PlanningRegister.ie
Planning report · Louth County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 00:45

George's Street

53.71733, -6.35660

Homes here mostly date from 1919–1945. Home extensions nearby almost always get approved (96%). 57 homes approved 73 m away haven't started.

See on the mapWatch this area

Not held yet for Louth County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 48 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of DroghedaBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2021: 22 files on Drogheda2022: 21 files on Drogheda2023: 22 files on Drogheda2024: 29 files on Drogheda2025: 23 files on Drogheda2026: 15 files on Drogheda132 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
C1.1
Zoning · Retail warehousing
Yes
Protected or listed · inside the zone around a recorded monument (LH024-041120-)
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningC1.1 · Retail warehousing
What it says

Town or Village Centre: To support the development, improvement and expansion of town or village centre activities.

Zoned for bulky-goods retail warehousing — large sheds, large car parks.

louth county development plan · 11 Nov 2021 – 1 Jan 2027

Protected building8 within 100 m on the council's record (not republished); on the council's record (not republished)
Heritage inventory8 within 100 m Saint Peter's National School; store/warehouse
Monument zoneOn this site Religious house - Fratres Cruciferi, Moneymore; Religious house - Augustinian friars, Moneymore

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings136Boyne View; house
Radon grid squares1
Monuments31Historic town; Religious house - Dominican friars
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, SMR zones of notification, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), EPA radon map, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
Records of Protected StructuresNo licence stated · shown as a yes/no only—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92–100% by type. A new house in a garden is harder: 83% approved, and 1 in 2 are asked for more information.

Single-storey rear32 decided · more info asked 16%
100% · council 98%
Two-storey rear16 decided · more info asked 25%
100% · council 93%
Attic or dormer12 decided · more info asked 25%
92% · council 92%
First-floor14 decided · more info asked 21%
100% · council 95%
New house in a garden or site18 decided · more info asked 50%
83% · council 58%
Approved nearbyLouth overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 92 nearby, 1,268 council-wide

Figure 3

Drogheda, file by file since 2021

27 of 28 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

132 planning files on Drogheda since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 4 · 2021 · first-floor · approved · 211460No. 87 · 2021 · two-storey rear · approved · 2115No. 17 · 2021 · single-storey rear · approved · 21376No. 1 · 2021 · first-floor · approved · 21727No. 5 · 2021 · rear · approved · 21960No. 24 · 2022 · single-storey rear · approved · 22146No. 68 · 2022 · porch / front · approved · 2237No. 18 · 2022 · two-storey rear · approved · 22372No. 6 · 2022 · first-floor · approved · 22689No. 93 · 2022 · single-storey rear · approved · 2279No. 31 · 2022 · single-storey rear · approved · 22839No. 1 · 2022 · single-storey rear · approved · 22971No. 39 · 2024 · rear · approved · 2460116No number · 2024 · other extension · approved · 2460385No. 50 · 2024 · other extension · approved · 2460409No. 115 · 2024 · first-floor · approved · 2460535No. 14 · 2024 · single-storey rear · approved · 2460671No. 73 · 2024 · two-storey rear · approved · 2487No. 30A · 2025 · two-storey rear · approved · 25110No number · 2025 · other extension · refused · 2523No. 15 · 2025 · attic conversion / dormer · approved · 2560461No. 61 · 2025 · side · approved · 2560516No. 16 · 2025 · single-storey rear · approved · 2560678No. 11 · 2026 · attic conversion / dormer · approved · 2660No number · 2026 · first-floor · approved · 2660116No number · 2026 · other extension · approved · 2660118No. 24 · 2026 · porch / front · approved · 2660315No. 88 · 2026 · rear · approved · 2660521Porches, roofs, otherNo number · 2021 · other work · approved · 211023No. 75 · 2021 · other work · approved · 211068No. 6 · 2021 · other work · approved · 2111No number · 2021 · other work · approved · 211109No. 6E · 2021 · other work · approved · 21122No. 12 · 2021 · other work · approved · 21140No. 79 · 2021 · other work · refused · 21148No. 43 · 2021 · other work · approved · 211542No. 31 · 2021 · other work · approved · 21396No. 13 · 2021 · other work · approved · 21494No number · 2021 · other work · approved · 21625No. 14 · 2021 · other work · approved · 21801No. 6 · 2021 · other work · approved · 21808No. 115 · 2021 · other work · approved · 21850No. 117 · 2021 · other work · approved · 21853No. 14 · 2021 · other work · refused · 21862No. 8 · 2021 · other work · approved · 21934No. 25 · 2022 · other work · approved · 22115No. 117 · 2022 · other work · approved · 22178No number · 2022 · other work · approved · 22240No. 115 · 2022 · other work · approved · 22246No number · 2022 · other work · approved · 2250No number · 2022 · other work · approved · 22520No. 1 · 2022 · other work · approved · 22559No. 32 · 2022 · other work · approved · 22567No. 47 · 2022 · other work · approved · 2260No. 41 · 2022 · other work · approved · 22652No. 50 · 2022 · other work · approved · 22746No. 14 · 2022 · other work · approved · 22826No. 14 · 2022 · other work · approved · 22831No. 31 · 2023 · other work · approved · 23223No number · 2023 · other work · approved · 23243No. 6 · 2023 · other work · approved · 2328No. 10 · 2023 · other work · approved · 23383No number · 2023 · other work · approved · 2360028No. 1 · 2023 · other work · approved · 2360068No. 115 · 2023 · other work · approved · 2360075No. 117 · 2023 · other work · approved · 2360076No. 50 · 2023 · other work · approved · 2360078No. 79 · 2023 · other work · approved · 2360104No. 1 · 2023 · other work · refused · 2360128No. 6A · 2023 · other work · approved · 2360188No. 7 · 2023 · other work · refused · 2360195No. 2 · 2023 · other work · approved · 2360212No. 87 · 2023 · other work · refused · 2360215No. 6 · 2023 · other work · approved · 2360293No number · 2023 · other work · approved · 2360324No. 104 · 2023 · other work · approved · 2360327No. 71 · 2023 · other work · approved · 2360344No. 1 · 2023 · other work · approved · 2360350No number · 2023 · other work · approved · 2360410No. 104 · 2024 · other work · approved · 24132No. 104 · 2024 · other work · approved · 24133No. 29 · 2024 · other work · approved · 24152No. 1 · 2024 · other work · approved · 24206No number · 2024 · other work · approved · 24214No number · 2024 · other work · approved · 24226No. 7 · 2024 · other work · approved · 2460064No. 7 · 2024 · other work · approved · 2460151No number · 2024 · other work · refused · 2460223No number · 2024 · other work · approved · 2460338No number · 2024 · other work · approved · 2460372No number · 2024 · other work · approved · 2460413No number · 2024 · other work · approved · 2460455No. 39 · 2024 · other work · refused · 2460528No. 63 · 2024 · other work · approved · 2460539No. 52 · 2024 · other work · refused · 2460553No. 5 · 2024 · other work · approved · 2460578No. 115 · 2024 · other work · approved · 2460601No. 117 · 2024 · other work · approved · 2460602No. 39 · 2024 · other work · approved · 2460625No. 50 · 2024 · other work · approved · 2460651No. 95 · 2024 · other work · refused · 2460681No number · 2024 · other work · approved · 2460750No. 23 · 2025 · other work · approved · 2560013No number · 2025 · other work · approved · 2560030No number · 2025 · other work · approved · 2560096No. 32 · 2025 · other work · approved · 2560101No. 9 · 2025 · other work · refused · 2560203No. 8 · 2025 · other work · approved · 2560284No. 6 · 2025 · other work · approved · 2560304No number · 2025 · other work · approved · 2560341No. 6 · 2025 · other work · approved · 2560458No. 4 · 2025 · other work · approved · 2560521No. 2 · 2025 · other work · approved · 2560605No. 1 · 2025 · other work · approved · 2560634No. 17 · 2025 · other work · approved · 2560661No. 7 · 2025 · other work · approved · 2560696No number · 2025 · other work · approved · 2560706No number · 2025 · other work · approved · 2560720No. 84 · 2025 · other work · approved · 2560723No. 105 · 2025 · other work · approved · 2560726No. 20 · 2026 · other work · approved · 2660007No number · 2026 · other work · refused · 2660033No. 8 · 2026 · other work · approved · 2660060No. 11 · 2026 · other work · approved · 2660065No. 39 · 2026 · other work · approved · 2660074No number · 2026 · other work · approved · 2660472No. 76 · 2026 · other work · approved · 2660525No. 30 · 2026 · other work · refused · 2660564No. 50 · 2026 · other work · approved · 2660568No. 38 · 2026 · other work · approved · 2660596New house in a side gardenNo. 1 · 2022 · new house · approved · 225421No. 38 · 2023 · new house · approved · 23938
ApprovedRefusedWithdrawn or invalid

132 files with "Drogheda" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

3 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear20—
Other10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 48 days. 1 in 4 is asked for more information, which adds about 161 days. Building starts about 6 months after permission.

    Comments open: 5 weeks · €20; Council decision: 48 days; If more info asked (1 in 4): 211 days; Appeal window: 4 weeks; Building starts: 172 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 48 days, middle half 44–50 (n=98)48 daysIf more info asked (1 in 4)With further information: median 211 days (n=33)211 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 172 days after permission (n=40)172 days after permissionSigned off70% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated131 decided home extensions, 40 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    3 of 10 appealed refusals became permissions. 2 of 11 appealed approvals were reversed.

    Refusals appealed10 decided
    3 became permissions
    Approvals appealed11 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501863 Pending · 'Bells Court' Scholes Lane , and adjacent lands to the rear of Nos.… · 164 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 23:12
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 4

    What's changing around you?

    Street map around George's Street with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedAppealBuilding startedNo decision yetApproved
    1. 1Bodyright Physiotherapy, 27 Fair Street 2660706No decision yet · 135 m
    2. 247 & 50 North Road, Drogheda 2660568Approved with conditions · 446 m
    3. 330 Windmill Road, Drogheda 2660564Refused · 483 m
    4. 426 28 29 30 & 31 George's Street & Trinity Gardens 21396Approved, no sign building has started · 73 m
    5. 5Gravel Walk 2360028Approved, no sign building has started · 139 m
    6. 6'Bells Court' Scholes Lane, and adjacent lands to the rear of Nos. 19-27 Fair Street and to the rear of Nos. 75-84 West Street 501863Appeal: no decision yet · 164 m
    7. 76 Bolton Street, Drogheda 21/808Building started · 103 m
    8. 8Site to the rear of Corrigan’s Pub 91-93 George’s Street, and rear of 94 and 95 George’s Street and the Boyne Centre at Bolton Street 2660619No decision yet · 14 m
    9. 979-81 Patrick Street, Moneymore 2660603No decision yet · 41 m
    10. 10The Gary Kelly Cancer Support Centre, Georges Street 2560720Approved with conditions · 158 m
    11. 1174-76 West Street, Drogheda 2660525Approved with conditions · 178 m
    12. 12Apartment 1 39 West Street, Drogheda 2660074Approved with conditions · 244 m
    13. 1388 West Street, Drogheda 2660521Approved with conditions · 266 m
    14. 14Dominic House, Dominick Street Drogheda 2560706Approved with conditions · 292 m
    15. 1517 An Creveen Terrace, Drogheda 2660357No decision yet · 337 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 102 permissions since 2016, 27 show a start notice and 9 have a completion certificate.

    116 applications lodged within 500 m. Council: 104 approved, 12 refused. After appeals: 102 approved. Of those: 9 signed off, 2 built with the owner's opt-out, 16 started, 69 with no start notice found, 6 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT104: lodged → approved12: lodged → refused102: approved → approved11: refused → refused2 approved by the council, refused after an appeal1 refused by the council, withdrawn or invalid after an appeal69: approved → no start notice found2: approved → built, owner opted out16: approved → started, not signed off9: approved → signed off6: approved → ran out116 lodged116 lodged104 approved104 approved12 refused12 refused102 approved102 approved13 refused13 refused1 withdrawn1 withdrawn69 no start notice found69 no start notice found2 built, owner opted out2 built, owner opted out16 started, not signed off16 started, not signed off9 signed off9 signed off6 ran out6 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured116 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    3 deadlines within 500 m; the first closes 6 Nov 2026.

    3 deadlines in the next 30 days: 2026-11-06 2660564: REFUSED — Permission will consist of :1. Demolition of existing buildings. 2. Construction of new car park including designated ar; 2026-11-06 2660568: CONDITIONAL — Permission for development which is in the curtilage of a protected structure - Ref. DB-310 (NIAH Registration No.136160; 2026-11-20 2660706: application received — Permission for the following: 1. Single storey extension to rear of existing building comprising of pilates studio, satoday6 Nov11 Nov16 Nov21 Nov26 Nov1 Dec2660564: REFUSED — Permission will consist of :1. Demolition of existing buildings. 2. Construction of new car park including designated ar · 483 m away · 2026-11-062660568: CONDITIONAL — Permission for development which is in the curtilage of a protected structure - Ref. DB-310 (NIAH Registration No.136160 · 446 m away · 2026-11-062660706: application received — Permission for the following: 1. Single storey extension to rear of existing building comprising of pilates studio, sa · 135 m away · 2026-11-20
    Comments closeTime to appeal ends
    • Time to appeal ends 6 Nov 20265 days left
      32660564 · REFUSED — Permission will consist of :1. Demolition of existing buildings. 2. Construction of new car park including…
      €220 to An Coimisiún Pleanála (€110 observer) · 483 m away
    • Time to appeal ends 6 Nov 20265 days left
      22660568 · CONDITIONAL — Permission for development which is in the curtilage of a protected structure - Ref. DB-310 (NIAH…
      €220 to An Coimisiún Pleanála (€110 observer) · 446 m away
    • Comments close 20 Nov 202619 days left
      12660706 · application received — Permission for the following: 1. Single storey extension to rear of existing building comprising…
      €20 to the council · 135 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    57 homes 73 m away were approved Dec 2021 with no start notice yet; the permission runs to May 2028.

    26 28 29 30 & 31 George's… · 57 homes: 57 homes approved Dec 2021, not started; Gravel Walk · 10 homes: 10 homes approved Dec 2023, not started202120222023202420252026202720282029203026 28 29 30 & 31 George's… · 57 homes73 m · 2139657 homes approved Dec 2021, not started57 homes approved Dec 2021, not startedGravel Walk · 10 homes139 m · 236002810 homes approved Dec 2023, not started10 homes approved Dec 2023, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 2 within 500 m

    Approved, not started 2

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 18 and 26 a year; busiest 2024. 90% of decisions were approvals.

    2021: 20, 2022: 20, 2023: 18, 2024: 26, 2025: 21, 2026: 1101020302021: 18 approved2021: 2 refused20’21*2022: 19 approved2022: 1 refused20’222023: 16 approved2023: 2 refused18’232024: 23 approved2024: 3 refused26’242025: 19 approved2025: 2 refused21’252026: 9 approved2026: 2 refused11’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 28 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 7 in the last 12 months
    1 signed off as finished5 not signed off1 no sign-off needed
    • 39 West Street, Drogheda, Louth, A92 XRX9 · 27 Aug 2026 · 1 homes · short notice no sign-off needed · 2660074 · 258 m
    • 76 Bolton Street, Drogheda, Louth, A92 AW97 · 22 Jun 2026 · 2 homes · start notice not signed off · 21/808 · 103 m
    • 15 Park View, Drogheda, Louth, A92 HPC6 · 3 Apr 2026 · 7-day notice not signed off · 24214 / 24226 · 255 m
    • 80 West Street, Drogheda, Louth, A92 XH95 · 28 Mar 2026 · 5 homes · 7-day notice not signed off · 219 m
    • Dominic Street, Drogheda, Louth, A92 R968 · 27 Feb 2026 · start notice not signed off · 2560706 · 300 m
    • 6 Stockwell Lane, Drogheda, Louth, A92 RD32 · 4 Feb 2026 · 1 homes · 7-day notice not signed off · 2560458 · 452 m
    • Unit 8, Boyne Centre, Bolton Street, Drogheda, Louth, A92 YN40 · 10 Nov 2025 · start notice signed off · 2560284 · 105 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Homes coming 67 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Just Kids Creche & Montessori · Crèche2 Mar 2026 · report · Tusla Early Years Inspectorate292 m
    Just Kids Pre-School and Afterschool · Crèche8 Dec 2025 · report · Tusla Early Years Inspectorate292 m
    Clever Clogs · Crèche7 Aug 2025 · report · Tusla Early Years Inspectorate465 m
    Peter Pan Crèche & Montessori · Crèche11 Apr 2024 · report · Tusla Early Years Inspectorate483 m
    The Grove Early Years Education Centre, Lifestyle Development Group CLG · Crèche18 Feb 2026 · report · Tusla Early Years Inspectorateapprox. 548 m
    Olive Tree Daycare · Crèche18 Jul 2024 · report · Tusla Early Years Inspectorate773 m
    Little Steps Creche & Pre-School · Crèche25 Sept 2025 · report · Tusla Early Years Inspectorate826 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Louth County Council.
    Homes approved
    Here182
    Council middle0
    Homes started
    Here106
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    78% of homes built before 1971 (council 28%). 54% owner-occupied (council 67%).

    Homes built before 1971
    78% · council 28%
    Homes built since 2001
    0% · council 33%
    Owner-occupied
    54% · council 67%
    Rented
    20% · council 28%
    Children under 15
    18% · council 21%
    Aged 65 and over
    20% · council 14%
    Households with 2+ cars
    11% · council 38%
    Work mainly from home
    11% · council 10%
    This small area (173 people)Louth

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 147014008

    Bus
    94 m
    George's Street · 100, 168, 182 · busiest stop within 500 m: 13 an hour at peak
    Nearest school
    85 m
    S N Naomh Peadar, 92 pupils
    Schools, stops and the council

    Schools

    • S N Naomh Peadar · primary · 92 pupils · 85 m
    • Scoil na mBraithre Sn · primary · 359 pupils · 452 m
    • S N Aonghusa · primary · 147 pupils · 505 m
    • St Brigid's and St Patrick's National School · primary · 575 pupils · 514 m
    • S N Ard Mhuire C · primary · 315 pupils · 718 m
    • St Itas Special School · primary · 207 pupils · 776 m
    • ABACAS School · primary · 31 pupils · 862 m

    Stops 33

    • George's Street · 100, 168, 182, 188, 190, 901 · 13/hour at peak · 94 m
    • George's Street · 100, 168, 173, 182, 188, 190 · 6/hour at peak · 97 m
    • Windml Rd · D4, D5 · 4/hour at peak · 297 m
    • Windml Rd · 173 · 0/hour at peak · 303 m
    • Dominick Street · 173 · 1/hour at peak · 328 m
    • Windml Rd · D4, D5 · 4/hour at peak · 340 m
    • West Street · 173 · 1/hour at peak · 367 m
    • Rathmullan Road · 173 · 0/hour at peak · 445 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • S N Naomh Peadar · 85 m0% pupils (92)
    • Scoil na mBraithre Sn · 452 m+4.1% pupils (359)
    • S N Aonghusa · 505 m-9.3% pupils (147)
    • St Brigid's and St Patrick's National School · 514 m+0.3% pupils (575) · temporary classrooms 2024, approved with conditions
    • S N Ard Mhuire C · 718 m+0.6% pupils (315) · 24 classrooms 2026, no decision yet
    • St Itas Special School · 776 m+6.7% pupils (207)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    2. Zoned C1.1 (retail warehousing), not for homes: could you extend?
      Ask for: A solicitor's or planner's view.
      Solicitor · planner
    3. 57 homes approved 73 m away (26 28 29 30 & 31 George's…), not started: what is planned?
      Ask for: The planning file for 21396.
      Council
    4. 10 homes approved 139 m away (Gravel Walk), not started: what is planned?
      Ask for: The planning file for 2360028.
      Council
    5. Application 135 m away open for comments until 20 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Moneymore
    Electoral division
    Fair Gate
    Electoral area
    Drogheda Urban
    Council
    Louth County Council
    Everything we found, as a list 8 lines
    • Zoned C1.1 (retail warehousing); monument zone; no vacant land tax.
    • 2 sites nearby could change: 2 approved schemes.
    • 1 application open for comments nearby; nearest closes 20 Nov 2026.
    • 67 homes approved nearby, not started; largest 57 at 26 28 29 30 & 31 George's Street &….
    • George's Street (bus 100, 168) 94 m away: 13 an hour at morning peak; 29 from all stops within 500 m.
    • Here (2022 census): 54% owner-occupied (council 67%); 15% of homes empty (council 8%); most built 1919–1945; 28% drive to work (council 59%); population up 6% since 2016.
    • 3 home extensions within 250 m since 2026. Most were single-storey rear extensions.
    • Around here the council decides in a median 51 days (about 7 weeks); 38% are asked for more information.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services-eu1.arcgis.comLocal authorities (Record of Protected Structures)No licence stated · flag only—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 00:45 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.