Planning report · Meath County Council · 2000 m around the house · the last 12 months · 28 Oct 2026, 13:27

Mountnugent Road, Oldcastle

53.77047, -7.16770

Homes here mostly date from the 1970s.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of OldcastleBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2021: 6 files on Oldcastle2022: 2 files on Oldcastle2023: 3 files on Oldcastle2024: 5 files on Oldcastle2025: 5 files on Oldcastle2026: 2 files on Oldcastle23 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
P5
Zoning · Rural and agricultural
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningP5 · Rural and agricultural
What it says

RA - Rural Area: Rural Area

Land zoned to stay rural. New houses are restricted to demonstrated local need under the rural-housing policy of the development plan.

meath county development plan 2021 2027 · 3 Nov 2021 – 2 Nov 2027

ZoningP5 · Rural and agricultural
What it says

RA - Rural Area: Rural Area

Land zoned to stay rural. New houses are restricted to demonstrated local need under the rural-housing policy of the development plan.

meath county development plan 2021 2027 as varied · 3 Nov 2021 – 2 Nov 2027

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Oldcastle (573 m); Gleneagle Woodcrafts Limited (703 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings70Crossdrum House
Monuments54Castle - motte and bailey; Ringfort - rath
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 11 on the draft 2027 map; 11 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 60% approved, and 1 in 3 is asked for more information.

New house in a garden or site5 decided · more info asked 40%
60% · council 75%
Approved nearbyMeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 5 nearby, 1,648 council-wide

Figure 3

Oldcastle, file by file since 2021

6 of 6 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

23 planning files on Oldcastle since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · single-storey rear · approved · 211571No. 22 · 2021 · two-storey rear · approved · 21223No number · 2022 · single-storey rear · approved · 221682No number · 2024 · porch / front · approved · 2461118No. 5 · 2025 · two-storey rear · approved · 2561162No number · 2026 · rear · approved · 2660676Porches, roofs, otherNo number · 2021 · other work · approved · 211420No. 1 · 2021 · other work · approved · 211476No number · 2021 · other work · approved · 21263No. 1 · 2021 · other work · approved · 21731No number · 2022 · other work · approved · 22252No number · 2023 · other work · approved · 23422No number · 2023 · other work · approved · 2360139No number · 2024 · other work · approved · 24392No number · 2024 · other work · approved · 24393No. 1 · 2024 · other work · approved · 2460129No number · 2024 · other work · approved · 2460227No number · 2025 · other work · approved · 25129No number · 2025 · other work · approved · 2560379No. 14 · 2025 · other work · approved · 2560825No number · 2025 · other work · approved · 2561388No number · 2026 · other work · approved · 2660910New house in a side gardenNo. 24 · 2023 · new house · approved · 2353624
ApprovedRefusedWithdrawn or invalid

23 files with "Oldcastle" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 54 days.

    Comments open: 5 weeks · €20; Council decision: 54 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 51–57 (n=10)54 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off67% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated12 decided home extensions, 6 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 1 appealed approvals were reversed.

    Approvals appealed1 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 502266 Invalid · Farrellys Pub, Church Street, Oldcastle, Co. Meath · 427 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher27 Oct 2026, 23:11open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Question 4

    What's changing around you?

    Street map around Mountnugent Road, Oldcastle with 14 numbered planning items
    ⌖ the houseWindow closingEmpty land zoned for homesApprovedNo decision yet
    1. 1Cloughan Street, Oldcastle 2660676Approved with conditions · 391 m
    2. 21.9 ha zoned for homesEmpty land zoned for homes · 128 m
    3. 32.2 ha zoned for homesEmpty land zoned for homes · 129 m
    4. 40.8 ha zoned for homesEmpty land zoned for homes · 161 m
    5. 50.1 ha zoned for homesEmpty land zoned for homes · 356 m
    6. 61.5 ha zoned for homesEmpty land zoned for homes · 509 m
    7. 73.9 ha zoned for homesEmpty land zoned for homes · 596 m
    8. 8No.5 Ardfrail Close, Oldcastle 2561162Approved with conditions · 303 m
    9. 9Farrellys Pub, Church Street 2660910Approved with conditions · 427 m
    10. 10Oliver Plunkett Street, Oldcastle 2561388Approved with conditions · 449 m
    11. 11Rudagh, Oldcastle 2561316Approved with conditions · 614 m
    12. 1215 Church Street, Oldcastle 2660727No decision yet · 698 m
    13. 137 Whitehills, Oldcastle 2660089Approved with conditions · 961 m
    14. 14Glenboy, Oldcastle 25240Approved with conditions · 1.5 km
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 20 permissions since 2016, 9 show a start notice and 5 have a completion certificate.

    21 applications lodged within 500 m. Council: 21 approved, 0 refused. After appeals: 20 approved. Of those: 5 signed off, 2 built with the owner's opt-out, 2 started, 11 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT21: lodged → approved20: approved → approved1 approved by the council, refused after an appeal11: approved → no start notice found2: approved → built, owner opted out2: approved → started, not signed off5: approved → signed off21 lodged21 lodged21 approved21 approved20 approved20 approved1 refused1 refused11 no start notice found11 no start notice found2 built, owner opted out2 built, owner opted out2 started, not signed off2 started, not signed off5 signed off5 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured21 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 2.0 km; the first closes 5 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-05 2660676: CONDITIONAL — The development will consist of planning permission for the following: 1) Construction of hardware warehouse storage exttoday2 Nov7 Nov12 Nov17 Nov22 Nov27 Nov2660676: CONDITIONAL — The development will consist of planning permission for the following: 1) Construction of hardware warehouse storage ext · 391 m away · 2026-11-05
    Time to appeal ends
    • Time to appeal ends 5 Nov 20268 days left
      12660676 · CONDITIONAL — The development will consist of planning permission for the following: 1) Construction of hardware…
      €220 to An Coimisiún Pleanála (€110 observer) · 391 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 7 within 2.0 km

    Empty land zoned for homes 7

    • 21.9 ha zoned for homes · no homes built on it yet · 128 m
    • 32.2 ha zoned for homes · no homes built on it yet · 129 m
    • 40.8 ha zoned for homes · no homes built on it yet · 161 m
    • 50.1 ha zoned for homes · no homes built on it yet · 356 m
    • 61.5 ha zoned for homes · no homes built on it yet · 509 m
    • 73.9 ha zoned for homes · no homes built on it yet · 596 m
    • 2.4 ha zoned for homes · no homes built on it yet · 917 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 2 and 5 a year; busiest 2024. 100% of decisions were approvals.

    2021: 6, 2022: 2, 2023: 2, 2024: 5, 2025: 4, 2026: 205102021: 6 approved6’21*2022: 2 approved2’222023: 2 approved2’232024: 5 approved5’242025: 4 approved4’252026: 2 approved2’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 2.0 km 11 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    Building work nearby 1 in the last 12 months
    1 not signed off
    • Cogan Street & Cavan Street, Oldcastle, Meath · 4 Sept 2026 · 40 homes · start notice not signed off · 25129 · 234 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 28 Oct 2026, 02:21
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    ABC Montessori · Crèche9 Mar 2026 · report · Tusla Early Years Inspectorateapprox. 173 m
    The Caterpillar Academy of Montessori · Crèche9 Oct 2024 · report · Tusla Early Years Inspectorateapprox. 173 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 27 Oct 2026, 23:04
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Meath County Council.
    Homes approved
    Here79
    Council middle0
    Homes started
    Here117
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    42% of homes built before 1971 (council 18%). 85% owner-occupied (council 75%).

    Homes built before 1971
    42% · council 18%
    Homes built since 2001
    23% · council 45%
    Owner-occupied
    85% · council 75%
    Rented
    8% · council 20%
    Children under 15
    18% · council 23%
    Aged 65 and over
    27% · council 12%
    Households with 2+ cars
    53% · council 54%
    Work mainly from home
    18% · council 11%
    This small area (310 people)Meath

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 167070005/01/167070001

    Bus
    382 m
    Oldcastle · 187 · busiest stop within 500 m: 1 an hour at peak
    Nearest school
    365 m
    St Oliver Post Primary, 630 pupils
    Homes sold nearby
    17
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • St Oliver Post Primary · postprimary · 630 pupils · 365 m
    • Gilson National School · primary · 222 pupils · 651 m

    Stops 1

    • Oldcastle · 187 · 1/hour at peak · 382 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Oliver Post Primary · 365 m-1.7% pupils (630)
    • Gilson National School · 651 m-2.2% pupils (222)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Council consultation portalsPublic28 Oct 2026, 00:59open
    Council meetings (ModernGov)Public28 Oct 2026, 02:10open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Zoned P5 (rural and agricultural), not for homes: could you extend?
      Ask for: A solicitor's or planner's view.
      Solicitor · planner
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Oldcastle
    Electoral division
    Oldcastle
    Electoral area
    Kells
    Council
    Meath County Council
    Everything we found, as a list 8 lines
    • Zoned P5 (rural and agricultural); not protected; no vacant land tax.
    • 7 sites nearby could change: 7 empty zoned plots.
    • Oldcastle (bus 187) 382 m away: 11 a day, fewer than one an hour at morning peak.
    • Here (2022 census): 85% owner-occupied (council 75%); 8% of homes empty (council 6%); most built 1971–1980; 59% drive to work (council 64%).
    • The council decides in a median 55 days (about 8 weeks); 38% are asked for more information.
    • Homes started within 1 km: 40 in the last year, 4 three years before.
    • 11 applications nearby in the last 12 months; 100% approved (council 87%).
    • 1 building job started within 250 m in the last six months.
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.028 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public28 Oct 2026
    www2.courts.ie—© the publisher27 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public28 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.028 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence28 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    water.ie—© the publisher · flag only—
    water.ie—© the publisher · flag only—
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 28 Oct 2026, 13:27 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.