PlanningRegister.ie
Planning report · Meath County Council · 500 m around the house · the last 12 months · 13 Oct 2026, 22:08

Moynalty Road

53.73473, -6.88233

Homes here mostly date from the 2000s. 2 planning files on this house, the latest from 2022. Home extensions nearby almost always get approved (94%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 2 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 2 planning files on this house, the latest from 2022.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Archdeaconry GlebeBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2022: 221063 · work already done, approved2022: 221007 · work already done, withdrawn or invalid2022: 1 file on Archdeaconry Glebe2024: 2 files on Archdeaconry Glebe2025: 1 file on Archdeaconry Glebe4 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2022
    221063 · work already done · approved 2022 · work already done
    approvedstartedsigned off?
  2. 2022
    221007 · work already done · withdrawn
    approved?startedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

A1 - Existing Residential: Existing Residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

meath county development plan 2021 2027 · 3 Nov 2021 – 2 Nov 2027

ZoningR2 · Existing residential
What it says

A1 - Existing Residential: Existing Residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

meath county development plan 2021 2027 as varied · 3 Nov 2021 – 2 Nov 2027

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: ABEC TECHNOLOGIES EUROPE LIMITED (719 m); Complex Tooling & Molding Limited (979 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Monuments2Fulacht fia
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 2 on the draft 2027 map; 2 on the final 2026 map.
Sources: zoning, epa_leap, rzlt, constraints, constraints.smr · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
epa_leapCC-BY-4.012 Oct 2026, 23:31open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 13 Oct 2026, 00:21
SourceLicenceFetchedLink
bcmsCC-BY-4.013 Oct 2026, 00:21open
npadCC-BY-4.013 Oct 2026, 01:45open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 89% approved, and 1 in 2 is asked for more information.

Single-storey rear11 decided · more info asked 18%
100% · council 98%
New house in a garden or site19 decided · more info asked 47%
89% · council 78%
Approved nearbyMeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 30 nearby, 3,697 council-wide

Figure 3

Archdeaconry Glebe, file by file since 2022

2 of 2 decided extensions on the road were approved.

4 planning files on Archdeaconry Glebe since 2022, by kind and decision.20222023202420252026Extensions, atticsNo number · 2022 · single-storey rear · approved · 221063No. 7 · 2024 · attic conversion / dormer · approved · 24413Porches, roofs, otherNo. 30 · 2024 · other work · refused · 2460658No. 30 · 2025 · other work · approved · 2560434New house in a side garden
ApprovedRefusedWithdrawn or invalid

4 files with "Archdeaconry Glebe" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 13 Oct 2026, 01:45
    SourceLicenceFetchedLink
    npadCC-BY-4.013 Oct 2026, 01:45open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 4 is asked for more information, which adds about 100 days. Building starts about 2 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 4): 150 days; Appeal window: 4 weeks; Building starts: 58 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 48–53 (n=40)52 daysIf more info asked (1 in 4)With further information: median 150 days (n=14)150 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 58 days after permission (n=16)58 days after permissionSigned off75% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated54 decided home extensions, 16 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 4 appealed approvals were reversed.

    Approvals appealed4 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 500559 Granted with conditions · Carrick Lodge, Moynalty Road, Kells, Co. Meath, A82 D8Y1. · 475 m
    Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    courtsall-rights-reserved13 Oct 2026, 01:30open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Question 4

    What's changing around you?

    Street map around Moynalty Road with 4 numbered planning items
    ⌖ the houseEmpty land zoned for homesNo decision yet
    1. 11.9 ha zoned for homesEmpty land zoned for homes · 55 m
    2. 20.8 ha zoned for homesEmpty land zoned for homes · 60 m
    3. 332 Colmcille's villas, Kells 2660122No decision yet · 380 m
    4. 4Cavan Road, Townparks TD 2660298No decision yet · 445 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 18 permissions since 2016, 6 show a start notice and 2 have a completion certificate. Most owners opt out of sign-off.

    22 applications lodged within 500 m. Council: 20 approved, 2 refused. After appeals: 18 approved. Of those: 2 signed off, 4 built with the owner's opt-out, 0 started, 8 with no start notice found, 4 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT20: lodged → approved2: lodged → refused18: approved → approved2: refused → refused1 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal8: approved → no start notice found4: approved → built, owner opted out2: approved → signed off4: approved → ran out22 lodged22 lodged20 approved20 approved2 refused2 refused18 approved18 approved3 refused3 refused1 withdrawn1 withdrawn8 no start notice found8 no start notice found4 built, owner opted out4 built, owner opted out2 signed off2 signed off4 ran out4 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured22 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 2 within 500 m

      Empty land zoned for homes 2

      • 11.9 ha zoned for homes · no homes built on it yet · 55 m
      • 20.8 ha zoned for homes · no homes built on it yet · 60 m

      Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

      Sources: acp, bcms, derelict, npad · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.013 Oct 2026, 00:21open
      derelictCC-BY-4.012 Oct 2026, 23:08open
      npadCC-BY-4.013 Oct 2026, 01:45open
      Figure 8

      Applications within 500 m, by year

      Between 2 and 8 a year; busiest 2024. 91% of decisions were approvals.

      2017: 1, 2018: 2, 2020: 2, 2021: 2, 2022: 4, 2024: 8, 2025: 305102017: 1 approved1’17*2018: 2 approved2’182020: 2 approved2’202021: 2 approved2’212022: 4 approved4’222024: 6 approved2024: 2 refused8’242025: 3 approved3’25
      ApprovedRefusedWithdrawn or invalidUndecided

      2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 2 in the last 12 months

      See every application on the map

      • 4Cavan Road , Townparks TD , Kells No decision yet
        Construction of 3 no. new two-storey two-bedroom terraced houses with new driveway access for each from…
        266029813 Mar 20263 homes445 m
      • 332 Colmcille's villas , Kells , Co. Meath No decision yet
        the development will consist of the following (1) The demolition of the existing porch and the construction…
        26601223 Feb 20261 homes380 m
      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: npad, acp, bcms · fetched 13 Oct 2026, 01:45
      SourceLicenceFetchedLink
      npadCC-BY-4.013 Oct 2026, 01:45open
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.013 Oct 2026, 00:21open
      Homes coming 0 not started
      • Townparks · 74 homes · building started · 152 m
      • Townparks · 28 homes · building started · 346 m
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.013 Oct 2026, 00:21open
      npadCC-BY-4.013 Oct 2026, 01:45open
      social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Archdeaconry · 3 applications in 10 years · most common: single-storey rear

      Crèches and schools inspected

      NameLatest inspectionDistance
      Kids Klubs Childcare Limited · Crèche24 Jan 2024 · report · Tusla Early Years Inspectorate156 m
      Sunshine Community Childcare CLG · Crèche21 Aug 2024 · report · Tusla Early Years Inspectorate445 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: estates, schools, tusla_ey · fetched 27 Sept 2026, 20:18
      SourceLicenceFetchedLink
      estatesODbL-1.0 (OSM) + CC-BY-SA-4.0 (NHDS) + CC-BY-4.0 (Kildare)27 Sept 2026, 20:18open
      schoolsCC-BY-4.027 Sept 2026, 23:32open
      tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
      How busy is this area Busier than most of Meath County Council.
      Homes approved
      Here18
      Council middle0
      Homes started
      Here30
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.013 Oct 2026, 00:21open
      npadCC-BY-4.013 Oct 2026, 01:45open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      6% of homes built before 1971 (council 18%). 71% owner-occupied (council 75%).

      Homes built before 1971
      6% · council 18%
      Homes built since 2001
      51% · council 45%
      Owner-occupied
      71% · council 75%
      Rented
      24% · council 20%
      Children under 15
      20% · council 23%
      Aged 65 and over
      15% · council 12%
      Households with 2+ cars
      38% · council 54%
      Work mainly from home
      5% · council 11%
      This small area (313 people)Meath

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 167039004

      Bus
      476 m
      Eureka School · 109, 109X, 167 · busiest stop within 500 m: 5 an hour at peak
      Nearest school
      554 m
      Eureka Secondary School, 735 pupils
      Homes sold nearby
      25
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Eureka Secondary School · postprimary · 735 pupils · 554 m

      Stops 6

      • Eureka School · 109, 109X, 167, 177, 178, 186 · 4/hour at peak · 476 m
      • Eureka School · 109, 109A, 109X, 167, 177, 178 · 5/hour at peak · 478 m
      • Kells West · 107, 109, 109A, 109X, 177, 178 · 5/hour at peak · 601 m
      • Kells West · 187 · 0/hour at peak · 648 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Eureka Secondary School · 554 m-3.2% pupils (735)
      Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
      SourceLicenceFetchedLink
      gtfsCC-BY-4.011 Oct 2026, 23:43open
      schoolsCC-BY-4.027 Sept 2026, 23:32open
      npadCC-BY-4.013 Oct 2026, 01:45open
      consultpublic13 Oct 2026, 01:29open
      moderngovpublic13 Oct 2026, 01:29open
      lda_landsCC-BY-4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Work already done (221063): work kept with permission. Done as approved?
        Ask for: The retention grant and an opinion of compliance.
        Seller · solicitor
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Archdeaconry Glebe
      Electoral division
      Ceanannas Mór Rural
      Electoral area
      Kells
      Council
      Meath County Council
      Everything we found, as a list 8 lines
      • 2 applications on this site; latest 221063, approved 2022, work already done.
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • 2 sites nearby could change: 2 empty zoned plots.
      • Eureka School (bus 109, 109A) 478 m away: 5 an hour at morning peak; 9 from all stops within 500 m.
      • Here (2022 census): 71% owner-occupied (council 75%); 4% of homes empty (council 6%); most built 2001–2010; 70% drive to work (council 64%); population up 7% since 2016.
      • The council decides in a median 55 days (about 8 weeks); 38% are asked for more information.
      • Homes started within 1 km: 4 in the last year, 47 three years before.
      • 2 applications nearby in the last 12 months.
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • Permission for work already done (Retention permission): An application to keep something that was built without permission.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 27
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.012 Oct 2026
      data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
      dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public13 Oct 2026
      www2.courts.ie—all-rights-reserved13 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.012 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC-BY-4.012 Oct 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL-1.0 (OSM) + CC-BY-SA-4.0 (NHDS) +…27 Sept 2026
      transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
      lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)public13 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.013 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…13 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
      gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
      gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 13 Oct 2026, 22:08 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.