Planning report · Louth County Council · 2000 m around the house · the last 12 months · 17 Oct 2026, 13:19

L22542

53.84012, -6.44177

Homes here mostly date from the 2000s. 2 applications nearby open for comments.

See on the mapWatch this area

Not held yet for Louth County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of DrominBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2018: 1 file on Dromin2020: 1 file on Dromin2023: 1 file on Dromin2024: 1 file on Dromin2025: 2 files on Dromin6 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings9Richardstown Castle; Rathcoole House
Monuments35Enclosure; Souterrain
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 17% approved, and 1 in 6 is asked for more information.

New house in a garden or site6 decided · more info asked 17%
17% · council 68%
Approved nearbyLouth overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 6 nearby, 1,024 council-wide

Figure 3

Dromin, file by file since 2018

3 of 3 decided extensions on the road were approved. New houses in side gardens or on sites: 0 of 1.

6 planning files on Dromin since 2018, by kind and decision.201820192020202120222023202420252026Extensions, atticsNo number · 2018 · first-floor · approved · 18168No number · 2020 · other extension · approved · 20987No number · 2024 · other extension · approved · 2470Porches, roofs, otherNo number · 2025 · other work · approved · 2560223No number · 2025 · other work · approved · 2560354New house in a side gardenNo number · 2023 · new house · refused · 23389
ApprovedRefusedWithdrawn or invalid

6 files with "Dromin" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2018–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 3

    How long, and what if someone objects?

    Figure 4

    What appeals changed

    0 of 1 appealed refusals became permissions. 0 of 1 appealed approvals were reversed.

    Refusals appealed1 decided
    0 became permissions
    Approvals appealed1 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 500778 Pending · Dromin Knockatober Cangy Mooremount Richardstown (ED Stabannan)… · 190 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher17 Oct 2026, 01:34open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 4

    What's changing around you?

    Street map around L22542 with 8 numbered planning items
    ⌖ the houseOpen for commentsAppealRefusedNo decision yetApproved
    1. 1Dromin House Dromin, Dunleer 2660688No decision yet · 813 m
    2. 2Toberdoney, Dromin Dunleer 2660636No decision yet · 1.7 km
    3. 3Dromin Knockatober Cangy Mooremount Richardstown (ED Stabannan) Painestown Ballymageragh and Knockdinnin, County Louth 500778Appeal: no decision yet · 190 m
    4. 4Dromin House Dromin, Dunleer 2560728Refused · 663 m
    5. 5Knockatober, Dunleer 2660506No decision yet · 1.3 km
    6. 6Knockatober, Dunleer 25186Approved with conditions · 1.6 km
    7. 7Dromin, Dunleer 2560753Approved with conditions · 1.7 km
    8. 8Richardstown, Dromin 2660467Refused · 1.8 km
    Figure 5

    The next 30 days

    2 deadlines within 2.0 km; the first closes 21 Oct 2026.

    2 deadlines in the next 30 days: 2026-10-21 2660636: application received — Retention permission for detached Dog Kennels and all associated site works; 2026-11-11 2660688: application received — Retention of a tennis court, the retention of a replacement agricultural shed, and the retention of the refurbishment oftoday22 Oct27 Oct1 Nov6 Nov11 Nov16 Nov2660636: application received — Retention permission for detached Dog Kennels and all associated site works · 1.7 km away · 2026-10-212660688: application received — Retention of a tennis court, the retention of a replacement agricultural shed, and the retention of the refurbishment of · 813 m away · 2026-11-11
    Comments close
    • Comments close 21 Oct 20264 days left
      22660636 · application received — Retention permission for detached Dog Kennels and all associated site works
      €20 to the council · 1.7 km away
    • Comments close 11 Nov 202625 days left
      12660688 · application received — Retention of a tennis court, the retention of a replacement agricultural shed, and the retention…
      €20 to the council · 813 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 6

    Applications within 500 m, by year

    Between 1 and 1 a year; busiest 2020. 80% of decisions were approvals.

    2018: 1, 2020: 1, 2023: 1, 2024: 1, 2025: 105102018: 1 approved1’18*2020: 1 approved1’202023: 1 refused1’232024: 1 approved1’242025: 1 approved1’25
    ApprovedRefusedWithdrawn or invalidUndecided

    2018 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 12 in the last 12 months

    See every application on the map

    • Pine Haven Dromin , Dunleer , Co. Louth Withdrawn or not valid
      Retention permission for: 1. A front porch. 2. Conversion of the existing first floor area to habitable…
      266067230 Sept 20261 homes1.3 km
    • Dromin House Dromin , Dunleer , Co Louth Withdrawn or not valid
      Retention permission for a tennis court, the retention of a replacement agricultural shed, and the retention…
      266064318 Sept 2026813 m
    • 5Knockatober , Dunleer , County Louth No decision yet
      Retention and Permission: Retention permission for a two storey dwelling house with a single storey annexe, a…
      266050627 Jul 20262 homes1.3 km
    • 8Richardstown , Dromin , Dunleer Refused
      1. Retention permission for dwellinghouse, 2. Retention permission for 2 No. sheds to rear of dwellinghouse,…
      26604674 Sept 20262 homes1.8 km
    • Knockatober , Dunleer , County Louth Withdrawn or not valid
      Retention and Permission: The retention development consists of the retention of a two storey dwelling house…
      266043129 Jun 20262 homes1.3 km
    • Richardstown , Dromin , Dunleer Withdrawn or not valid
      Retention and Permission: 1. Retention permission for dwelling house. 2. Retention permission for 2 No. sheds…
      266041825 Jun 20262 homes1.8 km
    • 6Knockatober , Dunleer , Co Louth Approved with conditions
      Permission for an extension and alterations to existing dwelling house and associated site development works
      2518613 Feb 20261 homes1.6 km
    • 7Dromin , Dunleer , County Louth Approved with conditions
      Permision for the construction of a dwelling house, waste water treatment system and percolation area, access…
      256075314 Aug 20261 homes1.7 km
    • 4Dromin House Dromin , Dunleer , Co Louth Refused
      Retention of a tennis court, the retention of a replacement agricultural shed, and the retention of the…
      256072830 Jun 20261 homes663 m
    • Knockatober , Dunleer , County Louth Withdrawn or not valid
      The retention development consists of the retention of a two storey dwellinghouse with single storey annexe,…
      256066521 Oct 20251 homes1.3 km
    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Building work nearby 3 in the last 12 months
    1 not signed off2 no sign-off needed
    • Knockatober, Haynestown, Louth · 28 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 25186 · 1.6 km
    • Greenlanes, Dromin, Louth · 30 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 2560366 · 983 m
    • To the Rear of The Village Saloon, Dromin, Louth, A92 H7T1 · 23 Feb 2026 · start notice not signed off · 2560354 · 510 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 17 Oct 2026, 01:09
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    0
    Named places nearby: estate, schemes, crèches, schools
    How busy is this area About as busy as most of Louth County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here2
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 5

    What's the area like?

    Figure 7

    This street block against the council

    88% owner-occupied (council 67%).

    Homes built before 1971
    36% · council 28%
    Homes built since 2001
    30% · council 33%
    Owner-occupied
    88% · council 67%
    Rented
    5% · council 28%
    Children under 15
    16% · council 21%
    Aged 65 and over
    14% · council 14%
    Households with 2+ cars
    71% · council 38%
    Work mainly from home
    9% · council 10%
    This small area (408 people)Louth

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 147015002

    Nearest school
    506 m
    Dromin NS, 97 pupils
    Schools, stops and the council

    Schools

    • Dromin NS · primary · 97 pupils · 506 m

    Stops 0

      Schools growing or shrinking planning in 3 years · pupils last year

      • Dromin NS · 505 m+1% pupils (97)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 17 Oct 2026, 02:12
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
      Council consultation portalsPublic17 Oct 2026, 01:36open
      Council meetings (ModernGov)Public17 Oct 2026, 02:12open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Application 813 m away open for comments until 11 Nov 2026: comment?
        Ask for: The plans on the council's website (€20 to comment).
        Council
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Dromin
      Electoral division
      Dromin
      Electoral area
      Ardee
      Council
      Louth County Council
      Everything we found, as a list 8 lines
      • Not protected; no vacant land tax.
      • Nothing nearby looks set to change.
      • 2 applications open for comments nearby; nearest closes 11 Nov 2026.
      • No scheduled public transport within 800 m.
      • Here (2022 census): 88% owner-occupied (council 67%); 6% of homes empty (council 8%); most built 2001–2010; 63% drive to work (council 59%); population up 8% since 2016.
      • The council decides in a median 52 days (about 7 weeks); 40% are asked for more information.
      • 12 applications nearby in the last 12 months.
      • 2 homes started within 1 km in 3 years (council middle 2).
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 25
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.017 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public17 Oct 2026
      www2.courts.ie—© the publisher17 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public17 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.017 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence17 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 17 Oct 2026, 13:19 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.