PlanningRegister.ie
Planning report · Louth County Council · 2000 m around the house · the last 12 months · 27 Oct 2026, 12:31

Pearse Park

53.72073, -6.34678

Homes here mostly date from 1919–1945. 1 planning file on this house, the latest from 2022. Home extensions nearby almost always get approved (97%). 192 homes approved 1.5 km away haven't started.

See on the mapWatch this area

Not held yet for Louth County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 48 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed. 1 planning file on this house, the latest from 2022.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945. 1 planning file on this house.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of DroghedaBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2022: 22122 · work already done, approved2021: 17 files on Drogheda2022: 19 files on Drogheda2023: 15 files on Drogheda2024: 18 files on Drogheda2025: 20 files on Drogheda2026: 11 files on Drogheda100 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2022
    22122 · work already done · approved 2022 · work already done
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect and enhance the amenity and character of existing residential communities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

louth county development plan · 11 Nov 2021 – 1 Jan 2027

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Superwarm Homes (Limerick) Limited (814 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings324Boyne View; Mary's Villa
Radon grid squares1
Monuments118Souterrain; Burial ground
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 113 on the draft 2027 map; 112 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, EPA radon map, Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 93–100% by type. A new house in a garden is harder: 77% approved, and 1 in 2 is asked for more information.

Single-storey rear29 decided · more info asked 14%
100% · council 98%
Two-storey rear13 decided · more info asked 38%
100% · council 93%
Single-storey side11 decided · more info asked 36%
100% · council 100%
Attic or dormer15 decided · more info asked 27%
93% · council 92%
First-floor12 decided · more info asked 25%
100% · council 95%
New house in a garden or site22 decided · more info asked 41%
77% · council 58%
Approved nearbyLouth overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 102 nearby, 1,339 council-wide

Figure 3

Drogheda, file by file since 2021

29 of 31 decided extensions on the road were approved. New houses in side gardens or on sites: 5 of 5.

100 planning files on Drogheda since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 3 · 2021 · single-storey rear · approved · 211100No. 27 · 2021 · two-storey rear · approved · 211484No. 198 · 2021 · two-storey rear · approved · 21289No. 17 · 2021 · single-storey rear · approved · 21376No. 1 · 2021 · single-storey side · approved · 21445No. 1 · 2021 · first-floor · approved · 21727No number · 2021 · side · approved · 21863No. 5 · 2021 · rear · approved · 21960No. 74 · 2022 · porch / front · approved · 22199No. 11 · 2022 · attic conversion / dormer · refused · 22280No. 67 · 2022 · side · approved · 22292No. 18 · 2022 · two-storey rear · approved · 22372No. 106 · 2022 · two-storey rear · approved · 22468No. 32 · 2022 · attic conversion / dormer · approved · 22732No. 93 · 2022 · single-storey rear · approved · 2279No. 138 · 2022 · first-floor · approved · 22820No. 31 · 2022 · single-storey rear · approved · 22839No. 1 · 2022 · single-storey rear · approved · 22971No. 18 · 2023 · single-storey rear · approved · 2360339No number · 2024 · other extension · approved · 2460385No. 8 · 2024 · single-storey side · approved · 2460404No. 48 · 2024 · porch / front · approved · 2460464No number · 2024 · single-storey side · approved · 2460490No. 14 · 2024 · single-storey rear · approved · 2460671No. 9 · 2025 · single-storey rear · approved · 2560442No. 65 · 2025 · other extension · refused · 2560698No number · 2025 · other extension · approved · 2560729No. 118 · 2026 · single-storey side · approved · 2660083No. 104 · 2026 · two-storey side · approved · 2660115No number · 2026 · first-floor · approved · 2660116No number · 2026 · other extension · approved · 2660118Porches, roofs, otherNo number · 2021 · other work · approved · 21180No number · 2021 · other work · approved · 21625No. 14 · 2021 · other work · approved · 21801No. 80 · 2021 · other work · refused · 21881No number · 2021 · other work · approved · 21950No. 59A · 2022 · other work · approved · 22122No. 15 · 2022 · other work · approved · 2221No. 1 · 2022 · other work · approved · 22233No number · 2022 · other work · approved · 22240No. 10 · 2022 · other work · approved · 22481No number · 2022 · other work · approved · 2250No number · 2022 · other work · approved · 22520No. 1 · 2022 · other work · approved · 22559No. 68 · 2022 · other work · approved · 22950No number · 2023 · other work · approved · 23243No. 54 · 2023 · other work · approved · 2341No. 13 · 2023 · other work · approved · 2360044No. 1 · 2023 · other work · approved · 2360068No. 1 · 2023 · other work · refused · 2360128No number · 2023 · other work · refused · 2360132No. 22 · 2023 · other work · approved · 2360260No. 3 · 2023 · other work · approved · 2360285No number · 2023 · other work · approved · 2360324No. 1 · 2023 · other work · approved · 2360350No number · 2023 · other work · approved · 2360384No. 2 · 2023 · other work · approved · 2360510No. 3 · 2023 · other work · approved · 2360534No number · 2023 · other work · approved · 2390No number · 2024 · other work · approved · 24214No number · 2024 · other work · approved · 24226No number · 2024 · other work · approved · 2460138No number · 2024 · other work · refused · 2460234No number · 2024 · other work · approved · 2460338No number · 2024 · other work · approved · 2460352No number · 2024 · other work · approved · 2460372No number · 2024 · other work · approved · 2460413No. 23 · 2024 · other work · approved · 2460468No. 13 · 2024 · other work · approved · 2460469No. 5 · 2024 · other work · approved · 2460578No number · 2024 · other work · approved · 2460594No. 23 · 2025 · other work · approved · 2560013No. 9 · 2025 · other work · refused · 2560023No number · 2025 · other work · approved · 2560030No. 32 · 2025 · other work · approved · 2560101No. 9 · 2025 · other work · refused · 2560203No number · 2025 · other work · approved · 2560341No number · 2025 · other work · approved · 2560353No number · 2025 · other work · approved · 2560355No number · 2025 · other work · approved · 2560444No. 12 · 2025 · other work · refused · 2560469No. 62A · 2025 · other work · approved · 2560474No. 2 · 2025 · other work · approved · 2560558No. 27 · 2025 · other work · approved · 2560635No number · 2025 · other work · approved · 2560770No. 9 · 2025 · other work · approved · 2575No. 128 · 2025 · other work · refused · 259No. 128 · 2025 · other work · approved · 2598No. 20 · 2026 · other work · approved · 2660007No number · 2026 · other work · refused · 2660033No. 13 · 2026 · other work · approved · 2660073No. 2 · 2026 · other work · approved · 2660165No. 61 · 2026 · other work · approved · 2660281No. 12 · 2026 · other work · refused · 2660331No number · 2026 · other work · approved · 2660472New house in a side gardenNo. 67 · 2021 · new house · approved · 21113467No. 80 · 2021 · new house · approved · 21139No. 1 · 2021 · new house · approved · 21693No. 16 · 2021 · new house · approved · 21982No number · 2024 · new house · approved · 24109
ApprovedRefusedWithdrawn or invalid

100 files with "Drogheda" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Single-storey side11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 27 Oct 2026, 01:33
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 48 days. 1 in 4 is asked for more information, which adds about 161 days. Building starts about 6 months after permission.

    Comments open: 5 weeks · €20; Council decision: 48 days; If more info asked (1 in 4): 211 days; Appeal window: 4 weeks; Building starts: 172 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 48 days, middle half 44–50 (n=93)48 daysIf more info asked (1 in 4)With further information: median 211 days (n=30)211 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 172 days after permission (n=36)172 days after permissionSigned off64% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated123 decided home extensions, 36 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    2 of 7 appealed refusals became permissions. 2 of 12 appealed approvals were reversed.

    Refusals appealed7 decided
    2 became permissions
    Approvals appealed12 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 9 in the last 12 months
    • 501796 Invalid · 'G. Morgan & Sons Limited' Linenfields , Ballymakenny Road Drogheda ,… · 1.7 km
    • 502087 Pending · Marsh Road (to the east of Scotch Hall Shopping Centre), Drogheda,… · 763 m
    • 502071 Invalid · Greenbatter and Newtownstalaban , Drogheda , Co. Louth · 958 m
    • 501863 Pending · 'Bells Court' Scholes Lane , and adjacent lands to the rear of Nos.… · 732 m
    • 500973 Granted · 1 Ferrard Park Road , Twenties , Drogheda · 1.3 km
    • 500970 Refused · Donore Road, Drogheda, Co. Louth · 1.6 km
    • 501565 Open · 3 Singleton Cottages , Drogheda , Co. Louth, A92 Y67F · 1.3 km
    • 500838 Granted · 08 The Anchorage Rathmullen Road , Drogheda , County Louth · 1.6 km
    • 324143 Pending · 10 Shop Street, Drogheda, Co. Louth, A92 AXD5. · 744 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 27 Oct 2026, 01:33
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher26 Oct 2026, 23:11open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Question 4

    What's changing around you?

    Street map around Pearse Park with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not started
    1. 1Bodyright Physiotherapy, 27 Fair Street 2660706No decision yet · 734 m
    2. 2103 Shrewsbury Manor, Greenhills Newtownstalaban 2660658No decision yet · 1.0 km
    3. 311 Highfield, Drogheda 2660694No decision yet · 1.1 km
    4. 44 Cromwell's Lane, Drogheda 26121No decision yet · 1.2 km
    5. 5Marymount National School, Ballsgrove 26115No decision yet · 1.3 km
    6. 62 Ferrard Park Road, Twenties 2660661No decision yet · 1.4 km
    7. 7Lands located north of Beaulieu Village and east of Aston Village, North Commons 2660677No decision yet · 1.7 km
    8. 855 Bryanstown Village, Dublin Road 2661263No decision yet · 1.8 km
    9. 9118 Crushrod Ave, Drogheda 2660083Approved with conditions · 103 m
    10. 10Our Lady of Lourdes Hospital, Windmill Road 2660116Approved with conditions · 418 m
    11. 1130 Windmill Road, Drogheda 2660564Refused · 643 m
    12. 1247 & 50 North Road, Drogheda 2660568Approved with conditions · 740 m
    13. 13The Pharmacy, 3 Cross Lane Moneymore 2660599Approved with conditions · 778 m
    14. 14Gravel Walk 2360028Approved, not started · 726 m
    15. 1526 28 29 30 & 31 George's Street & Trinity Gardens 21396Approved, no sign building has started · 750 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 60 permissions since 2016, 19 show a start notice and 3 have a completion certificate.

    69 applications lodged within 500 m. Council: 60 approved, 9 refused. After appeals: 60 approved. Of those: 3 signed off, 7 built with the owner's opt-out, 9 started, 35 with no start notice found, 6 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT60: lodged → approved9: lodged → refused60: approved → approved9: refused → refused35: approved → no start notice found7: approved → built, owner opted out9: approved → started, not signed off3: approved → signed off6: approved → ran out69 lodged69 lodged60 approved60 approved9 refused9 refused60 approved60 approved9 refused9 refused35 no start notice found35 no start notice found7 built, owner opted out7 built, owner opted out9 started, not signed off9 started, not signed off3 signed off3 signed off6 ran out6 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured69 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    15 deadlines within 2.0 km; the first closes 29 Oct 2026.

    15 deadlines in the next 30 days: 2026-10-29 2660658: application received — Retention Permission: The development consists of: 1. Retention permission for the subdivision of 103 Shrewsbury Manor ; 2026-10-30 2660661: application received — Permission for: (1) Creation of existing boundary wall enclosing rear garden; (2) Adjustment of existing vehicular entra; 2026-10-30 2660116: CONDITIONAL — Permission for the construction of a first floor extension on top of existing single storey building, together with all ; 2026-11-03 ACP 502071: Invalid - Grounds S.37(6)(b); 2026-11-05 2660677: application received — Permission for (a) the construction of 99 no. dwellings comprising a mix of house types and apartments including: (i) 57; 2026-11-06 2660564: REFUSED — Permission will consist of :1. Demolition of existing buildings. 2. Construction of new car park including designated ar; 2026-11-06 26115: application received — EXTENSION OF DURATION OF 21/760 - Proposed development consisting of a new two storey 24 classroom school including al; 2026-11-06 2660568: CONDITIONAL — Permission for development which is in the curtilage of a protected structure - Ref. DB-310 (NIAH Registration No.136160; 2026-11-11 26121: application received — Retention permission for a porch to the front of house, along with the ancillary site development works; 2026-11-12 2660694: application received — Permission for modifications to the existing house including a side and rear extension and all associated siteworks; 2026-11-13 2660083: CONDITIONAL — Permission for a single storey extension to the side of existing dwelling, front porch at existing dwelling and associat; 2026-11-13 2660599: CONDITIONAL — Permission for alterations to shopfront of existing pharmacy shop, including removal of existing signage entablature, pi; 2026-11-16 2661263: application received — 1. Proposed single-storey extension to the rear of existing dwelling. 2. Proposed porch extension to the front of exist; 2026-11-18 ACP 501796: Dismissed - nature of appeal/any previous permission S.138(1)(b); 2026-11-20 2660706: application received — Permission for the following: 1. Single storey extension to rear of existing building comprising of pilates studio, satoday1 Nov6 Nov11 Nov16 Nov21 Nov26 Nov2660658: application received — Retention Permission: The development consists of: 1. Retention permission for the subdivision of 103 Shrewsbury Manor · 1 km away · 2026-10-292660661: application received — Permission for: (1) Creation of existing boundary wall enclosing rear garden; (2) Adjustment of existing vehicular entra · 1.4 km away · 2026-10-302660116: CONDITIONAL — Permission for the construction of a first floor extension on top of existing single storey building, together with all · 418 m away · 2026-10-30ACP 502071: Invalid - Grounds S.37(6)(b) · 958 m away · 2026-11-032660677: application received — Permission for (a) the construction of 99 no. dwellings comprising a mix of house types and apartments including: (i) 57 · 1.7 km away · 2026-11-052660564: REFUSED — Permission will consist of :1. Demolition of existing buildings. 2. Construction of new car park including designated ar · 643 m away · 2026-11-0626115: application received — EXTENSION OF DURATION OF 21/760 - Proposed development consisting of a new two storey 24 classroom school including al · 1.3 km away · 2026-11-062660568: CONDITIONAL — Permission for development which is in the curtilage of a protected structure - Ref. DB-310 (NIAH Registration No.136160 · 740 m away · 2026-11-0626121: application received — Retention permission for a porch to the front of house, along with the ancillary site development works · 1.2 km away · 2026-11-112660694: application received — Permission for modifications to the existing house including a side and rear extension and all associated siteworks · 1.1 km away · 2026-11-122660083: CONDITIONAL — Permission for a single storey extension to the side of existing dwelling, front porch at existing dwelling and associat · 103 m away · 2026-11-132660599: CONDITIONAL — Permission for alterations to shopfront of existing pharmacy shop, including removal of existing signage entablature, pi · 778 m away · 2026-11-132661263: application received — 1. Proposed single-storey extension to the rear of existing dwelling. 2. Proposed porch extension to the front of exist · 1.8 km away · 2026-11-16ACP 501796: Dismissed - nature of appeal/any previous permission S.138(1)(b) · 1.7 km away · 2026-11-182660706: application received — Permission for the following: 1. Single storey extension to rear of existing building comprising of pilates studio, sa · 734 m away · 2026-11-20
    Comments closeTime to appeal endsHigh Court window ends
    • Comments close 29 Oct 20262 days left
      22660658 · application received — Retention Permission: The development consists of: 1. Retention permission for the subdivision…
      €20 to the council · 1.0 km away
    • Comments close 30 Oct 20263 days left
      62660661 · application received — Permission for: (1) Creation of existing boundary wall enclosing rear garden; (2) Adjustment of…
      €20 to the council · 1.4 km away
    • Time to appeal ends 30 Oct 20263 days left
      102660116 · CONDITIONAL — Permission for the construction of a first floor extension on top of existing single storey building,…
      €220 to An Coimisiún Pleanála (€110 observer) · 418 m away
    • Time to ask the High Court for a review ends 3 Nov 20267 days left
      Invalid - Grounds S.37(6)(b)
      958 m away
    • Comments close 5 Nov 20269 days left
      72660677 · application received — Permission for (a) the construction of 99 no. dwellings comprising a mix of house types and…
      €20 to the council · 1.7 km away
    • Time to appeal ends 6 Nov 202610 days left
      112660564 · REFUSED — Permission will consist of :1. Demolition of existing buildings. 2. Construction of new car park including…
      €220 to An Coimisiún Pleanála (€110 observer) · 643 m away
    • Comments close 6 Nov 202610 days left
      526115 · application received — EXTENSION OF DURATION OF 21/760 - Proposed development consisting of a new two storey 24…
      €20 to the council · 1.3 km away
    • Time to appeal ends 6 Nov 202610 days left
      122660568 · CONDITIONAL — Permission for development which is in the curtilage of a protected structure - Ref. DB-310 (NIAH…
      €220 to An Coimisiún Pleanála (€110 observer) · 740 m away
    • Comments close 11 Nov 202615 days left
      426121 · application received — Retention permission for a porch to the front of house, along with the ancillary site…
      €20 to the council · 1.2 km away
    • Comments close 12 Nov 202616 days left
      32660694 · application received — Permission for modifications to the existing house including a side and rear extension and all…
      €20 to the council · 1.1 km away
    • Time to appeal ends 13 Nov 202617 days left
      92660083 · CONDITIONAL — Permission for a single storey extension to the side of existing dwelling, front porch at existing…
      €220 to An Coimisiún Pleanála (€110 observer) · 103 m away
    • Time to appeal ends 13 Nov 202617 days left
      132660599 · CONDITIONAL — Permission for alterations to shopfront of existing pharmacy shop, including removal of existing signage…
      €220 to An Coimisiún Pleanála (€110 observer) · 778 m away
    • Comments close 16 Nov 202620 days left
      82661263 · application received — 1. Proposed single-storey extension to the rear of existing dwelling. 2. Proposed porch…
      €20 to the council · 1.8 km away
    • Time to ask the High Court for a review ends 18 Nov 202622 days left
      Dismissed - nature of appeal/any previous permission S.138(1)(b)
      1.7 km away
    • Comments close 20 Nov 202624 days left
      12660706 · application received — Permission for the following: 1. Single storey extension to rear of existing building comprising…
      €20 to the council · 734 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    192 homes 1.5 km away were approved Dec 2023 with no start notice yet; the permission runs to Dec 2028. 2 building sites nearby stopped before sign-off.

    Boyne Road · 192 homes: 192 homes approved Dec 2023, not started; Ferrard Park, Twenties… · 104 homes: 104 homes, started Nov 2022, never signed off; Yellowbatter · 99 homes: 99 homes approved Jul 2026, not started; Twenties Lane · 99 homes: 99 homes approved Jun 2023, not started20222023202420252026202720282029203020312032Boyne Road · 192 homes1.5 km · 2360053192 homes approved Dec 2023, not started192 homes approved Dec 2023, not startedFerrard Park, Twenties… · 104 homes1.5 km · 18/667104 homes, started Nov 2022, never signed off104 homes, started Nov 2022, never signed offYellowbatter · 99 homes1.6 km · 256079799 homes approved Jul 2026, not started99 homes approved Jul 2026, not startedTwenties Lane · 99 homes1.8 km · 2271399 homes approved Jun 2023, not started99 homes approved Jun 2023, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 36 within 2.0 km

    Building site that stopped 2

    • Saint Mary's Villas, Drogheda · 55 homes, started Jun 2023, never signed off · 1.2 km
    • Ferrard Park, Twenties Lane · 104 homes, started Nov 2022, never signed off · 1.5 km

    Approved, not started, approval running out 1

    Approved, not started 23

    Empty land zoned for homes 10

    • 0.3 ha zoned for homes · no homes built on it yet · 713 m
    • 0.9 ha zoned for homes · no homes built on it yet · 795 m
    • 3.0 ha zoned for homes · no homes built on it yet · 795 m
    • 0.6 ha zoned for homes · no homes built on it yet · 839 m
    • 1.2 ha zoned for homes · no homes built on it yet · 851 m
    • 0.5 ha zoned for homes · no homes built on it yet · 867 m
    • 2.8 ha zoned for homes · no homes built on it yet · 892 m
    • 0.9 ha zoned for homes · no homes built on it yet · 951 m
    • 0.2 ha zoned for homes · no homes built on it yet · 992 m
    • 2.2 ha zoned for homes · no homes built on it yet · 1.0 km

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 10 and 13 a year; busiest 2024. 87% of decisions were approvals.

    2021: 13, 2022: 11, 2023: 10, 2024: 13, 2025: 13, 2026: 9051015202021: 12 approved2021: 1 refused13’21*2022: 11 approved11’222023: 9 approved2023: 1 refused10’232024: 12 approved2024: 1 refused13’242025: 9 approved2025: 4 refused13’252026: 7 approved2026: 2 refused9’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 134 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    Building work nearby 53 in the last 12 months
    7 signed off as finished32 not signed off14 no sign-off needed
    • 72 Bryanstown, Drogheda, Louth · 28 Oct 2026 · 1 homes · start notice not signed off · 2525 · 1.7 km
    • Rathmullan Road, Drogheda, Louth · 21 Oct 2026 · 7-day notice not signed off · 26/60399 · 2.0 km
    • 94 Maple Drive, Drogheda, Louth, A92 EH6N · 16 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 2560091 · 764 m
    • Rathmullan Park, Drogheda, Louth · 12 Oct 2026 · 4 homes · start notice not signed off · 2474 · 1.7 km
    • Marsh Road, Drogheda, Louth, A92 HF5F · 5 Oct 2026 · 7-day notice not signed off · 775 m
    • Block 3, PH#9 Avourwen, Drogheda, Meath · 26 Sept 2026 · 30 homes · 7-day notice not signed off · 2460832 · 1.8 km
    • Block 2, PH#9 Avourwen, Duleek rd, Drogheda, Meath · 26 Sept 2026 · 30 homes · 7-day notice not signed off · 2460832 · 1.9 km
    • Block 1, PH#9 Avourwen, Duleek rd, Drogheda, Meath · 16 Sept 2026 · 30 homes · 7-day notice not signed off · 2460832 · 2.0 km
    • 2 Cement Road, Drogheda, Louth · 14 Sept 2026 · start notice not signed off · 2360225 · 1.4 km
    • 87 Ballymakenny Park, Drogheda, Louth · 4 Sept 2026 · 7-day notice not signed off · 2560798 · 1.9 km
    • 44 Ballymakenny Avenue, Drogheda, Louth · 3 Sept 2026 · 7-day notice not signed off · 2560798 · 1.9 km
    • 7 Donore Avenue, Drogheda, Louth · 31 Aug 2026 · start notice not signed off · 21-760 · 1.4 km
    • 39 West Street, Drogheda, Louth, A92 XRX9 · 27 Aug 2026 · 1 homes · short notice no sign-off needed · 2660074 · 827 m
    • 104 Newfield Estate, Drogheda, Louth, A92 YR8D · 17 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2660115 · 601 m
    • Marsh Road, Drogheda, Louth, A92 N627 · 10 Aug 2026 · 7-day notice signed off · 775 m
    • 3 Legavoureen Park, Drogheda, Louth, A92 E51W · 10 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2560433 · 1.2 km
    • 46 Ballymakenny Avenue, Drogheda, Louth · 7 Aug 2026 · 79 homes · start notice not signed off · 2560796 · 1.9 km
    • 44 Ballymakenny Avenue, Drogheda, Louth · 7 Aug 2026 · 24 homes · start notice not signed off · 2560798 · 1.9 km
    • 49 Ferrard Park Road, Drogheda, Louth · 31 Jul 2026 · 7-day notice not signed off · 2460282 · 1.6 km
    • Windmill Road, Moneymore,, Drogheda, Louth, A92 VW28 · 27 Jul 2026 · 7-day notice not signed off · 2560729 · 584 m
    • 20 Saint Laurence Street, Drogheda, Louth, A92 FP2N · 10 Jul 2026 · 7-day notice signed off · 556 m
    • Mayoralty Street, Drogheda, Louth · 9 Jul 2026 · 7-day notice signed off · 19/490 · 649 m
    • 9 Mount Saint Oliver, Drogheda, Louth, A92 K3VN · 3 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2660152 · 1.2 km
    • Marsh Road, Drogheda, Louth · 24 Jun 2026 · 7-day notice not signed off · 2260005 · 1.2 km
    • 6 Bolton Street, Drogheda, Louth, A92 AW97 · 22 Jun 2026 · 2 homes · start notice not signed off · 21/808 · 707 m
    • Unit 2 Boyne Business Park, Drogheda, Louth, A92 HE00 · 19 Jun 2026 · start notice not signed off · 2460683 · 1.6 km
    • Windmill Road, Drogheda, Louth, A92 VW28 · 18 Jun 2026 · 7-day notice not signed off · 2460385 · 580 m
    • Marsh Road, Drogheda, Louth · 16 Jun 2026 · 7-day notice not signed off · 1.6 km
    • Marsh Road, Drogheda, Louth, A92 W271 · 15 Jun 2026 · 7-day notice signed off · 775 m
    • Scarlet Street, Drogheda, Louth, A92 DD73 · 8 Jun 2026 · start notice not signed off · 2460490 · 236 m
    • North Road, Drogheda, Louth · 18 May 2026 · 7-day notice not signed off · 2560096 · 943 m
    • Upper Mell, Drogheda, Louth, A92 N77E · 17 May 2026 · 1 homes · start notice, opted out no sign-off needed · 2560434 · 1.8 km
    • 15 Copper Close, Drogheda, Louth, A92 H97E · 1 May 2026 · short notice no sign-off needed · 2560576 · 1.9 km
    • 168 Marian Park, Drogheda, Louth, A92 R2NP · 22 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 2560822 · 1.6 km
    • 62 Pearse Park, Drogheda, Louth, A92Y016 · 17 Apr 2026 · 1 homes · 7-day notice not signed off · 2560474 · 43 m
    • 13 Ballymakenny Road, Drogheda, Louth · 16 Apr 2026 · 33 homes · start notice not signed off · 2460722 · 1.4 km
    • 55 Ballsgrove, Drogheda, Louth, A92 YEF8 · 14 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 2560611 · 1.7 km
    • Scoth Hall Shopping Centre Marsh Road, Drogheda, Louth, A92 FW99 · 9 Apr 2026 · 7-day notice signed off · 775 m
    • 15 Park View, Drogheda, Louth, A92 HPC6 · 3 Apr 2026 · 7-day notice not signed off · 24214 / 24226 · 528 m
    • Upper Mell Raod, A92N77E, Drogheda, Louth · 1 Apr 2026 · short notice no sign-off needed · 2560434 · 1.8 km
    • 80 West Street, Drogheda, Louth, A92 XH95 · 28 Mar 2026 · 5 homes · 7-day notice not signed off · 789 m
    • Windmill Road, Moneymore,, Drogheda, Louth, A92 VW28 · 26 Mar 2026 · 7-day notice not signed off · 503 m
    • Bryanstown Cross Route, Drogheda, Meath, 000000 · 26 Mar 2026 · 98 homes · start notice not signed off · 22/1365 · 1.7 km
    • Dominic Street, Drogheda, Louth, A92 R968 · 27 Feb 2026 · start notice not signed off · 2560706 · 869 m
    • Roslyn, 4 Greenhills Villas, Drogheda, Louth · 6 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · 2560438 · 796 m
    • 6 Stockwell Lane, Drogheda, Louth, A92 RD32 · 4 Feb 2026 · 1 homes · 7-day notice not signed off · 2560458 · 898 m
    • Usher"s Mill Avenue, Drogheda, Louth · 30 Jan 2026 · 95 homes · start notice not signed off · 2460793 · 1.7 km
    • Coolfore, Drogheda, Louth, A92E9DK · 28 Dec 2025 · start notice, opted out no sign-off needed · 20194 · 744 m
    • Drogheda MacBride railway station, Drogheda, Louth, A92 W422 · 18 Dec 2025 · start notice not signed off · 1.2 km
    • 148 Forest Park, Drogheda, Louth · 14 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · 2535 · 1.2 km
    • 16 Saint Mary's Villas, Drogheda, Louth, A92 ENX0 · 14 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · 2460487 · 1.2 km
    • 20 Saint Laurence Street, Drogheda, Louth, A92 FP2N · 12 Nov 2025 · start notice signed off · 557 m
    • Unit 8, Boyne Centre, Bolton Street, Drogheda, Louth, A92 YN40 · 10 Nov 2025 · start notice signed off · 2560284 · 646 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    Homes coming 1,205 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Who applies most nearby

    Crèches and schools inspected

    NameLatest inspectionDistance
    Little Steps Creche & Pre-School · Crèche25 Sept 2025 · report · Tusla Early Years Inspectorate363 m
    Clever Clogs · Crèche7 Aug 2025 · report · Tusla Early Years Inspectorate442 m
    Peter Pan Crèche & Montessori · Crèche11 Apr 2024 · report · Tusla Early Years Inspectorate514 m
    Just Kids Creche & Montessori · Crèche2 Mar 2026 · report · Tusla Early Years Inspectorate614 m
    Just Kids Pre-School and Afterschool · Crèche8 Dec 2025 · report · Tusla Early Years Inspectorate614 m
    Olive Tree Daycare · Crèche18 Jul 2024 · report · Tusla Early Years Inspectorate864 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 25 Oct 2026, 23:01
    SourceLicenceFetchedLink
    Applicant organisations (from the CRO)Derived by Planning Register25 Oct 2026, 23:01—
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Louth County Council.
    Homes approved
    Here182
    Council middle0
    Homes started
    Here87
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    94% of homes built before 1971 (council 28%). 64% owner-occupied (council 67%).

    Homes built before 1971
    94% · council 28%
    Homes built since 2001
    1% · council 33%
    Owner-occupied
    64% · council 67%
    Rented
    30% · council 28%
    Children under 15
    18% · council 21%
    Aged 65 and over
    24% · council 14%
    Households with 2+ cars
    14% · council 38%
    Work mainly from home
    1% · council 10%
    This small area (294 people)Louth

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 147014041

    Bus
    119 m
    Crushrod Ave · D5 · busiest stop within 500 m: 2 an hour at peak
    Nearest school
    166 m
    St Itas Special School, 207 pupils
    Homes sold nearby
    487
    in 3 years, 51 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Itas Special School · primary · 207 pupils · 166 m
    • S N Aonghusa · primary · 147 pupils · 324 m
    • Scoil na mBraithre Sn · primary · 359 pupils · 360 m
    • St Brigid's and St Patrick's National School · primary · 575 pupils · 380 m
    • S N Naomh Peadar · primary · 92 pupils · 691 m
    • Presentation Convent · primary · 385 pupils · 1.0 km
    • Sacred Heart Secondary School · postprimary · 717 pupils · 1.1 km
    • St. Joseph's C.B.S. · postprimary · 1128 pupils · 1.1 km

    Stops 84

    • Crushrod Ave · D5 · 2/hour at peak · 119 m
    • Crushrod Ave · 173, D5 · 2/hour at peak · 147 m
    • Hardman's Gdns · 168 · 1/hour at peak · 194 m
    • Hardman's Gdns · 101X, 168, 173 · 1/hour at peak · 208 m
    • Magdalene Tower · 101X, 168, 173 · 1/hour at peak · 308 m
    • Scarlet Street · 168, 173 · 1/hour at peak · 357 m
    • Scarlet Street · 101X, 168 · 1/hour at peak · 364 m
    • Newfoundwell Rd · 173, D5 · 2/hour at peak · 403 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Itas Special School · 166 m+6.7% pupils (207)
    • S N Aonghusa · 324 m-9.3% pupils (147)
    • Scoil na mBraithre Sn · 360 m+4.1% pupils (359)
    • St Brigid's and St Patrick's National School · 380 m+0.3% pupils (575) · temporary classrooms 2024, approved with conditions
    • S N Naomh Peadar · 691 m0% pupils (92)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 27 Oct 2026, 01:57
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Council consultation portalsPublic27 Oct 2026, 00:57open
    Council meetings (ModernGov)Public27 Oct 2026, 01:57open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Work already done (22122): work kept with permission. Done as approved?
      Ask for: The retention grant and an opinion of compliance.
      Seller · solicitor
    2. Application 734 m away open for comments until 20 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Decision 103 m away can be appealed until 13 Nov 2026: appeal?
      Ask for: The decision on the council's website (€220 to appeal).
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Yellowbatter
    Electoral division
    Fair Gate
    Electoral area
    Drogheda Urban
    Council
    Louth County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 22122, approved 2022, work already done.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 36 sites nearby could change: 2 stalled builds, 24 approved schemes, 10 empty zoned plots.
    • 8 applications open for comments nearby; nearest closes 20 Nov 2026.
    • 1,205 homes approved nearby, not started; largest 192 at Boyne Road.
    • Crushrod Ave (bus D5) 119 m away: 2 an hour at morning peak; 16 from all stops within 500 m.
    • Here (2022 census): 64% owner-occupied (council 67%); 11% of homes empty (council 8%); most built 1919–1945; 44% drive to work (council 59%); population up 6% since 2016.
    • 1 home extension within 250 m since 2026.
    What the terms mean 10 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.027 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public27 Oct 2026
    www2.courts.ie—© the publisher26 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public27 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.027 Oct 2026
    organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register25 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence27 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 27 Oct 2026, 12:31 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.