 ha zoned for homes · no homes built on it yet · 339 m
    • 50.4 ha zoned for homes · no homes built on it yet · 376 m
    • 62.7 ha zoned for homes · no homes built on it yet · 0 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 1 and 5 a year; busiest 2025. 83% of decisions were approvals.

    2021: 2, 2022: 1, 2023: 4, 2024: 3, 2025: 5, 2026: 305102021: 1 approved2021: 1 refused2’21*2022: 1 approved1’222023: 2 approved2023: 2 refused4’232024: 3 approved3’242025: 5 approved5’252026: 3 approved3’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 6 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Building work nearby 1 in the last 12 months
    1 no sign-off needed
    • 70 Carne Hill, Navan, Meath, C15 NR1X · 29 May 2026 · 1 homes · start notice, opted out no sign-off needed · 25/61334 · 286 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 29 Oct 2026, 02:33
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Homes coming 11 not started
    • 3Kilcarn · 11 homes · not started · runs out 16 Apr 2029 · 93 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Chestnut Daycare Limited · Crèche22 Jan 2026 · report · Tusla Early Years Inspectorate358 m
    Little Champs · Crèche4 Jun 2025 · report · Tusla Early Years Inspectorateapprox. 495 m
    Littlebrook Montessori School · Crèche25 Feb 2025 · report · Tusla Early Years Inspectorateapprox. 495 m
    The Village Montessori · Crèche14 May 2025 · report · Tusla Early Years Inspectorateapprox. 495 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Meath County Council.
    Homes approved
    Here11
    Council middle0
    Homes started
    Here58
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    1% of homes built before 1971 (council 18%). 91% owner-occupied (council 75%).

    Homes built before 1971
    1% · council 18%
    Homes built since 2001
    80% · council 45%
    Owner-occupied
    91% · council 75%
    Rented
    7% · council 20%
    Children under 15
    25% · council 23%
    Aged 65 and over
    3% · council 12%
    Households with 2+ cars
    68% · council 54%
    Work mainly from home
    18% · council 11%
    This small area (243 people)Meath

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 167065023/02

    Bus
    61 m
    Carne Wood · NV1 · busiest stop within 500 m: 2 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Homes sold nearby
    32
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    None nearby.

      Stops 10

      • Carne Wood · NV1 · 2/hour at peak · 61 m
      • Carne Wood · NV1 · 2/hour at peak · 89 m
      • Cois Glaisín · NV1 · 2/hour at peak · 337 m
      • Cois Glaisín · NV1 · 2/hour at peak · 362 m
      • Johnstown · NV1 · 2/hour at peak · 395 m
      • Johnstown · NV1 · 2/hour at peak · 417 m
      • Kilcarn · 109, 109A, 179, DY01 · 4/hour at peak · 640 m
      • Boyne View · 110D, NV1, NX · 6/hour at peak · 658 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 29 Oct 2026, 02:14
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Council consultation portalsPublic29 Oct 2026, 01:01open
      Council meetings (ModernGov)Public29 Oct 2026, 02:14open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. The development will (211731) refused 2021: built anyway?
        Ask for: The seller's answer and your surveyor's check.
        Seller · solicitor
      2. On the vacant land tax map: is the 3% tax being paid?
        Ask for: Your solicitor's check of liability or exemption.
        Solicitor
      3. Stalled build 90 m away (Kilcarn Woods 2, Navan): what happens next?
        Ask for: The planning file for NA/180276.
        Council
      4. 11 homes approved 93 m away (Kilcarn), not started: what is planned?
        Ask for: The planning file for 2457.
        Council
      5. Decision 138 m away can be appealed until 16 Nov 2026: appeal?
        Ask for: The decision on the council's website (€220 to appeal).
        Council
      6. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Kilcarn
      Electoral division
      Navan Rural
      Electoral area
      Navan
      Council
      Meath County Council
      Everything we found, as a list 8 lines
      • 2 applications on this site; latest 211731, refused 2021.
      • Zoned R1 (new residential); not protected; on the vacant land tax map.
      • 5 sites nearby could change: 1 stalled build, 1 approved scheme, 3 empty zoned plots.
      • 11 homes approved nearby, not started; largest 11 at Kilcarn.
      • Carne Wood (bus NV1) 89 m away: 2 an hour at morning peak; 11 from all stops within 500 m.
      • Here (2022 census): 90% owner-occupied (council 75%); 18% of homes empty (council 6%); most built 2016 or later; 64% drive to work (council 64%); population up 14% since 2016.
      • 1 home extension within 250 m since 2026.
      • Around here the council decides in a median 54 days (about 8 weeks); 1 in 3 is asked for more information.
      What the terms mean 8 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • Permission for work already done (Retention permission): An application to keep something that was built without permission.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
      Sources and licences 27
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.029 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public29 Oct 2026
      www2.courts.ie—© the publisher28 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public29 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.029 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence29 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 29 Oct 2026, 21:23 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.