Planning report · Meath County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 21:47

Navan Rural ED, The Municipal District of Navan, County Meath, Leinster, Éire / Ireland

53.63837, -6.70545

Homes here mostly date from the 1960s. 1 planning file on this house, the latest from 2024. Home extensions nearby almost always get approved (95%). 97 homes approved 106 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1961–70, around when planning permission began (1964). 1 planning file on this house, the latest from 2024.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1961–1970. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Balreask OldBuilt: most homes in this small area date from 1961–1970 (census estimate)most built2024: 24357 · new house, approved2023: 1 file on Balreask Old2024: 1 file on Balreask Old2025: 1 file on Balreask Old3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2024
    24357 · new house · approved 2024 · not started, runs out 2029
    approvedstartedsigned off
On this site
R1
Zoning · New residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail
ZoningR1 · New residential
What it says

A2 - New Residential: New Residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

meath county development plan 2021 2027 · 3 Nov 2021 – 2 Nov 2027

ZoningR1 · New residential
What it says

A2 - New Residential: New Residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

meath county development plan 2021 2027 as varied · 3 Nov 2021 – 2 Nov 2027

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Anglo Beef Processors Ireland Unlimited Company (791 m); Sherlock Brothers Limited (831 m)

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 44% approved, and 1 in 5 is asked for more information.

New house in a garden or site18 decided · more info asked 22%
44% · council 75%
Approved nearbyMeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 18 nearby, 1,651 council-wide

Figure 3

Balreask Old, file by file since 2023

3 planning files on Balreask Old since 2023, by kind and decision.2023202420252026Extensions, atticsPorches, roofs, otherNo number · 2023 · other work · approved · 23625No number · 2024 · other work · approved · 24357No number · 2025 · other work · approved · 2560718New house in a side garden
ApprovedRefusedWithdrawn or invalid

3 files with "Balreask Old" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2023–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 3 is asked for more information, which adds about 96 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 3): 152 days; Appeal window: 4 weeks; Building starts: 131 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 49–54 (n=26)52 daysIf more info asked (1 in 3)With further information: median 152 days (n=12)152 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 131 days after permission (n=17)131 days after permissionSigned off41% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated38 decided home extensions, 17 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 2 appealed refusals became permissions. 1 of 2 appealed approvals were reversed.

    Refusals appealed2 decided
    1 became permissions
    Approvals appealed2 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Navan Rural ED, The Municipal District of Navan, County Meath, Leinster, Éire / Ireland with 5 numbered planning items
    ⌖ the houseWindow closingApproved, not startedBuilding startedEmpty land zoned for homesNo decision yet
    1. 116 Reask Green, Commons Road 2661052Approved with conditions · 258 m
    2. 2An Existing Creche Building at Robinrath Drive 2660662Approved, no sign building has started · 106 m
    3. 3Robinrath, Navan 25/60718Building started · 150 m
    4. 42.6 ha zoned for homesEmpty land zoned for homes · 0 m
    5. 5TJ O Mahonys, Commons Road Navan 2660858No decision yet · 232 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 12 permissions since 2016, 7 show a start notice and 5 have a completion certificate.

    14 applications lodged within 500 m. Council: 12 approved, 2 refused. After appeals: 12 approved. Of those: 5 signed off, 1 built with the owner's opt-out, 1 started, 5 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT12: lodged → approved2: lodged → refused12: approved → approved2: refused → refused5: approved → no start notice found1: approved → built, owner opted out1: approved → started, not signed off5: approved → signed off14 lodged14 lodged12 approved12 approved2 refused2 refused12 approved12 approved2 refused2 refused5 no start notice found5 no start notice found1 built, owner opted out1 built, owner opted out1 started, not signed off1 started, not signed off5 signed off5 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured14 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 6 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-06 2661052: CONDITIONAL — new single storey extension to rear of existing dwellingtoday5 Nov10 Nov15 Nov20 Nov25 Nov30 Nov2661052: CONDITIONAL — new single storey extension to rear of existing dwelling · 258 m away · 2026-11-06
    Time to appeal ends
    • Time to appeal ends 6 Nov 20266 days left
      12661052 · CONDITIONAL — new single storey extension to rear of existing dwelling
      €220 to An Coimisiún Pleanála (€110 observer) · 258 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    97 homes 106 m away were approved Sept 2026 with no start notice yet; the permission runs to Sept 2031.

    An Existing Creche… · 97 homes: 97 homes approved Sep 2026, not started202420252026202720282029203020312032An Existing Creche… · 97 homes106 m · 266066297 homes approved Sep 2026, not started97 homes approved Sep 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 2 within 500 m

    Approved, not started 1

    Empty land zoned for homes 1

    • 42.6 ha zoned for homes · no homes built on it yet · 0 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 1 and 3 a year; busiest 2022. 86% of decisions were approvals.

    2021: 3, 2022: 3, 2023: 3, 2024: 2, 2025: 1, 2026: 205102021: 3 approved3’21*2022: 3 approved3’222023: 1 approved2023: 2 refused3’232024: 2 approved2’242025: 1 approved1’252026: 2 approved2’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 4 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 2 in the last 12 months
    2 not signed off
    • 3Robinrath, Navan, Meath · 3 Nov 2026 · 96 homes · start notice not signed off · 25/60718 · 150 m
    • 4 Robinrath Drive, An Uaimh, Meath · 23 Jul 2026 · 7-day notice not signed off · 23403 · 102 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Homes coming 97 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Little Tots Montessori · Crèche9 May 2025 · report · Tusla Early Years Inspectorate807 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Meath County Council.
    Homes approved
    Here317
    Council middle0
    Homes started
    Here198
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    56% of homes built before 1971 (council 18%). 74% owner-occupied (council 75%).

    Homes built before 1971
    56% · council 18%
    Homes built since 2001
    14% · council 45%
    Owner-occupied
    74% · council 75%
    Rented
    21% · council 20%
    Children under 15
    10% · council 23%
    Aged 65 and over
    21% · council 12%
    Households with 2+ cars
    47% · council 54%
    Work mainly from home
    12% · council 11%
    This small area (190 people)Meath

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 167065078

    Bus
    295 m
    Reask Court · 189, NV2 · busiest stop within 500 m: 2 an hour at peak
    Nearest school
    363 m
    Navan Educate Together NS, 213 pupils
    Homes sold nearby
    11
    in 3 years, 7 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Navan Educate Together NS · primary · 213 pupils · 363 m

    Stops 6

    • Reask Court · 189, NV2 · 2/hour at peak · 295 m
    • Reask Court · 189, NV2 · 2/hour at peak · 357 m
    • Claremont Stadium · 189, NV2 · 2/hour at peak · 493 m
    • Claremont Stadium · 189, NV2 · 2/hour at peak · 522 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Navan Educate Together NS · 363 m-4.9% pupils (213)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. New house (24357) approved 2024, not started: still planned?
      Ask for: The grant, and whether it stays with the house.
      Seller · solicitor
    2. On the vacant land tax map: is the 3% tax being paid?
      Ask for: Your solicitor's check of liability or exemption.
      Solicitor
    3. 97 homes approved 106 m away (An Existing Creche Building…), not started: what is planned?
      Ask for: The planning file for 2660662.
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Balreask Old
    Electoral division
    Navan Rural
    Electoral area
    Navan
    Council
    Meath County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 24357, approved 2024, not started, runs out 2029.
    • Zoned R1 (new residential); not protected; on the vacant land tax map.
    • 2 sites nearby could change: 1 approved scheme, 1 empty zoned plot.
    • 97 homes approved nearby, not started; largest 97 at An Existing Creche Building at….
    • Reask Court (bus 189, NV2) 295 m away: 2 an hour at morning peak; 7 from all stops within 500 m.
    • Here (2022 census): 74% owner-occupied (council 75%); 12% of homes empty (council 6%); most built 1961–1970; 68% drive to work (council 64%); population up 14% since 2016.
    • Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
    • Homes started within 1 km: 98 in the last year, 1 three years before.
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 25
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher30 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 31 Oct 2026, 21:47 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.