Homes here mostly date from before 1919. Home extensions nearby almost always get approved (96%). 57 homes approved 424 m away haven't started.

See on the mapWatch this area

Not held yet for Louth County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 48 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of DroghedaBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2021: 30 files on Drogheda2022: 25 files on Drogheda2023: 27 files on Drogheda2024: 25 files on Drogheda2025: 25 files on Drogheda2026: 12 files on Drogheda144 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
C1.1
Zoning · Retail warehousing
Yes
Protected or listed · inside the zone around a recorded monument (LH024-041105-)
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningC1.1 · Retail warehousing
What it says

Town or Village Centre: To support the development, improvement and expansion of town or village centre activities.

Zoned for bulky-goods retail warehousing — large sheds, large car parks.

louth county development plan · 11 Nov 2021 – 1 Jan 2027

Protected building28 within 100 m on the council's record (not republished); on the council's record (not republished)
Heritage inventory23 within 100 m house; house
Monument zoneOn this site Excavation - miscellaneous, Moneymore; House - medieval, Moneymore

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Superwarm Homes (Limerick) Limited (995 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings233Westgate Mill
Radon grid squares1
Monuments79Historic town; Religious house - Dominican friars
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Sites and Monuments Record, SMR zones of notification, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), EPA radon map · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Records of Protected StructuresNo licence stated · shown as a yes/no only—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92–100% by type. A new house in a garden is harder: 95% approved, and 1 in 2 is asked for more information.

Single-storey rear37 decided · more info asked 14%
100% · council 98%
Two-storey rear17 decided · more info asked 24%
100% · council 93%
Attic or dormer13 decided · more info asked 15%
92% · council 92%
First-floor13 decided · more info asked 23%
100% · council 95%
New house in a garden or site19 decided · more info asked 47%
95% · council 58%
Approved nearbyLouth overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 99 nearby, 1,268 council-wide

Figure 3

Drogheda, file by file since 2021

24 of 25 decided extensions on the road were approved. New houses in side gardens or on sites: 4 of 4.

144 planning files on Drogheda since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 4 · 2021 · first-floor · approved · 211460No. 17 · 2021 · single-storey rear · approved · 21376No. 1 · 2021 · first-floor · approved · 21727No. 4 · 2021 · attic conversion / dormer · approved · 21945No. 5 · 2021 · rear · approved · 21960No. 24 · 2022 · single-storey rear · approved · 22146No. 18 · 2022 · two-storey rear · approved · 22372No. 17 · 2022 · first-floor · approved · 22488No. 25 · 2022 · single-storey rear · approved · 2267No. 391 · 2022 · single-storey rear · approved · 22693No. 31 · 2022 · single-storey rear · approved · 22839No number · 2022 · garage conversion · approved · 22914No. 1 · 2022 · single-storey rear · approved · 22971No. 13 · 2023 · other extension · approved · 23446No. 39 · 2024 · rear · approved · 2460116No. 25 · 2024 · two-storey rear · approved · 2460168No. 115 · 2024 · first-floor · approved · 2460535No. 14 · 2024 · single-storey rear · approved · 2460671No. 73 · 2024 · two-storey rear · approved · 2487No number · 2025 · other extension · refused · 2523No. 15 · 2025 · attic conversion / dormer · approved · 2560461No. 61 · 2025 · side · approved · 2560516No. 37 · 2026 · single-storey rear · approved · 2660111No. 9 · 2026 · single-storey rear · approved · 2660152No. 88 · 2026 · rear · approved · 2660521Porches, roofs, otherNo number · 2021 · other work · approved · 211023No. 75 · 2021 · other work · approved · 211068No. 6 · 2021 · other work · approved · 2111No number · 2021 · other work · approved · 211109No. 13 · 2021 · other work · approved · 211128No. 43 · 2021 · other work · approved · 211202No. 6E · 2021 · other work · approved · 21122No. 12 · 2021 · other work · approved · 21140No. 79 · 2021 · other work · refused · 21148No. 43 · 2021 · other work · approved · 211542No number · 2021 · other work · approved · 21258No. 31 · 2021 · other work · approved · 21396No. 13 · 2021 · other work · approved · 21494No number · 2021 · other work · approved · 21625No number · 2021 · other work · approved · 21752No number · 2021 · other work · approved · 21760No. 14 · 2021 · other work · approved · 21801No. 6 · 2021 · other work · approved · 21808No. 115 · 2021 · other work · approved · 21850No. 117 · 2021 · other work · approved · 21853No. 14 · 2021 · other work · refused · 21862No number · 2021 · other work · approved · 21885No number · 2021 · other work · approved · 21930No. 8 · 2021 · other work · approved · 21934No. 21 · 2021 · other work · approved · 21977No. 25 · 2022 · other work · approved · 22115No. 117 · 2022 · other work · approved · 22178No number · 2022 · other work · approved · 22240No. 115 · 2022 · other work · approved · 22246No number · 2022 · other work · refused · 22257No. 2 · 2022 · other work · approved · 22334No number · 2022 · other work · approved · 2250No number · 2022 · other work · approved · 22520No. 1 · 2022 · other work · approved · 22559No. 32 · 2022 · other work · approved · 22567No. 47 · 2022 · other work · approved · 2260No. 41 · 2022 · other work · approved · 22652No number · 2022 · other work · refused · 22687No. 14 · 2022 · other work · approved · 22826No. 14 · 2022 · other work · approved · 22831No number · 2022 · other work · refused · 22992No. 31 · 2023 · other work · approved · 23223No. 6 · 2023 · other work · approved · 2328No. 10 · 2023 · other work · approved · 23383No number · 2023 · other work · approved · 2360028No. 35 · 2023 · other work · approved · 2360042No. 13 · 2023 · other work · approved · 2360044No. 1 · 2023 · other work · approved · 2360068No. 115 · 2023 · other work · approved · 2360075No. 117 · 2023 · other work · approved · 2360076No. 79 · 2023 · other work · approved · 2360104No. 1 · 2023 · other work · refused · 2360128No. 6A · 2023 · other work · approved · 2360188No. 7 · 2023 · other work · refused · 2360195No. 2 · 2023 · other work · approved · 2360212No. 87 · 2023 · other work · refused · 2360215No. 35 · 2023 · other work · refused · 2360259No. 6 · 2023 · other work · approved · 2360293No number · 2023 · other work · approved · 2360324No. 104 · 2023 · other work · approved · 2360327No. 71 · 2023 · other work · approved · 2360344No. 1 · 2023 · other work · approved · 2360350No number · 2023 · other work · approved · 2360410No. 3 · 2023 · other work · approved · 2360534No number · 2023 · other work · approved · 2390No. 104 · 2024 · other work · approved · 24132No. 104 · 2024 · other work · approved · 24133No. 29 · 2024 · other work · approved · 24152No. 1 · 2024 · other work · approved · 24206No number · 2024 · other work · approved · 24214No number · 2024 · other work · approved · 24226No. 7 · 2024 · other work · approved · 2460064No. 7 · 2024 · other work · approved · 2460151No. 13 · 2024 · other work · approved · 2460469No. 39 · 2024 · other work · refused · 2460528No. 63 · 2024 · other work · approved · 2460539No. 52 · 2024 · other work · refused · 2460553No. 5 · 2024 · other work · approved · 2460578No. 115 · 2024 · other work · approved · 2460601No. 117 · 2024 · other work · approved · 2460602No. 39 · 2024 · other work · approved · 2460625No. 95 · 2024 · other work · refused · 2460681No number · 2024 · other work · approved · 2460750No number · 2024 · other work · refused · 2460772No. 23 · 2025 · other work · approved · 2560013No. 32 · 2025 · other work · approved · 2560101No. 9 · 2025 · other work · refused · 2560203No. 8 · 2025 · other work · approved · 2560284No. 6 · 2025 · other work · approved · 2560304No number · 2025 · other work · refused · 2560412No. 6 · 2025 · other work · approved · 2560458No. 4 · 2025 · other work · approved · 2560521No. 2 · 2025 · other work · approved · 2560605No. 1 · 2025 · other work · approved · 2560634No. 27 · 2025 · other work · approved · 2560635No. 17 · 2025 · other work · approved · 2560661No number · 2025 · other work · approved · 2560671No. 7 · 2025 · other work · approved · 2560696No number · 2025 · other work · approved · 2560706No number · 2025 · other work · approved · 2560717No number · 2025 · other work · approved · 2560720No. 84 · 2025 · other work · approved · 2560723No. 105 · 2025 · other work · approved · 2560726No number · 2025 · other work · approved · 2560770No. 128 · 2025 · other work · refused · 259No. 128 · 2025 · other work · approved · 2598No. 20 · 2026 · other work · approved · 2660007No number · 2026 · other work · refused · 2660033No. 8 · 2026 · other work · approved · 2660060No. 11 · 2026 · other work · approved · 2660065No. 39 · 2026 · other work · approved · 2660074No. 12 · 2026 · other work · refused · 2660331No. 14 · 2026 · other work · approved · 2660404No. 76 · 2026 · other work · approved · 2660525No. 38 · 2026 · other work · approved · 2660596New house in a side gardenNo. 1 · 2022 · new house · approved · 225421No. 35 · 2023 · new house · approved · 236052235No. 38 · 2023 · new house · approved · 239No number · 2024 · new house · approved · 24109
ApprovedRefusedWithdrawn or invalid

144 files with "Drogheda" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

1 approved2 no decision or withdrawn
KindAppliedApprovedRefused
Rear21—
Single-storey rear10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 48 days. 1 in 4 is asked for more information, which adds about 176 days. Building starts about 6 months after permission.

    Comments open: 5 weeks · €20; Council decision: 48 days; If more info asked (1 in 4): 224 days; Appeal window: 4 weeks; Building starts: 184 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 48 days, middle half 44–50 (n=104)48 daysIf more info asked (1 in 4)With further information: median 224 days (n=34)224 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 184 days after permission (n=42)184 days after permissionSigned off67% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated138 decided home extensions, 42 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    3 of 10 appealed refusals became permissions. 2 of 10 appealed approvals were reversed.

    Refusals appealed10 decided
    3 became permissions
    Approvals appealed10 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months
    • 501863 Pending · 'Bells Court' Scholes Lane , and adjacent lands to the rear of Nos.… · 130 m
    • 324143 Pending · 10 Shop Street, Drogheda, Co. Louth, A92 AXD5. · 212 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher29 Oct 2026, 23:11open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Question 4

    What's changing around you?

    Street map around Stockwell Lane with 15 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedAppealBuilding startedApprovedNo decision yet
    1. 1Bodyright Physiotherapy, 27 Fair Street 2660706No decision yet · 182 m
    2. 211 Highfield, Drogheda 2660694No decision yet · 345 m
    3. 326 28 29 30 & 31 George's Street & Trinity Gardens 21396Approved, no sign building has started · 424 m
    4. 4Gravel Walk 2360028Approved, no sign building has started · 484 m
    5. 5'Bells Court' Scholes Lane, and adjacent lands to the rear of Nos. 19-27 Fair Street and to the rear of Nos. 75-84 West Street 501863Appeal: no decision yet · 130 m
    6. 639 West Street, Drogheda 2660074Building started · 122 m
    7. 788 West Street, Drogheda 2660521Approved with conditions · 62 m
    8. 8"Mahers totalhealth Chemist" 105 West Street, Drogheda 2560726Approved with conditions · 96 m
    9. 9Apartment 1 39 West Street, Drogheda 2660074Approved with conditions · 113 m
    10. 10Dominic House, Dominick Street Drogheda 2560706Approved with conditions · 118 m
    11. 118 West Street, Drogheda 2660060Approved with conditions · 134 m
    12. 1274-76 West Street, Drogheda 2660525Approved with conditions · 164 m
    13. 13Unit 11 Fitzwilliam Court, Dyer Street 2660065Approved with conditions · 194 m
    14. 1437/38 Shop Street, Drogheda 2660596Approved with conditions · 222 m
    15. 15Site to the rear of Corrigan’s Pub 91-93 George’s Street, and rear of 94 and 95 George’s Street and the Boyne Centre at Bolton Street 2660619No decision yet · 324 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 102 permissions since 2016, 30 show a start notice and 9 have a completion certificate.

    121 applications lodged within 500 m. Council: 102 approved, 19 refused. After appeals: 102 approved. Of those: 9 signed off, 2 built with the owner's opt-out, 19 started, 67 with no start notice found, 5 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT102: lodged → approved19: lodged → refused101: approved → approved17: refused → refused1 approved by the council, refused after an appeal1 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal67: approved → no start notice found2: approved → built, owner opted out19: approved → started, not signed off9: approved → signed off5: approved → ran out121 lodged121 lodged102 approved102 approved19 refused19 refused102 approved102 approved18 refused18 refused1 withdrawn1 withdrawn67 no start notice found67 no start notice found2 built, owner opted out2 built, owner opted out19 started, not signed off19 started, not signed off9 signed off9 signed off5 ran out5 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured121 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 12 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-12 2660694: application received — Permission for modifications to the existing house including a side and rear extension and all associated siteworks; 2026-11-20 2660706: application received — Permission for the following: 1. Single storey extension to rear of existing building comprising of pilates studio, satoday4 Nov9 Nov14 Nov19 Nov24 Nov29 Nov2660694: application received — Permission for modifications to the existing house including a side and rear extension and all associated siteworks · 345 m away · 2026-11-122660706: application received — Permission for the following: 1. Single storey extension to rear of existing building comprising of pilates studio, sa · 182 m away · 2026-11-20
    Comments close
    • Comments close 12 Nov 202613 days left
      22660694 · application received — Permission for modifications to the existing house including a side and rear extension and all…
      €20 to the council · 345 m away
    • Comments close 20 Nov 202621 days left
      12660706 · application received — Permission for the following: 1. Single storey extension to rear of existing building comprising…
      €20 to the council · 182 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    57 homes 424 m away were approved Dec 2021 with no start notice yet; the permission runs to May 2028.

    26 28 29 30 & 31 George's… · 57 homes: 57 homes approved Dec 2021, not started; Gravel Walk · 10 homes: 10 homes approved Dec 2023, not started202120222023202420252026202720282029203026 28 29 30 & 31 George's… · 57 homes424 m · 2139657 homes approved Dec 2021, not started57 homes approved Dec 2021, not startedGravel Walk · 10 homes484 m · 236002810 homes approved Dec 2023, not started10 homes approved Dec 2023, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 2 within 500 m

    Approved, not started 2

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 18 and 24 a year; busiest 2024. 84% of decisions were approvals.

    2021: 23, 2022: 18, 2023: 23, 2024: 24, 2025: 22, 2026: 1101020302021: 21 approved2021: 2 refused23’21*2022: 14 approved2022: 4 refused18’222023: 20 approved2023: 3 refused23’232024: 20 approved2024: 4 refused24’242025: 18 approved2025: 4 refused22’252026: 9 approved2026: 2 refused11’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 40 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    Building work nearby 13 in the last 12 months
    4 signed off as finished7 not signed off2 no sign-off needed
    • Ballymakenny Road, Drogheda, Louth · 27 Oct 2026 · 7-day notice not signed off · 25/60529 · 466 m
    • Ballymakenny Road, Drogheda, Louth · 27 Oct 2026 · 7-day notice not signed off · 25/60529 · 466 m
    • 639 West Street, Drogheda, Louth, A92 XRX9 · 27 Aug 2026 · 1 homes · short notice no sign-off needed · 2660074 · 122 m
    • 20 Saint Laurence Street, Drogheda, Louth, A92 FP2N · 10 Jul 2026 · 7-day notice signed off · 372 m
    • Mayoralty Street, Drogheda, Louth · 9 Jul 2026 · 7-day notice signed off · 19/490 · 365 m
    • 6 Bolton Street, Drogheda, Louth, A92 AW97 · 22 Jun 2026 · 2 homes · start notice not signed off · 21/808 · 260 m
    • 15 Park View, Drogheda, Louth, A92 HPC6 · 3 Apr 2026 · 7-day notice not signed off · 24214 / 24226 · 494 m
    • 80 West Street, Drogheda, Louth, A92 XH95 · 28 Mar 2026 · 5 homes · 7-day notice not signed off · 140 m
    • Dominic Street, Drogheda, Louth, A92 R968 · 27 Feb 2026 · start notice not signed off · 2560706 · 122 m
    • 6 Stockwell Lane, Drogheda, Louth, A92 RD32 · 4 Feb 2026 · 1 homes · 7-day notice not signed off · 2560458 · 120 m
    • Coolfore, Drogheda, Louth, A92E9DK · 28 Dec 2025 · start notice, opted out no sign-off needed · 20194 · 466 m
    • 20 Saint Laurence Street, Drogheda, Louth, A92 FP2N · 12 Nov 2025 · start notice signed off · 372 m
    • Unit 8, Boyne Centre, Bolton Street, Drogheda, Louth, A92 YN40 · 10 Nov 2025 · start notice signed off · 2560284 · 347 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 30 Oct 2026, 02:44
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    Homes coming 67 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Peter Pan Crèche & Montessori · Crèche11 Apr 2024 · report · Tusla Early Years Inspectorate316 m
    The Grove Early Years Education Centre, Lifestyle Development Group CLG · Crèche18 Feb 2026 · report · Tusla Early Years Inspectorateapprox. 461 m
    Just Kids Pre-School and Afterschool · Crèche8 Dec 2025 · report · Tusla Early Years Inspectorate596 m
    Just Kids Creche & Montessori · Crèche2 Mar 2026 · report · Tusla Early Years Inspectorate596 m
    Clever Clogs · Crèche7 Aug 2025 · report · Tusla Early Years Inspectorate698 m
    Little Steps Creche & Pre-School · Crèche25 Sept 2025 · report · Tusla Early Years Inspectorate703 m
    Little Treasures Preschool · Crèche13 Jan 2026 · report · Tusla Early Years Inspectorate993 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Louth County Council.
    Homes approved
    Here182
    Council middle0
    Homes started
    Here107
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    60% of homes built before 1971 (council 28%). 8% owner-occupied (council 67%).

    Homes built before 1971
    60% · council 28%
    Homes built since 2001
    17% · council 33%
    Owner-occupied
    8% · council 67%
    Rented
    86% · council 28%
    Children under 15
    14% · council 21%
    Aged 65 and over
    3% · council 14%
    Households with 2+ cars
    3% · council 38%
    Work mainly from home
    6% · council 10%
    This small area (233 people)Louth

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 147014011

    Bus
    54 m
    West Street · 173 · busiest stop within 500 m: 14 an hour at peak
    Nearest school
    293 m
    S N Naomh Peadar, 92 pupils
    Homes sold nearby
    28
    in 3 years, 28 new (Property Price Register)
    Schools, stops and the council

    Schools

    • S N Naomh Peadar · primary · 92 pupils · 293 m
    • Scoil na mBraithre Sn · primary · 359 pupils · 433 m
    • S N Aonghusa · primary · 147 pupils · 472 m
    • ABACAS School · primary · 31 pupils · 539 m
    • S N Ard Mhuire C · primary · 315 pupils · 589 m
    • St Brigid's and St Patrick's National School · primary · 575 pupils · 722 m
    • Sacred Heart Secondary School · postprimary · 717 pupils · 796 m
    • St Mary's Diocesan School · postprimary · 917 pupils · 804 m

    Stops 36

    • West Street · 173 · 1/hour at peak · 54 m
    • Dominick Street · 173 · 1/hour at peak · 134 m
    • Drogheda Bus · 173, 188, D4, D5 · 5/hour at peak · 244 m
    • Drogheda Bus · 163, D4, D5 · 4/hour at peak · 262 m
    • George's Street · 100, 168, 173, 182, 188, 190 · 6/hour at peak · 307 m
    • George's Street · 100, 168, 182, 188, 190, 901 · 13/hour at peak · 325 m
    • Drogheda Bus · 100, 100X, 101, 101X, 105, 163 · 14/hour at peak · 342 m
    • Scotch Hall · D1, D2 · 4/hour at peak · 386 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • S N Naomh Peadar · 293 m0% pupils (92)
    • Scoil na mBraithre Sn · 433 m+4.1% pupils (359)
    • S N Aonghusa · 472 m-9.3% pupils (147)
    • ABACAS School · 539 m0% pupils (31)
    • S N Ard Mhuire C · 588 m+0.6% pupils (315) · 24 classrooms 2026, no decision yet
    • St Brigid's and St Patrick's National School · 722 m+0.3% pupils (575) · temporary classrooms 2024, approved with conditions
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Council consultation portalsPublic30 Oct 2026, 01:04open
    Council meetings (ModernGov)Public30 Oct 2026, 02:17open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    2. Zoned C1.1 (retail warehousing), not for homes: could you extend?
      Ask for: A solicitor's or planner's view.
      Solicitor · planner
    3. Application 182 m away open for comments until 20 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Moneymore
    Electoral division
    Fair Gate
    Electoral area
    Drogheda Urban
    Council
    Louth County Council
    Everything we found, as a list 8 lines
    • Zoned C1.1 (retail warehousing); monument zone; no vacant land tax.
    • 2 sites nearby could change: 2 approved schemes.
    • 2 applications open for comments nearby; nearest closes 20 Nov 2026.
    • 67 homes approved nearby, not started; largest 57 at 26 28 29 30 & 31 George's Street &….
    • Drogheda Bus (bus 100, 100X) 342 m away: 14 an hour at morning peak; 62 from all stops within 500 m.
    • Here (2022 census): 86% rent (council 28%); 15% of homes empty (council 8%); most built before 1919; 26% drive to work (council 59%); population up 6% since 2016.
    • 3 home extensions within 250 m since 2026. Most were rear extensions.
    • Around here the council decides in a median 51 days (about 7 weeks); 37% are asked for more information.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.030 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public30 Oct 2026
    www2.courts.ie—© the publisher29 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public30 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.030 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence30 Oct 2026
    services-eu1.arcgis.comLocal authorities (Record of Protected Structures)No licence stated · flag only—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 30 Oct 2026, 06:14 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.