PlanningRegister.ie
Planning report · Longford County Council · 2000 m around the house · the last 12 months · 18 Oct 2026, 18:19

L5019, Longford

53.75077, -7.80383

Homes here mostly date from the 1990s. 2 planning files on this house, the latest from 2024.

See on the mapWatch this area

Not held yet for Longford County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations. 2 planning files on this house, the latest from 2025.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2025: 2460320 · work already done, approved2022: 21365 · work already done, approved

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    2460320 · work already done · approved 2025 · started, no sign-off needed
    approvedstartedsigned off?
  2. 2022
    21365 · work already done · approved 2022 · work already done
    approvedstartedsigned off?
On this site
Yes
Protected or listed · a recorded monument (Ringfort - rath)
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Monument zoneOn this site Ringfort - rath, Cloonbalt

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings25garda station/constabulary barracks; house
Monuments47Ringfort - rath
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3 on the draft 2027 map; 3 on the final 2026 map.
Sources: Development plan zoning (councils), Sites and Monuments Record, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 18 Oct 2026, 02:06
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    Question 3

    How long, and what if someone objects?

    Figure 2

    A home extension's journey here

    A decision takes 49 days.

    Comments open: 5 weeks · €20; Council decision: 49 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 47–52 (n=16)49 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off60% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated18 decided home extensions, 5 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 3

    What appeals changed

    0 of 2 appealed approvals were reversed.

    Approvals appealed2 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around L5019, Longford with 14 numbered planning items
    ⌖ the houseBuilding startedEmpty land zoned for homesApprovedRefusedNo decision yet
    1. 1Cloonbalt, Longford 2460320Building started · 24 m
    2. 21.4 ha zoned for homesEmpty land zoned for homes · 1.5 km
    3. 32.3 ha zoned for homesEmpty land zoned for homes · 1.5 km
    4. 45.0 ha zoned for homesEmpty land zoned for homes · 1.8 km
    5. 5Clonbalt, Longford 2560307Approved with conditions · 357 m
    6. 6Cloonrallagh, Longford 2660045Approved with conditions · 427 m
    7. 7Langeera, Minard 2660148Approved with conditions · 510 m
    8. 8Minard, Longford 2560261Refused · 1.2 km
    9. 9Longford Rugby Club, Demesne 2660033Approved with conditions · 1.5 km
    10. 10No. 8 Abbeycartron, Abbeycartron Td 2552Approved · 1.6 km
    11. 11No. 26 Abbeycartron, Longford 2617Approved with conditions · 1.7 km
    12. 12Demesne Lane, Battery Road 2660025Approved with conditions · 1.7 km
    13. 13Lismore House, Lismore 2560301Refused · 1.8 km
    14. 14Cluain Doire, Lamagh 2660233No decision yet · 1.9 km
    Figure 4

    What happens to applications within 500 m

    Permission isn't building. Of 11 permissions since 2016, 2 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    11 applications lodged within 500 m. Council: 11 approved, 0 refused. After appeals: 11 approved. Of those: 0 signed off, 2 built with the owner's opt-out, 0 started, 6 with no start notice found, 3 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT11: lodged → approved11: approved → approved6: approved → no start notice found2: approved → built, owner opted out3: approved → ran out11 lodged11 lodged11 approved11 approved11 approved11 approved6 no start notice found6 no start notice found2 built, owner opted out2 built, owner opted out3 ran out3 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured11 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 5

    The next 30 days

    Nothing closes within 2.0 km in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 3 within 2.0 km

      Empty land zoned for homes 3

      • 21.4 ha zoned for homes · no homes built on it yet · 1.5 km
      • 32.3 ha zoned for homes · no homes built on it yet · 1.5 km
      • 45.0 ha zoned for homes · no homes built on it yet · 1.8 km

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 18 Oct 2026, 02:06
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
      Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
      National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
      Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
      Figure 6

      Applications within 500 m, by year

      Between 1 and 2 a year; busiest 2019. 100% of decisions were approvals.

      2018: 1, 2019: 2, 2020: 1, 2021: 1, 2022: 1, 2024: 2, 2025: 2, 2026: 105102018: 1 approved1’18*2019: 2 approved2’192020: 1 approved1’202021: 1 approved1’212022: 1 approved1’222024: 2 approved2’242025: 2 approved2’252026: 1 approved1’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2018 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 2.0 km 10 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 18 Oct 2026, 02:06
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
      Building work nearby 3 in the last 12 months
      3 no sign-off needed
      • Demesne Lane, Battery Road, Longford · 20 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2660025 · 1.8 km
      • 1Cloonbalt, Longford, N39 A0W6 · 2 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 2460320 · 24 m
      • Minard, Knockatee, Longford, N39E7N5 · 20 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 22258 · 536 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 18 Oct 2026, 01:21
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
      Homes coming 0 not started
      • Aghadegnan · 30 homes · building started · 1.2 km
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 18 Oct 2026, 02:06
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
      National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
      Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Bright Beginnings · Crèche18 Jun 2026 · report · Tusla Early Years Inspectorate561 m
      Longford Montessori Centre · Crèche5 Mar 2025 · report · Tusla Early Years Inspectorateapprox. 762 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register14 Oct 2026, 23:20open
      How busy is this area About as busy as most of Longford County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here2
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 18 Oct 2026, 02:06
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
      National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
      Question 5

      What's the area like?

      Figure 7

      This street block against the council

      9% of homes built before 1971 (council 24%). 91% owner-occupied (council 61%).

      Homes built before 1971
      9% · council 24%
      Homes built since 2001
      7% · council 39%
      Owner-occupied
      91% · council 61%
      Rented
      9% · council 31%
      Children under 15
      11% · council 21%
      Aged 65 and over
      29% · council 16%
      Households with 2+ cars
      47% · council 39%
      Work mainly from home
      4% · council 8%
      This small area (181 people)Longford

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 137013007

      Bus
      313 m
      Clonbalt Wds · 862 · busiest stop within 500 m: 0 an hour at peak
      Nearest school
      1.8 km
      S N Cnoc An Mharcaigh, 289 pupils
      Schools, stops and the council

      Schools

      • S N Cnoc An Mharcaigh · primary · 289 pupils · 1.8 km
      • St Christophers S S · primary · 49 pupils · 1.9 km

      Stops 6

      • Clonbalt Wds · 862 · 0/hour at peak · 313 m
      • Clonbalt Wds · 862 · 0/hour at peak · 333 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 18 Oct 2026, 02:18
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Council consultation portalsPublic18 Oct 2026, 01:37open
      Council meetings (ModernGov)Public18 Oct 2026, 02:18open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Work already done (2460320): work kept with permission. Done as approved?
        Ask for: The retention grant and an opinion of compliance.
        Seller · solicitor
      2. Work already done (21365): work kept with permission. Done as approved?
        Ask for: The retention grant and an opinion of compliance.
        Seller · solicitor
      3. Next to a recorded monument: does digging need notice?
        Ask for: Details of past works from the seller.
        Seller · council
      4. Building work started 24 m away: for how long?
        Ask for: The planning conditions for 2460320.
        Agent · council
      5. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Cloonbalt
      Electoral division
      Caldragh
      Electoral area
      Longford
      Council
      Longford County Council
      Everything we found, as a list 8 lines
      • 2 applications on this site; latest 2460320, approved 2025, started, no sign-off needed.
      • Monument zone; no vacant land tax.
      • 3 sites nearby could change: 3 empty zoned plots.
      • Clonbalt Wds (bus 862) 313 m away: 5 a day, fewer than one an hour at morning peak.
      • Here (2022 census): 91% owner-occupied (council 61%); 8% of homes empty (council 14%); most built 1991–2000; 86% drive to work (council 59%).
      • The council decides in a median 50 days (about 7 weeks); 37% are asked for more information.
      • 10 applications nearby in the last 12 months; 78% approved (council 86%).
      • 1 building job started within 250 m in the last six months.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Permission for work already done (Retention permission): An application to keep something that was built without permission.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.018 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public18 Oct 2026
      www2.courts.ie—© the publisher18 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public18 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.018 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence18 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 18 Oct 2026, 18:19 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.