PlanningRegister.ie
Planning report · Meath County Council · 500 m around the house · the last 12 months · 11 Oct 2026, 23:05

Oak Vale, Johnstown

53.64705, -6.65907

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (94%). 1 application nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BailisBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2017: 6 files on Bailis2018: 2 files on Bailis2019: 1 file on Bailis2021: 6 files on Bailis2022: 1 file on Bailis2023: 1 file on Bailis2024: 1 file on Bailis2025: 1 file on Bailis19 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

A1 - Existing Residential: Existing Residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

meath county development plan 2021 2027 · 3 Nov 2021 – 2 Nov 2027

ZoningR2 · Existing residential
What it says

A1 - Existing Residential: Existing Residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

meath county development plan 2021 2027 as varied · 3 Nov 2021 – 2 Nov 2027

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares1
Monuments5House - 17th century; Cistern
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: zoning, rzlt, constraints, constraints.radon, constraints.smr · fetched 4 Oct 2026, 23:11
SourceLicenceFetchedLink
zoningCC-BY-4.04 Oct 2026, 23:11open
rzltCC-BY-4.04 Oct 2026, 23:59open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.radonCC-BY-4.027 Sept 2026, 19:36open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 10 Oct 2026, 23:46
SourceLicenceFetchedLink
bcmsCC-BY-4.010 Oct 2026, 23:46open
npadCC-BY-4.011 Oct 2026, 01:43open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 91–97% by type. A new house in a garden is harder: 91% approved, and 1 in 4 is asked for more information.

Single-storey rear28 decided · more info asked 7%
96% · council 98%
Single-storey side11 decided · more info asked 45%
91% · council 97%
Attic or dormer31 decided · more info asked 23%
97% · council 92%
New house in a garden or site11 decided · more info asked 27%
91% · council 78%
Approved nearbyMeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 81 nearby, 4,675 council-wide

Figure 3

Bailis, file by file since 2017

4 of 4 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

19 planning files on Bailis since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo number · 2017 · single-storey rear · approved · NA171341No. 29 · 2021 · attic conversion / dormer · approved · 212185No number · 2021 · single-storey rear · approved · 212307No number · 2021 · other extension · approved · 212386Porches, roofs, otherNo number · 2017 · other work · approved · NA170207No. 5 · 2017 · other work · approved · NA170619No. 9 · 2017 · other work · approved · NA170841No number · 2017 · other work · approved · NA171319No number · 2017 · other work · approved · NA171515No number · 2018 · other work · approved · NA181229No number · 2019 · other work · approved · NA191200No number · 2021 · other work · approved · 211334No number · 2021 · other work · approved · 212071No number · 2021 · other work · approved · 2121No number · 2022 · other work · refused · 221577No number · 2023 · other work · refused · 2360342No number · 2025 · other work · refused · 2513New house in a side gardenNo number · 2018 · new house · approved · NA181282No number · 2024 · new house · approved · 2460365
ApprovedRefusedWithdrawn or invalid

19 files with "Bailis" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic10—

On Bailis Downs: 7 extensions in 10 years, 100% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 11 Oct 2026, 01:43
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Oct 2026, 01:43open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    npadCC-BY-4.011 Oct 2026, 01:43open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days. 1 in 5 is asked for more information, which adds about 90 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 5): 147 days; Appeal window: 4 weeks; Building starts: 142 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–55 (n=103)53 daysIf more info asked (1 in 5)With further information: median 147 days (n=24)147 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 142 days after permission (n=11)142 days after permissionSigned off73% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated127 decided home extensions, 11 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 4 appealed refusals became permissions. 5 of 9 appealed approvals were reversed.

    Refusals appealed4 decided
    0 became permissions
    Approvals appealed9 decided
    5 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months
    • 500522 Refused · Old Road, Bailis, Athlumney, Navan, Co. Meath · 377 m
    • 324256 Pending · 25 Rowan Glen, Navan, Co Meath · 405 m
    Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    courtsall-rights-reserved11 Oct 2026, 01:26open
    npadCC-BY-4.011 Oct 2026, 01:43open
    Question 4

    What's changing around you?

    Street map around Oak Vale, Johnstown with 9 numbered planning items
    ⌖ the houseOpen for commentsEmpty land zoned for homesNo decision yetApprovedRefused
    1. 132 Oak Vale Bailis Downs, Johnstown Navan 2661197No decision yet · 34 m
    2. 21.7 ha zoned for homesEmpty land zoned for homes · 485 m
    3. 3Kentstown Road Athlumney, Navan 2661045No decision yet · 208 m
    4. 417 Rowan Glen, Athlumney 2688No decision yet · 390 m
    5. 55 Maple avenue, Johnstown wood 2561275Approved with conditions · 391 m
    6. 621 Birch Close, Johnstown Wood 2660239Approved with conditions · 415 m
    7. 711 Dunville Lawn, Athlumney 2561112Approved with conditions · 437 m
    8. 8Ground Floor 61 Wood Stream, Old Road 2660042Refused · 445 m
    9. 9No. 16 The Court, Athlumney Abbey 2660113Approved with conditions · 467 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 58 permissions since 2016, 7 show a start notice and 5 have a completion certificate.

    64 applications lodged within 500 m. Council: 58 approved, 6 refused. After appeals: 58 approved. Of those: 5 signed off, 2 built with the owner's opt-out, 0 started, 35 with no start notice found, 16 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT58: lodged → approved6: lodged → refused58: approved → approved6: refused → refused35: approved → no start notice found2: approved → built, owner opted out5: approved → signed off16: approved → ran out64 lodged64 lodged58 approved58 approved6 refused6 refused58 approved58 approved6 refused6 refused35 no start notice found35 no start notice found2 built, owner opted out2 built, owner opted out5 signed off5 signed off16 ran out16 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured64 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 2 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-02 2661197: application received — the work will comprise of a 38. 42sq.m conversion to the attic consisting of a bedroom, bathroom and a storage closet antoday16 Oct21 Oct26 Oct31 Oct5 Nov10 Nov2661197: application received — the work will comprise of a 38. 42sq.m conversion to the attic consisting of a bedroom, bathroom and a storage closet an · 34 m away · 2026-11-02
    Comments close
    • Comments close 2 Nov 202622 days left
      12661197 · application received — the work will comprise of a 38. 42sq.m conversion to the attic consisting of a bedroom, bathroom…
      €20 to the council · 34 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 1 within 500 m

    Empty land zoned for homes 1

    • 21.7 ha zoned for homes · no homes built on it yet · 485 m

    Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

    Sources: acp, bcms, derelict, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    derelictCC-BY-4.05 Oct 2026, 09:35open
    npadCC-BY-4.011 Oct 2026, 01:43open
    Figure 8

    Applications within 500 m, by year

    Between 5 and 10 a year; busiest 2024. 91% of decisions were approvals.

    2017: 6, 2018: 6, 2019: 6, 2021: 9, 2022: 5, 2023: 9, 2024: 10, 2025: 10, 2026: 305102017: 6 approved6’17*2018: 6 approved6’182019: 6 approved6’192021: 9 approved9’212022: 4 approved2022: 1 refused5’222023: 8 approved2023: 1 refused9’232024: 9 approved2024: 1 refused10’242025: 8 approved2025: 2 refused10’252026: 2 approved2026: 1 refused3’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 16 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 11 Oct 2026, 01:43
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Oct 2026, 01:43open
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    Building work nearby 1 in the last 12 months
    1 no sign-off needed
    • 5 Maple Avenue, Johnstown Wood, Meath, C15 YDW0 · 29 Apr 2026 · short notice no sign-off needed · 25/61275 · 405 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 10 Oct 2026, 23:46
    SourceLicenceFetchedLink
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    Homes coming 0 not started
    • Bailis · 42 homes · building started · 341 m
    • Bailis · 31 homes · ran out · runs out 20 Jan 2025 · 435 m
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    npadCC-BY-4.011 Oct 2026, 01:43open
    social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Bailis Downs · 8 applications in 10 years · 100% approved · most common: attic conversion / dormer

    Crèches and schools inspected

    NameLatest inspectionDistance
    Wonderkids Limited · Crèche27 Sept 2024 · report · Tusla Early Years Inspectorate163 m
    Giraffe Childcare Limited · Crèche19 Jun 2025 · report · Tusla Early Years Inspectorate309 m
    The Childrens House · Crèche28 Nov 2024 · report · Tusla Early Years Inspectorate380 m
    Flowers Montessori & Playschool · Crèche21 Oct 2025 · report · Tusla Early Years Inspectorate541 m
    Happy Ever After Playschool · Crèche1 Mar 2024 · report · Tusla Early Years Inspectorate541 m
    St. Stephen's Pre- School · Crèche10 Sept 2024 · report · Tusla Early Years Inspectorate900 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: estates, schools, tusla_ey · fetched 27 Sept 2026, 20:18
    SourceLicenceFetchedLink
    estatesODbL-1.0 (OSM) + CC-BY-SA-4.0 (NHDS) + CC-BY-4.0 (Kildare)27 Sept 2026, 20:18open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
    How busy is this area Busier than most of Meath County Council.
    Homes approved
    Here628
    Council middle0
    Homes started
    Here403
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    npadCC-BY-4.011 Oct 2026, 01:43open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    2% of homes built before 1971 (council 18%). 63% owner-occupied (council 75%).

    Homes built before 1971
    2% · council 18%
    Homes built since 2001
    31% · council 45%
    Owner-occupied
    63% · council 75%
    Rented
    34% · council 20%
    Children under 15
    30% · council 23%
    Aged 65 and over
    4% · council 12%
    Households with 2+ cars
    42% · council 54%
    Work mainly from home
    7% · council 11%
    This small area (452 people)Meath

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 167065066

    Bus
    265 m
    Bailis · 188, NV1 · busiest stop within 500 m: 5 an hour at peak
    Nearest school
    693 m
    St Marys Special School, 83 pupils
    Homes sold nearby
    47
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • St Marys Special School · primary · 83 pupils · 693 m
    • Coláiste na Mí · postprimary · 913 pupils · 693 m
    • St Stephens Ns · primary · 805 pupils · 900 m

    Stops 20

    • Bailis · 188, NV1 · 3/hour at peak · 265 m
    • Metges Place · NV1 · 2/hour at peak · 272 m
    • Metges Place · NV1 · 2/hour at peak · 285 m
    • Bailis · 188, NV1 · 2/hour at peak · 285 m
    • Johnstown Centre · 110D, NV1, NX · 5/hour at peak · 400 m
    • Bóthar Sion · NX · 2/hour at peak · 426 m
    • Bóthar Sion · NX · 4/hour at peak · 439 m
    • Johnstown Centre · 110D, NV1, NX · 4/hour at peak · 465 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Marys Special School · 693 m+5.1% pupils (83)
    • Coláiste na Mí · 693 m+4.6% pupils (913)
    • St Stephens Ns · 900 m+0.5% pupils (805)
    Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 4 Oct 2026, 23:41
    SourceLicenceFetchedLink
    gtfsCC-BY-4.04 Oct 2026, 23:41open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    npadCC-BY-4.011 Oct 2026, 01:43open
    consultpublic11 Oct 2026, 01:25open
    moderngovpublic11 Oct 2026, 01:26open
    lda_landsCC-BY-4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 34 m away open for comments until 2 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Bailis
    Electoral division
    Navan Rural
    Electoral area
    Navan
    Council
    Meath County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 1 site nearby could change: 1 empty zoned plot.
    • 1 application open for comments nearby; nearest closes 2 Nov 2026.
    • Johnstown Centre (bus 110D, NV1) 400 m away: 5 an hour at morning peak; 24 from all stops within 500 m.
    • Here (2022 census): 62% owner-occupied (council 75%); 2% of homes empty (council 6%); most built 1991–2000; 67% drive to work (council 64%); population up 14% since 2016.
    • 1 home extension within 250 m since 2026. On Bailis Downs: 7 in 10 years, 100% approved.
    • Around here the council decides in a median 54 days (about 8 weeks); 1 in 3 is asked for more information.
    • Homes started within 1 km: 335 in the last year, 29 three years before.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.010 Oct 2026
    data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
    dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public11 Oct 2026
    www2.courts.ie—all-rights-reserved11 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.05 Oct 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL-1.0 (OSM) + CC-BY-SA-4.0 (NHDS) +…27 Sept 2026
    transportforireland.ieNational Transport AuthorityCC-BY-4.04 Oct 2026
    lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)public11 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.011 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…11 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.04 Oct 2026
    gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
    gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.04 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 11 Oct 2026, 23:05 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.