PlanningRegister.ie
Planning report · Louth County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 23:29

King Street

53.71686, -6.34799

Homes here mostly date from before 1919. 1 planning file on this house, the latest from 2024. Home extensions nearby almost always get approved (97%). 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Louth County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 48 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 7 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 1 planning file on this house, the latest from 2024.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 1 planning file on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of DroghedaBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2024: 2460578 · work already done, approved2021: 29 files on Drogheda2022: 21 files on Drogheda2023: 27 files on Drogheda2024: 28 files on Drogheda2025: 30 files on Drogheda2026: 14 files on Drogheda149 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2024
    2460578 · work already done · approved 2024 · started, no sign-off needed
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
Yes
Protected or listed · a protected building; inside the zone around a recorded monument (LH024-041088-); a building in the national heritage inventory (13619119)
No
Vacant land tax · lived-in homes don't pay it
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect and enhance the amenity and character of existing residential communities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

louth county development plan · 11 Nov 2021 – 1 Jan 2027

Protected buildingOn this site on the council's record (not republished)
Heritage inventoryOn this site house
Monument zoneOn this site Building, Moneymore; Kiln - lime, Moneymore

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Superwarm Homes (Limerick) Limited (656 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings221house; West End House
Radon grid squares1
Monuments71Historic town; Religious house - Dominican friars
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Sites and Monuments Record, SMR zones of notification, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), EPA radon map · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Records of Protected StructuresNo licence stated · shown as a yes/no only—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 2

Could you extend?

This is a protected building: almost any change, inside or out, needs permission.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 93–100% by type. A new house in a garden is harder: 86% approved, and 1 in 2 is asked for more information.

Single-storey rear41 decided · more info asked 15%
100% · council 98%
Two-storey rear18 decided · more info asked 28%
100% · council 93%
Single-storey side13 decided · more info asked 38%
100% · council 100%
Attic or dormer14 decided · more info asked 14%
93% · council 92%
First-floor12 decided · more info asked 25%
100% · council 95%
New house in a garden or site22 decided · more info asked 41%
86% · council 58%
Approved nearbyLouth overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 120 nearby, 1,339 council-wide

Figure 3

Drogheda, file by file since 2021

27 of 29 decided extensions on the road were approved. New houses in side gardens or on sites: 6 of 6.

149 planning files on Drogheda since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 3 · 2021 · single-storey rear · approved · 211100No. 4 · 2021 · first-floor · approved · 211460No. 198 · 2021 · two-storey rear · approved · 21289No. 17 · 2021 · single-storey rear · approved · 21376No. 1 · 2021 · first-floor · approved · 21727No number · 2021 · side · approved · 21863No. 4 · 2021 · attic conversion / dormer · approved · 21945No. 5 · 2021 · rear · approved · 21960No. 11 · 2022 · attic conversion / dormer · refused · 22280No. 18 · 2022 · two-storey rear · approved · 22372No. 106 · 2022 · two-storey rear · approved · 22468No. 138 · 2022 · first-floor · approved · 22820No number · 2022 · garage conversion · approved · 22914No. 1 · 2022 · single-storey rear · approved · 22971No. 13 · 2023 · other extension · approved · 23446No. 78 · 2023 · attic conversion / dormer · approved · 2363No. 39 · 2024 · rear · approved · 2460116No. 25 · 2024 · two-storey rear · approved · 2460168No number · 2024 · other extension · approved · 2460385No. 8 · 2024 · single-storey side · approved · 2460404No number · 2024 · single-storey side · approved · 2460490No. 115 · 2024 · first-floor · approved · 2460535No. 14 · 2024 · single-storey rear · approved · 2460671No. 15 · 2025 · attic conversion / dormer · approved · 2560461No. 65 · 2025 · other extension · refused · 2560698No. 118 · 2026 · single-storey side · approved · 2660083No number · 2026 · first-floor · approved · 2660116No number · 2026 · other extension · approved · 2660118No. 88 · 2026 · rear · approved · 2660521Porches, roofs, otherNo number · 2021 · other work · approved · 211023No. 6 · 2021 · other work · approved · 2111No number · 2021 · other work · approved · 211109No. 13 · 2021 · other work · approved · 211128No. 43 · 2021 · other work · approved · 211202No. 6E · 2021 · other work · approved · 21122No. 12 · 2021 · other work · approved · 21140No number · 2021 · other work · approved · 21258No. 31 · 2021 · other work · approved · 21396No. 13 · 2021 · other work · approved · 21494No number · 2021 · other work · approved · 21625No. 14 · 2021 · other work · approved · 21801No. 6 · 2021 · other work · approved · 21808No. 115 · 2021 · other work · approved · 21850No. 117 · 2021 · other work · approved · 21853No. 14 · 2021 · other work · refused · 21862No. 80 · 2021 · other work · refused · 21881No number · 2021 · other work · approved · 21885No. 8 · 2021 · other work · approved · 21934No. 25 · 2022 · other work · approved · 22115No. 59A · 2022 · other work · approved · 22122No. 117 · 2022 · other work · approved · 22178No. 1 · 2022 · other work · approved · 22233No number · 2022 · other work · approved · 22240No. 115 · 2022 · other work · approved · 22246No number · 2022 · other work · refused · 22257No number · 2022 · other work · approved · 22443No number · 2022 · other work · approved · 2250No number · 2022 · other work · approved · 22520No. 1 · 2022 · other work · approved · 22559No. 41 · 2022 · other work · approved · 22652No. 14 · 2022 · other work · approved · 22826No. 14 · 2022 · other work · approved · 22831No. 31 · 2023 · other work · approved · 23223No. 6 · 2023 · other work · approved · 2328No. 10 · 2023 · other work · approved · 23383No. 35 · 2023 · other work · approved · 2360042No. 13 · 2023 · other work · approved · 2360044No. 1 · 2023 · other work · approved · 2360068No. 115 · 2023 · other work · approved · 2360075No. 117 · 2023 · other work · approved · 2360076No. 1 · 2023 · other work · refused · 2360128No number · 2023 · other work · refused · 2360132No. 6A · 2023 · other work · approved · 2360188No. 7 · 2023 · other work · refused · 2360195No. 2 · 2023 · other work · approved · 2360212No. 87 · 2023 · other work · refused · 2360215No. 22 · 2023 · other work · approved · 2360260No. 6 · 2023 · other work · approved · 2360293No number · 2023 · other work · approved · 2360324No. 104 · 2023 · other work · approved · 2360327No. 71 · 2023 · other work · approved · 2360344No. 1 · 2023 · other work · approved · 2360350No number · 2023 · other work · approved · 2360410No. 3 · 2023 · other work · approved · 2360534No number · 2023 · other work · approved · 2390No. 104 · 2024 · other work · approved · 24132No. 104 · 2024 · other work · approved · 24133No. 29 · 2024 · other work · approved · 24152No. 1 · 2024 · other work · approved · 24206No number · 2024 · other work · approved · 24214No number · 2024 · other work · approved · 24226No. 7 · 2024 · other work · approved · 2460151No number · 2024 · other work · approved · 2460338No number · 2024 · other work · approved · 2460352No number · 2024 · other work · approved · 2460372No. 13 · 2024 · other work · approved · 2460469No. 39 · 2024 · other work · refused · 2460528No. 52 · 2024 · other work · refused · 2460553No. 5 · 2024 · other work · approved · 2460578No number · 2024 · other work · approved · 2460594No. 115 · 2024 · other work · approved · 2460601No. 117 · 2024 · other work · approved · 2460602No. 39 · 2024 · other work · approved · 2460625No. 95 · 2024 · other work · refused · 2460681No number · 2024 · other work · approved · 2460750No. 23 · 2025 · other work · approved · 2560013No number · 2025 · other work · approved · 2560030No. 32 · 2025 · other work · approved · 2560101No. 9 · 2025 · other work · refused · 2560203No. 8 · 2025 · other work · approved · 2560284No. 6 · 2025 · other work · approved · 2560304No number · 2025 · other work · approved · 2560341No. 10 · 2025 · other work · approved · 2560345No number · 2025 · other work · approved · 2560353No number · 2025 · other work · approved · 2560355No number · 2025 · other work · refused · 2560412No number · 2025 · other work · approved · 2560444No. 6 · 2025 · other work · approved · 2560458No. 12 · 2025 · other work · refused · 2560469No. 62A · 2025 · other work · approved · 2560474No. 4 · 2025 · other work · approved · 2560521No. 2 · 2025 · other work · approved · 2560605No. 1 · 2025 · other work · approved · 2560634No. 27 · 2025 · other work · approved · 2560635No number · 2025 · other work · approved · 2560671No number · 2025 · other work · approved · 2560706No number · 2025 · other work · approved · 2560717No. 84 · 2025 · other work · approved · 2560723No. 105 · 2025 · other work · approved · 2560726No number · 2025 · other work · approved · 2560770No. 9 · 2025 · other work · approved · 2575No. 128 · 2025 · other work · refused · 259No. 128 · 2025 · other work · approved · 2598No. 20 · 2026 · other work · approved · 2660007No number · 2026 · other work · refused · 2660033No. 8 · 2026 · other work · approved · 2660060No. 11 · 2026 · other work · approved · 2660065No. 13 · 2026 · other work · approved · 2660073No. 39 · 2026 · other work · approved · 2660074No. 12 · 2026 · other work · refused · 2660331No number · 2026 · other work · approved · 2660472No. 76 · 2026 · other work · approved · 2660525No. 38 · 2026 · other work · approved · 2660596New house in a side gardenNo. 80 · 2021 · new house · approved · 2113980No. 16 · 2021 · new house · approved · 21982No. 1 · 2022 · new house · approved · 225421No number · 2023 · new house · approved · 2360483No. 38 · 2023 · new house · approved · 239No number · 2024 · new house · approved · 24109
ApprovedRefusedWithdrawn or invalid

149 files with "Drogheda" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 1 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 1 in the last 12 months

  • 2660331 · work already done · refused 4 Sept 2026 · 78 m
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 3

How long, and what if someone objects?

Figure 4

A home extension's journey here

A decision takes 48 days. 1 in 4 is asked for more information, which adds about 168 days. Building starts about 7 months after permission.

Comments open: 5 weeks · €20; Council decision: 48 days; If more info asked (1 in 4): 218 days; Appeal window: 4 weeks; Building starts: 207 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 48 days, middle half 44–50 (n=110)48 daysIf more info asked (1 in 4)With further information: median 218 days (n=35)218 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 207 days after permission (n=43)207 days after permissionSigned off63% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated145 decided home extensions, 43 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 5

What appeals changed

3 of 10 appealed refusals became permissions. 2 of 11 appealed approvals were reversed.

Refusals appealed10 decided
3 became permissions
Approvals appealed11 decided
2 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Appeals nearby 3 in the last 12 months
  • 502087 Pending · Marsh Road (to the east of Scotch Hall Shopping Centre), Drogheda,… · 395 m
  • 501863 Pending · 'Bells Court' Scholes Lane , and adjacent lands to the rear of Nos.… · 435 m
  • 324143 Pending · 10 Shop Street, Drogheda, Co. Louth, A92 AXD5. · 312 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 23:12
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 4

What's changing around you?

Street map around King Street with 15 numbered planning items
⌖ the houseOpen for commentsRefusedBuilding startedNo decision yetApproved
  1. 1Bodyright Physiotherapy, 27 Fair Street 2660706No decision yet · 475 m
  2. 212 Palace Street, Drogheda 2660331Refused · 78 m
  3. 3Dolan’s Corner, Sunday’s Street 2660033Refused · 192 m
  4. 420 Saint Laurence Street, Drogheda SN0014454LHBuilding started · 119 m
  5. 501 Palace Street, Drogheda 2660219No decision yet · 81 m
  6. 620 Laurence Street, Drogheda 2660007Approved with conditions · 97 m
  7. 7Blind Gate House, Bachelors Lane 2560770Approved with conditions · 164 m
  8. 8The Mall, Drogheda 2660239No decision yet · 189 m
  9. 937/38 Shop Street, Drogheda 2660596Approved with conditions · 262 m
  10. 108 West Street, Drogheda 2660060Approved with conditions · 313 m
  11. 11"Mahers totalhealth Chemist" 105 West Street, Drogheda 2560726Approved with conditions · 328 m
  12. 12Marsh Road (to the east of Scotch Hall Shopping Centre), Drogheda 2560717Approved with conditions · 395 m
  13. 13Unit 11 Fitzwilliam Court, Dyer Street 2660065Approved with conditions · 396 m
  14. 1488 West Street, Drogheda 2660521Approved with conditions · 418 m
  15. 15'Bells Court’ Scholes Lane, and adjacent lands to the rear of Nos. 19-27 Fair Street and to the rear of Nos. 75-84 West Street 2560723Approved with conditions · 435 m
Figure 6

What happens to applications within 500 m

Permission isn't building. Of 99 permissions since 2016, 30 show a start notice and 7 have a completion certificate.

113 applications lodged within 500 m. Council: 98 approved, 15 refused. After appeals: 99 approved. Of those: 7 signed off, 3 built with the owner's opt-out, 20 started, 61 with no start notice found, 8 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT98: lodged → approved15: lodged → refused98: approved → approved13: refused → refused1 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal61: approved → no start notice found3: approved → built, owner opted out20: approved → started, not signed off7: approved → signed off8: approved → ran out113 lodged113 lodged98 approved98 approved15 refused15 refused99 approved99 approved13 refused13 refused1 withdrawn1 withdrawn61 no start notice found61 no start notice found3 built, owner opted out3 built, owner opted out20 started, not signed off20 started, not signed off7 signed off7 signed off8 ran out8 ran out

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured113 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 7

The next 30 days

1 deadline within 500 m; the first closes 20 Nov 2026.

1 deadlines in the next 30 days: 2026-11-20 2660706: application received — Permission for the following: 1. Single storey extension to rear of existing building comprising of pilates studio, satoday5 Nov10 Nov15 Nov20 Nov25 Nov30 Nov2660706: application received — Permission for the following: 1. Single storey extension to rear of existing building comprising of pilates studio, sa · 475 m away · 2026-11-20
Comments close
  • Comments close 20 Nov 202620 days left
    12660706 · application received — Permission for the following: 1. Single storey extension to rear of existing building comprising…
    €20 to the council · 475 m away

Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

Figure 8

Approved, stalled or planned, not built yet

DART+ Coastal North is planned 979 m away.

DART+ Coastal North, DART+…: railway order approved (An Coimisiún Pleanála; applied July 2024); DART+ Coastal North, Drogheda…: railway order approved (An Coimisiún Pleanála; applied July 2024)20242025202620272028DART+ Coastal North, DART+…979 m · plannedrailway order approved (An Coimisiún Pleanála; applied July 2024)DART+ Coastal North, Drogheda…985 m · plannedrailway order approved (An Coimisiún Pleanála; applied July 2024)today

Each row is a dated fact from a public register: no score and no forecast.

Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

Figure 9

Applications within 500 m, by year

Between 16 and 22 a year; busiest 2025. 87% of decisions were approvals.

2021: 23, 2022: 16, 2023: 21, 2024: 21, 2025: 22, 2026: 1001020302021: 22 approved2021: 1 refused23’21*2022: 14 approved2022: 2 refused16’222023: 17 approved2023: 4 refused21’232024: 19 approved2024: 2 refused21’242025: 18 approved2025: 4 refused22’252026: 8 approved2026: 2 refused10’26*
ApprovedRefusedWithdrawn or invalidUndecided

2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

Measuredcouncil register via NPAD

Open for comments €20 to comment

Every application within 500 m 30 in the last 12 months

See every application on the map

How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Building work nearby 16 in the last 12 months
7 signed off as finished8 not signed off1 no sign-off needed
  • Ballymakenny Road, Drogheda, Louth · 27 Oct 2026 · 7-day notice not signed off · 25/60529 · 329 m
  • Ballymakenny Road, Drogheda, Louth · 27 Oct 2026 · 7-day notice not signed off · 25/60529 · 329 m
  • Marsh Road, Drogheda, Louth, A92 HF5F · 5 Oct 2026 · 7-day notice not signed off · 372 m
  • Marsh Road, Drogheda, Louth, A92 N627 · 10 Aug 2026 · 7-day notice signed off · 372 m
  • 420 Saint Laurence Street, Drogheda, Louth, A92 FP2N · 10 Jul 2026 · 7-day notice signed off · 119 m
  • Mayoralty Street, Drogheda, Louth · 9 Jul 2026 · 7-day notice signed off · 19/490 · 215 m
  • 6 Bolton Street, Drogheda, Louth, A92 AW97 · 22 Jun 2026 · 2 homes · start notice not signed off · 21/808 · 480 m
  • Marsh Road, Drogheda, Louth, A92 W271 · 15 Jun 2026 · 7-day notice signed off · 372 m
  • Scarlet Street, Drogheda, Louth, A92 DD73 · 8 Jun 2026 · start notice not signed off · 2460490 · 392 m
  • 62 Pearse Park, Drogheda, Louth, A92Y016 · 17 Apr 2026 · 1 homes · 7-day notice not signed off · 2560474 · 454 m
  • Scoth Hall Shopping Centre Marsh Road, Drogheda, Louth, A92 FW99 · 9 Apr 2026 · 7-day notice signed off · 372 m
  • 15 Park View, Drogheda, Louth, A92 HPC6 · 3 Apr 2026 · 7-day notice not signed off · 24214 / 24226 · 494 m
  • 80 West Street, Drogheda, Louth, A92 XH95 · 28 Mar 2026 · 5 homes · 7-day notice not signed off · 486 m
  • Coolfore, Drogheda, Louth, A92E9DK · 28 Dec 2025 · start notice, opted out no sign-off needed · 20194 · 329 m
  • 20 Saint Laurence Street, Drogheda, Louth, A92 FP2N · 12 Nov 2025 · start notice signed off · 120 m
  • Unit 8, Boyne Centre, Bolton Street, Drogheda, Louth, A92 YN40 · 10 Nov 2025 · start notice signed off · 2560284 · 483 m
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Homes coming 0 not started
  • Marsh Road · 172 homes · under appeal · runs out 3 Jul 2036 · 413 m
How we work this out
Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
Named places nearby: estate, schemes, crèches, schools

Named places estate, developments, inspections

Crèches and schools inspected

NameLatest inspectionDistance
Peter Pan Crèche & Montessori · Crèche11 Apr 2024 · report · Tusla Early Years Inspectorate110 m
Little Steps Creche & Pre-School · Crèche25 Sept 2025 · report · Tusla Early Years Inspectorate279 m
Clever Clogs · Crèche7 Aug 2025 · report · Tusla Early Years Inspectorate591 m
Just Kids Pre-School and Afterschool · Crèche8 Dec 2025 · report · Tusla Early Years Inspectorate628 m
Just Kids Creche & Montessori · Crèche2 Mar 2026 · report · Tusla Early Years Inspectorate628 m
The Grove Early Years Education Centre, Lifestyle Development Group CLG · Crèche18 Feb 2026 · report · Tusla Early Years Inspectorateapprox. 886 m
Little Treasures Preschool · Crèche13 Jan 2026 · report · Tusla Early Years Inspectorate957 m
How we work this out
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
SourceLicenceFetchedLink
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
Tusla early years registerPublic register28 Oct 2026, 23:19open
How busy is this area Busier than most of Louth County Council.
Homes approved
Here236
Council middle0
Homes started
Here223
Council middle2
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 5

What's the area like?

Figure 10

This street block against the council

64% of homes built before 1971 (council 28%). 26% owner-occupied (council 67%).

Homes built before 1971
64% · council 28%
Homes built since 2001
11% · council 33%
Owner-occupied
26% · council 67%
Rented
67% · council 28%
Children under 15
13% · council 21%
Aged 65 and over
14% · council 14%
Households with 2+ cars
9% · council 38%
Work mainly from home
5% · council 10%
This small area (215 people)Louth

MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 147014001

Bus
178 m
Magdalene Tower · 101X, 168, 173 · busiest stop within 500 m: 5 an hour at peak
Planned
979 m
DART+ Coastal North, DART+ Coastal North: Malahide - Drogheda (MacBride)
Nearest school
162 m
S N Aonghusa, 147 pupils
Homes sold nearby
468
in 3 years, 51 new (Property Price Register)
Schools, stops and the council

Schools

  • S N Aonghusa · primary · 147 pupils · 162 m
  • Scoil na mBraithre Sn · primary · 359 pupils · 183 m
  • S N Naomh Peadar · primary · 92 pupils · 487 m
  • St Brigid's and St Patrick's National School · primary · 575 pupils · 571 m
  • St Itas Special School · primary · 207 pupils · 578 m
  • Sacred Heart Secondary School · postprimary · 717 pupils · 710 m
  • ABACAS School · primary · 31 pupils · 824 m
  • St Mary's Diocesan School · postprimary · 917 pupils · 934 m

Stops 41

  • Magdalene Tower · 101X, 168, 173 · 1/hour at peak · 178 m
  • Scotch Hall · D1, D2 · 4/hour at peak · 363 m
  • West Street · 173 · 1/hour at peak · 372 m
  • Scotch Hall · D1, D2 · 4/hour at peak · 374 m
  • James Street · 163, 173, D4, D5 · 5/hour at peak · 405 m
  • James Street · 163, D4, D5 · 4/hour at peak · 424 m
  • Hardman's Gdns · 101X, 168, 173 · 1/hour at peak · 430 m
  • Mary Street · 173, UM03 · 1/hour at peak · 454 m

Schools growing or shrinking planning in 3 years · pupils last year

  • S N Aonghusa · 162 m-9.3% pupils (147)
  • Scoil na mBraithre Sn · 183 m+4.1% pupils (359)
  • S N Naomh Peadar · 487 m0% pupils (92)
  • St Brigid's and St Patrick's National School · 571 m+0.3% pupils (575) · temporary classrooms 2024, approved with conditions
  • St Itas Special School · 578 m+6.7% pupils (207)
  • Sacred Heart Secondary School · 710 m+1.6% pupils (717)
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Council consultation portalsPublic31 Oct 2026, 01:06open
Council meetings (ModernGov)Public31 Oct 2026, 02:21open
Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
cso_saps_2022CC BY 4.0—open
National Transport AuthorityCC BY 4.0——
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
EPA strategic noise mapsCC BY 4.0——
Fingal County CouncilCC BY 4.0——
Question 6

What to ask, and who

  1. Work already done (2460578): work kept with permission. Done as approved?
    Ask for: The retention grant and an opinion of compliance.
    Seller · solicitor
  2. Protected building: what changes would you be allowed?
    Ask for: A section 57 declaration from the council.
    Council
  3. Next to a recorded monument: does digging need notice?
    Ask for: Details of past works from the seller.
    Seller · council
  4. Application 475 m away open for comments until 20 Nov 2026: comment?
    Ask for: The plans on the council's website (€20 to comment).
    Council
  5. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.
    Seller · solicitor
Reference

Where this is, the terms, the sources

Townland
Moneymore
Electoral division
Fair Gate
Electoral area
Drogheda Urban
Council
Louth County Council
Everything we found, as a list 8 lines
  • 1 application on this site; latest 2460578, approved 2024, started, no sign-off needed.
  • Zoned R2 (existing residential); protected building; heritage-listed; no vacant land tax.
  • Nothing nearby looks set to change.
  • 1 application open for comments nearby; nearest closes 20 Nov 2026.
  • 1 application refused within 100 m since 2025; latest for work already done (2026).
  • James Street (bus 163, 173) 405 m away: 5 an hour at morning peak; 21 from all stops within 500 m. Planned: DART+ Coastal North 978 m away, railway order approved (An Coimisiún Pleanála; applied July 2024).
  • Here (2022 census): 67% rent (council 28%); 32% of homes empty (council 8%); most built before 1919; 33% drive to work (council 59%); population up 6% since 2016.
  • Around here the council decides in a median 51 days (about 7 weeks); 38% are asked for more information.
What the terms mean 9 terms
  • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
  • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
  • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
  • Approved (Grant of permission): The council said yes, usually with conditions.
  • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
  • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
  • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
  • Permission for work already done (Retention permission): An application to keep something that was built without permission.
  • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 30
SourcePublisherLicenceFetched
EPA strategic noise maps—CC BY 4.0—
Fingal County Council—CC BY 4.0—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
National Transport Authority—CC BY 4.0—
services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
www2.courts.ie—© the publisher31 Oct 2026
cso.ie—CC BY 4.0—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
lda.ieLand Development AgencyCC BY 4.011 Sept 2026
meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
services-eu1.arcgis.comLocal authorities (Record of Protected Structures)No licence stated · flag only—
services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
gov.ieDepartment of EducationCC BY 4.027 Oct 2026
gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
Measured
counted from a public register
Calculated
a rate or median we worked out from those counts
Our classification
we sorted it by reading each description
Estimate
inferred from another source (census, map data)
Rule summary
the law, simplified: check before relying on it
How we work this out
Generated 31 Oct 2026, 23:29 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.