Battery Road, Longford
Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (94%). A building site 826 m away stopped before it was finished.
How planning works, with this area's numbers
steps can overlap · medians for home extensions within 1.5 km, 10 years- 1ApplySite notice up, plans online
- 2Comments5 weeks, €20. Comment to keep your right to appeal
- 3Decision8 weeks by law. Here 48 days
- 4Appeal window4 weeks after the decision
- 5AppealAt An Coimisiún Pleanála
- 6PermissionLasts 5 years
- 7StartStart notice to the council. Here about 4 months after
- 8Sign-offCompletion cert, or the owner opts out
What's the planning story of this house?
When it was built, and the rules since
Most homes here were built 2001–10, under planning permission and building regulations.
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
Zoning, protection, tax and flood: the detail
What it says
Residential: To provide for residential development and protect and improve residential amenity.
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
longford county development plan 2021 2027 · 30 Nov 2021 – 30 Nov 2027
Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Licensed industrial sites within 1.0 km: Barbour Threads Limited (972 m)
| Within 2.0 km | Count | For example |
|---|---|---|
| Heritage inventory buildings | 126 | garda station/constabulary barracks; house |
| Monuments | 67 | Enclosure; Ringfort - rath |
How we work this out
Sources: zoning, constraints.niah, epa_leap, rps.longford, rzlt, constraints, constraints.smr · fetched 4 Oct 2026, 23:11
| Source | Licence | Fetched | Link |
|---|---|---|---|
| zoning | CC-BY-4.0 | 4 Oct 2026, 23:11 | open |
| constraints.niah | CC-BY-4.0 | 27 Sept 2026, 19:35 | open |
| epa_leap | CC-BY-4.0 | 5 Oct 2026, 23:09 | open |
| rps.longford | unstated (council's public ArcGIS service; no licence published) · not redistributable — shown as a flag only | — | open |
| rzlt | CC-BY-4.0 | 4 Oct 2026, 23:59 | open |
| constraints | mixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false) | 27 Sept 2026, 19:37 | open |
| constraints.smr | CC-BY-4.0 | 27 Sept 2026, 19:29 | open |
How we work this out
Could you extend?
Nothing on this site restricts it: not protected, not in a conservation area.
What happened to applications like yours
A new house in a garden is harder: 100% approved, and 1 in 3 is asked for more information.
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 6 nearby, 560 council-wide
Abbeycartron, file by file since 2017
4 of 5 decided extensions on the road were approved.
13 files with "Abbeycartron" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.
MeasuredOur classificationcouncil register via NPAD · 2017–2026
Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m
Extensions and refusals near you 0 extensions within 250 m · the last 12 months
No home extensions within 250 m in the last 12 months.
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
How long, and what if someone objects?
A home extension's journey here
A decision takes 48 days. 1 in 3 is asked for more information, which adds about 91 days. Building starts about 4 months after permission.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated65 decided home extensions, 12 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
What appeals changed
1 of 6 appealed refusals became permissions. 2 of 8 appealed approvals were reversed.
Every appeal decided within 1.5 km in 10 years, any kind of development.
CalculatedAn Coimisiún Pleanála cases linked to the council file
Appeals nearby 4 in the last 12 months
What's changing around you?
- 1Killashee Street & Bog Lane 2560060
- 2Former Longford Creamery Site, and adjoining Residential Site 2660023
- 3Glack, Longford 2660223
- 41.4 ha zoned for homes
- 52.3 ha zoned for homes
- 60.4 ha zoned for homes
- 70.1 ha zoned for homes
- 80.2 ha zoned for homes
- 90.1 ha zoned for homes
- 10No. 26 Abbeycartron, Longford 2617
- 11Demesne Lane, Battery Road 2660025
- 12Longford Rugby Club, Demesne 2660033
- 13No. 8 Abbeycartron, Abbeycartron Td 2552
- 14Bridge Street, Abbeycartron Td 2660024
- 15Little Water Street, Longford 2660240
What happens to applications within 500 m
Permission isn't building. Of 29 permissions since 2016, 5 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured30 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
The next 30 days
1 deadline within 2.0 km; the first closes 14 Oct 2026.
- Time to ask the High Court for a review ends 14 Oct 20263 days leftRefuse permission508 m away
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Approved, stalled or planned, not built yet
10 homes 982 m away were approved Jan 2026 with no start notice yet; the permission runs to Jan 2031. 2 building sites nearby stopped before sign-off.
Each row is a dated fact from a public register: no score and no forecast.
Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)
Sites that could change 13 within 2.0 km
Building site that stopped 2
- Richmond Street, Longford · 23 homes, started Jan 2023, never signed off · 826 m
- Richmond Street, Longford · 10 homes, started Oct 2021, never signed off · 967 m
Approved, not started 1
- Killashee Street & Bog Lane · 10 homes approved Jan 2026, not started · 982 m
Empty land zoned for homes 10
- 41.4 ha zoned for homes · no homes built on it yet · 118 m
- 52.3 ha zoned for homes · no homes built on it yet · 392 m
- 60.4 ha zoned for homes · no homes built on it yet · 455 m
- 70.1 ha zoned for homes · no homes built on it yet · 501 m
- 80.2 ha zoned for homes · no homes built on it yet · 512 m
- 90.1 ha zoned for homes · no homes built on it yet · 545 m
- 5.0 ha zoned for homes · no homes built on it yet · 576 m
- 0.2 ha zoned for homes · no homes built on it yet · 657 m
- 0.4 ha zoned for homes · no homes built on it yet · 802 m
- 0.1 ha zoned for homes · no homes built on it yet · 885 m
Not covered here: council land to be sold, empty land zoned for homes (Dublin only).
Applications within 500 m, by year
Between 1 and 5 a year; busiest 2023. 100% of decisions were approvals.
2017 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Every application within 2.0 km 28 in the last 12 months
See every application on the map
- 15Little Water Street , Longford , Co. Longford No decision yetthe proposed construction of a warehousing unit adjoining existing warehousing unit granted planning…
- Richmond Street , Longford , Co. Longford No decision yetthe proposed conversion of existing first floor level habitable accommodation unit into 2 no. studio type…
- Dublin Road , Longford , Co. Longford No decision yetthe proposed renovations to an existing single-storey dwelling house together with the construction of a…
- Richmond Street , Longford , Co. Longford No decision yetthe proposed demolition of existing derelict two storey terraced type dwelling house together with the…
- 3Glack , Longford , Co. Longford No decision yeta) demolition of existing industrial building boundary fences, b) proposed construction of 20 no. dwellings…
- No. 16 Dublin Street , Longford , Co. Longford No decision yetthe proposed partial change of use of existing ground floor level currently used as commercial space into…
- No. 16 Dublin Street , Longford , Co. Longford Withdrawn or not validthe proposed partial change of use of existing ground floor level currently used as commercial space into…
- Attic House , Major's Well Road , Deanscurragh Approved with conditionssingle storey extension (82sqm) to side of detached single storey multi-purpose building to west boundary and…
- No. 16 Templemichael Glebe , Longford , Co. Longford Refusedretention & completion of construction works to an existing boiler house type structure, consisting of a…
- Langeera , Minard , Co. Longford Approved with conditionsmodifications to previously approved Planning Permission Ref. No. 22/258. These modifications include changes…
- Monaghan's Craft Butchers , 2 Killashee Street , Longford Approved with conditionsthe following for a.) Partial demolition of a single storey storage at the rear. b.) Proposed construction of…
- 1 Dublin Street & Chapel Lane , Longford , Co. Longford Approved with conditionsthe proposed change of use of the ground floor level of existing former public house into retail/commercial…
- Rear of No. 37 & Rear of No. 38 Ballymahon Street , Longford , and fronting onto Breadens Lane and Saints Quarter Refused(Ref No. 25/31) of the removal of storage areas and the erection of 4 No. own-door apartments with parking…
- 57 Dublin Street (ground floor) , Longford , Co. Longford Approved with conditionsamendments to shopfront and extractor outlet approved under planning ref. 24/18
- 10No. 26 Abbeycartron , Longford , Co. Longford Approved with conditionsmaterial alterations namely removal of window to elevation at ground floor level of existing dwelling house,…
- Convent Chapel , St Joseph’s Convent of Mercy , Saint Joseph’s Road Approved with conditionsrepair & insulation works to roof, repair of rainwater goods and all ancillary works, a PROTECTED STRUCTURE…
- Rear of St Mel’s Cathedral Dublin Street , & Teallach Íosa Family Centre , St. Mel’s Road Approved with conditions(1) New single storey shared link reception area (133 sqm), also linked at roof podium level, between crypt…
- Cloonrallagh , Longford , Co. Longford Approved with conditionsan existing two storey type dwelling house as constructed
- 12Longford Rugby Club , Demesne , Longford Approved with conditionsthe proposed construction of a standalone single-storey gym building incorporating gym/fitness areas,…
- 11Demesne Lane , Battery Road , Longford Co. Longford Approved with conditionsthe proposed construction of a two storey type dwelling house with detached garage, entrance, boundary…
- 14Bridge Street , Abbeycartron Td , County Longford Refuseda single storey flat roof, independent access extension to existing building, for office use, with existing…
- 2Former Longford Creamery Site , and adjoining Residential Site , Connaught Road Longford No decision yetthe demolition of on-site derelict structures, together with the construction of a residential development of…
- Gate Lodge St Mel's College , Saint Mel's Road Major's Well Road , Townsparks Approved with conditionsworks to a PROTECTED STRUCTURE ref. 517 as follows: retention of roof repairs; demolition of garage to east &…
- Clonbalt , Longford , Co. Longford Approved with conditionsof existing annex building which is used as a storage room and a utility room to service existing bungalow…
- Former EIR Depot Site , Templemichael Business Park , Ballinalee Road Approved with conditionsthe construction of a new, 3 Storey Manufacturing Facility, Warehouse and carpark, along with ancillary…
- Ardnacassa House , Ardnacassa , Dublin Road Approved with conditionsthe proposed construction of a single storey modular type dwelling house, entrance, boundary wall/fence,…
- 13No. 8 Abbeycartron , Abbeycartron Td , Longford Approvedof PL21/60 - to (1) construct a two storey extension to the rear of a detached two storey dwelling consisting…
- No. 55 Teffia Park , Longford , Co. Longford Approved with conditionsthe proposed removal of existing front boundary wall for the creation of vehicular access & onsite parking to…
How we work this out
Building work nearby 9 in the last 12 months
- Bridge Street, Longford, N39 EA43 · 15 Sept 2026 · start notice not signed off · PART 8. NO.129 · 481 m
- 11 Canal Walk, Longford, N39 H9N6 · 12 Aug 2026 · 2 homes · start notice not signed off · PART VIII-134 · 1.9 km
- 1 Dublin Street, Longford, N39 X2F8 · 28 Jul 2026 · start notice not signed off · 2660142 · 864 m
- Demesne Lane, Battery Road, Longford · 20 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2660025 · 355 m
- Ballinalee Road, Longford · 24 Jun 2026 · 7-day notice not signed off · 25/60267 · 1.4 km
- Cloonbalt, Longford, N39 A0W6 · 2 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 2460320 · 1.7 km
- Minard, Knockatee, Longford, N39E7N5 · 20 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 22258 · 1.5 km
- Templemichael Glebe, Longford, N39 DA02 · 21 Jan 2026 · start notice not signed off · 23/45 · 998 m
- Ballinalee Road, Longford, N39Y5X7 · 24 Oct 2025 · 7-day notice signed off · 25/60040 · 1.0 km
How we work this out
Source: bcms · fetched 10 Oct 2026, 23:46
| Source | Licence | Fetched | Link |
|---|---|---|---|
| bcms | CC-BY-4.0 | 10 Oct 2026, 23:46 | open |
Homes coming 10 not started
- Ard Michael · 93 homes · building started · 1.5 km
- St Joseph's Care Centre · 43 homes · ran out · runs out 18 Mar 2026 · 1.5 km
- Aghadegnan · 30 homes · building started · 542 m
- Richmond Street · 23 homes · building started · 833 m
- 1Killashee Street & Bog Lane · 10 homes · not started · runs out 6 Jan 2031 · 982 m
How we work this out
Named places nearby: estate, schemes, crèches, schools
How busy is this area Busier than most of Longford County Council.
How we work this out
What's the area like?
This street block against the council
55% owner-occupied (council 61%).
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 137044005
Schools, stops and the council
Schools
- St Christophers S S · primary · 49 pupils · 253 m
- St. Johns National School · primary · 67 pupils · 271 m
- Scoil Naomh Micheal · primary · 224 pupils · 705 m
- St. Mel's College · postprimary · 603 pupils · 802 m
- Templemichael College · postprimary · 365 pupils · 998 m
- Meán Scoil Muire · postprimary · 600 pupils · 1.1 km
- St Josephs Convent · primary · 527 pupils · 1.1 km
- St Emer's National School · primary · 215 pupils · 1.4 km
Stops 24
- Battery Road · 862 · 0/hour at peak · 274 m
- Battery Road · 862 · 0/hour at peak · 321 m
- Pearse Park · 862 · 0/hour at peak · 381 m
- Pearse Park · 862 · 0/hour at peak · 469 m
- Longford Centre · 862, 865 · 1/hour at peak · 720 m
- Longford Centre · 22, 862, 865 · 0/hour at peak · 730 m
Schools growing or shrinking planning in 3 years · pupils last year
- St Christophers S S · 253 m+14% pupils (49)
- St. Johns National School · 271 m+1.5% pupils (67)
- Scoil Naomh Micheal · 705 m-4.3% pupils (224) · an extension 2025, approved with conditions
- St. Mel's College · 802 m0% pupils (603) · an extension 2025, approved with conditions
- Templemichael College · 998 m+0.6% pupils (365)
Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 4 Oct 2026, 23:41
| Source | Licence | Fetched | Link |
|---|---|---|---|
| gtfs | CC-BY-4.0 | 4 Oct 2026, 23:41 | open |
| schools | CC-BY-4.0 | 27 Sept 2026, 23:32 | open |
| npad | CC-BY-4.0 | 11 Oct 2026, 01:43 | open |
| consult | public | 11 Oct 2026, 01:25 | open |
| moderngov | public | 11 Oct 2026, 01:26 | open |
| lda_lands | CC-BY-4.0 | 11 Sept 2026, 16:43 | open |
| cso_saps_2022 | CC BY 4.0 | — | open |
| National Transport Authority | CC BY 4.0 | — | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | CC BY 4.0 | — | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | CC BY 4.0 | — | — |
| EPA strategic noise maps | CC BY 4.0 | — | — |
| Fingal County Council | CC BY 4.0 | — | — |
What to ask, and who
- Mapped at 65–69 dB from road traffic: will you hear it inside?Visit at rush hourAsk for: A visit at rush hour (and at night), and the windows' glazing specification.
- Any work done without planning permission?Seller · solicitorAsk for: An opinion of compliance for the whole house.
Where this is, the terms, the sources
- Townland
- Abbeycartron
- Electoral division
- Longford No. 2 Urban
- Electoral area
- Longford
- Council
- Longford County Council
Everything we found, as a list 8 lines
- Zoned R2 (existing residential); not protected; no vacant land tax.
- 13 sites nearby could change: 2 stalled builds, 1 approved scheme, 10 empty zoned plots.
- 10 homes approved nearby, not started; largest 10 at Killashee Street & Bog Lane.
- Battery Road (bus 862) 274 m away: 5 a day, fewer than one an hour at morning peak.
- Noise from road traffic mapped at 65–69 dB (day-evening-night average, EPA 2022).
- Here (2022 census): 55% owner-occupied (council 61%); 9% of homes empty (council 14%); most built 2001–2010; 69% drive to work (council 59%); population up 9% since 2016.
- The council decides in a median 50 days (about 7 weeks); 37% are asked for more information.
- Homes started within 1 km: 1 in the last year, 24 three years before.
What the terms mean 9 terms
- Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
- Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
- Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
- Approved (Grant of permission): The council said yes, usually with conditions.
- Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
- Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
- Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
- What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
- Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
Sources and licences 27
| Source | Publisher | Licence | Fetched |
|---|---|---|---|
| EPA strategic noise maps | — | CC BY 4.0 | — |
| Fingal County Council | — | CC BY 4.0 | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | — | CC BY 4.0 | — |
| National Transport Authority | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | An Coimisiún Pleanála | CC-BY-4.0 | 9 Oct 2026 |
| data.nbco.gov.ie | National Building Control Office (BCMS) | CC-BY-4.0 | 10 Oct 2026 |
| data.gov.ie | Various (see each layer) | mixed — CC-BY-4.0 except OPW flood (CC… | 27 Sept 2026 |
| services-eu1.arcgis.com | National Inventory of Architectural Heritage | CC-BY-4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR) | CC-BY-4.0 | 27 Sept 2026 |
| dlrcoco.citizenspace.com | https: | Local authorities (consultation portals) | public | 11 Oct 2026 |
| www2.courts.ie | — | all-rights-reserved | 11 Oct 2026 |
| cso.ie | — | CC BY 4.0 | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | Local authorities (derelict sites registers) | CC-BY-4.0 | 5 Oct 2026 |
| data.epa.ie | Environmental Protection Agency (LEAP licence register) | CC-BY-4.0 | 5 Oct 2026 |
| transportforireland.ie | National Transport Authority | CC-BY-4.0 | 4 Oct 2026 |
| lda.ie | Land Development Agency | CC-BY-4.0 | 11 Sept 2026 |
| meetings.fingal.ie | Local authorities (council meetings) | public | 11 Oct 2026 |
| services.arcgis.com | Department of Housing (National Planning Application Database) | CC-BY-4.0 | 11 Oct 2026 |
| services-eu1.arcgis.com | Tailte Éireann | CC-BY-4.0 | 11 Sept 2026 |
| services-eu1.arcgis.com | CSO, Tailte Éireann, OpenStreetMap contributors | CC-BY-4.0 | 4 Oct 2026 |
| propertypriceregister.ie | Property Services Regulatory Authority (PPR) | PSI — PSRA re-use terms (psr.ie/re-use… | 11 Oct 2026 |
| services-eu1.arcgis.com | Local authorities (Record of Protected Structures) | unstated (council's public ArcGIS serv… · flag only | — |
| services.arcgis.com | Local authorities (RZLT maps) | CC-BY-4.0 | 4 Oct 2026 |
| gov.ie | Department of Education | CC-BY-4.0 | 27 Sept 2026 |
| gov.ie | Department of Housing | CC-BY-SA-4.0 | 9 Oct 2026 |
| services.arcgis.com | Local authorities via the Department of Housing (GZT / MyPlan) | CC-BY-4.0 | 4 Oct 2026 |