PlanningRegister.ie
Planning report · Louth County Council · 2000 m around the house · the last 12 months · 17 Oct 2026, 10:36

Jervis Street

53.85407, -6.54297

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (97%). A building site 687 m away stopped before it was finished.

See on the mapWatch this area

Not held yet for Louth County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 48 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of TownparksBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2019: 1 file on Townparks2022: 2 files on Townparks2024: 1 file on Townparks2025: 2 files on Townparks6 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect and enhance the amenity and character of existing residential communities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

louth county development plan · 11 Nov 2021 – 1 Jan 2027

Monument zone1 within 100 m Ford, Townparks (Ardee By.)

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings63Bank of Ireland; house
Monuments61Burial ground; Enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 23 on the draft 2027 map; 23 on the final 2026 map.
Sources: Development plan zoning (councils), Sites and Monuments Record, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 93% by type. A new house in a garden is harder: 80% approved, and 1 in 2 are asked for more information.

Single-storey rear15 decided · more info asked 7%
93% · council 98%
New house in a garden or site15 decided · more info asked 53%
80% · council 68%
Approved nearbyLouth overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 30 nearby, 1,460 council-wide

Figure 3

Townparks, file by file since 2019

6 planning files on Townparks since 2019, by kind and decision.20192020202120222023202420252026Extensions, atticsPorches, roofs, otherNo number · 2019 · other work · refused · 19422No number · 2022 · other work · approved · 22337No number · 2022 · other work · approved · 22806No number · 2024 · other work · approved · 2460492No number · 2025 · other work · approved · 2560392No number · 2025 · other work · approved · 2560475New house in a side garden
ApprovedRefusedWithdrawn or invalid

6 files with "Townparks" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2019–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 48 days. 1 in 6 is asked for more information, which adds about 83 days. Building starts about 6 months after permission.

    Comments open: 5 weeks · €20; Council decision: 48 days; If more info asked (1 in 6): 132 days; Appeal window: 4 weeks; Building starts: 183 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 mo21 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 48 days, middle half 44–50 (n=60)48 daysIf more info asked (1 in 6)With further information: median 132 days (n=13)132 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 183 days after permission (n=29)183 days after permissionSigned off481 days after the start, for the few who file. 62% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated73 decided home extensions, 29 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 6 appealed refusals became permissions. 5 of 14 appealed approvals were reversed.

    Refusals appealed6 decided
    0 became permissions
    Approvals appealed14 decided
    5 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 5 in the last 12 months
    • 324546 Pending · Bridgegate & Fir Rois, Rathgory & Mulladrillen,, Drogheda Road,… · 809 m
    • 500704 Refused · 41 Sliabh Breagh, Ardee, Co Louth, A92 D281 · 828 m
    • 500292 Refused · The Black Ridge, Townparks, Ardee, Co. Louth. · 695 m
    • 500271 Refused · 112 Sliabh Breagh, Ardee, County Louth · 932 m
    • 323972 Pending · Ardee, Co. Louth · 208 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher17 Oct 2026, 01:34open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 4

    What's changing around you?

    Street map around Jervis Street with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedBuilding site that stoppedLarge schemeEmpty land zoned for homesApproved
    1. 1Unit 3, Dundalk Road 2660665No decision yet · 985 m
    2. 2Patrick Tierney Street, Ardee 2660565Approved with conditions · 417 m
    3. 3Ardee Bread Company Castle Street 2660139Approved, no sign building has started · 323 m
    4. 4Market Street and Market House Lane 22331Approved, no sign building has started · 558 m
    5. 5Irish Street/Rogan's Lane/Markethouse Lane 22375Approved, no sign building has started · 569 m
    6. 6Bridgegate, Drogheda Road 19336Building site that stopped · 687 m
    7. 7Dawsons Demesne 2360237Approved, no sign building has started · 1.1 km
    8. 8Moorhall Rise, Hale Street 2560834Withdrawn or not valid · 1.0 km
    9. 91.3 ha zoned for homesEmpty land zoned for homes · 219 m
    10. 100.2 ha zoned for homesEmpty land zoned for homes · 237 m
    11. 111.6 ha zoned for homesEmpty land zoned for homes · 276 m
    12. 120.1 ha zoned for homesEmpty land zoned for homes · 446 m
    13. 135.3 ha zoned for homesEmpty land zoned for homes · 552 m
    14. 14Farrell Furniture, John Street 2660318Approved with conditions · 76 m
    15. 15John Street, Ardee 2660488Approved with conditions · 238 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 69 permissions since 2016, 20 show a start notice and 10 have a completion certificate.

    85 applications lodged within 500 m. Council: 73 approved, 12 refused. After appeals: 69 approved. Of those: 10 signed off, 4 built with the owner's opt-out, 6 started, 28 with no start notice found, 21 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT73: lodged → approved12: lodged → refused69: approved → approved12: refused → refused3 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal28: approved → no start notice found4: approved → built, owner opted out6: approved → started, not signed off10: approved → signed off21: approved → ran out85 lodged85 lodged73 approved73 approved12 refused12 refused69 approved69 approved15 refused15 refused1 withdrawn1 withdrawn28 no start notice found28 no start notice found4 built, owner opted out4 built, owner opted out6 started, not signed off6 started, not signed off10 signed off10 signed off21 ran out21 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured85 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 2.0 km; the first closes 30 Oct 2026.

    2 deadlines in the next 30 days: 2026-10-30 2660565: CONDITIONAL — Permission for alterations to an existing building façade to incorporate 4 new windows and for associated siteworks.; 2026-11-02 2660665: application received — Permission for the change of use from existing factory to wellness studio with new external signage, together with all atoday22 Oct27 Oct1 Nov6 Nov11 Nov16 Nov2660565: CONDITIONAL — Permission for alterations to an existing building façade to incorporate 4 new windows and for associated siteworks. · 417 m away · 2026-10-302660665: application received — Permission for the change of use from existing factory to wellness studio with new external signage, together with all a · 985 m away · 2026-11-02
    Comments closeTime to appeal ends
    • Time to appeal ends 30 Oct 202613 days left
      22660565 · CONDITIONAL — Permission for alterations to an existing building façade to incorporate 4 new windows and for associated…
      €220 to An Coimisiún Pleanála (€110 observer) · 417 m away
    • Comments close 2 Nov 202616 days left
      12660665 · application received — Permission for the change of use from existing factory to wellness studio with new external…
      €20 to the council · 985 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    48 homes 1.1 km away were approved Dec 2023 with no start notice yet; the permission runs to Dec 2028. 1 building site nearby stopped before sign-off.

    Bridgegate, Drogheda Road · 159 homes: 159 homes, started Aug 2020, never signed off; Dawsons Demesne · 48 homes: 48 homes approved Dec 2023, not started; Market Street and Market… · 28 homes: 28 homes approved Apr 2023, not started; Ardee Bread Company… · 20 homes: 20 homes approved Sep 2026, not started20202021202220232024202520262027202820292030Bridgegate, Drogheda Road · 159 homes687 m · 19336159 homes, started Aug 2020, never signed off159 homes, started Aug 2020, never signed offDawsons Demesne · 48 homes1.1 km · 236023748 homes approved Dec 2023, not started48 homes approved Dec 2023, not startedMarket Street and Market… · 28 homes558 m · 2233128 homes approved Apr 2023, not started28 homes approved Apr 2023, not startedArdee Bread Company… · 20 homes323 m · 266013920 homes approved Sep 2026, not started20 homes approved Sep 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 15 within 2.0 km

    Building site that stopped 1

    Approved, not started 4

    Empty land zoned for homes 10

    • 91.3 ha zoned for homes · no homes built on it yet · 219 m
    • 100.2 ha zoned for homes · no homes built on it yet · 237 m
    • 111.6 ha zoned for homes · no homes built on it yet · 276 m
    • 120.1 ha zoned for homes · no homes built on it yet · 446 m
    • 135.3 ha zoned for homes · no homes built on it yet · 552 m
    • 1.3 ha zoned for homes · no homes built on it yet · 695 m
    • 4.4 ha zoned for homes · no homes built on it yet · 874 m
    • 3.8 ha zoned for homes · no homes built on it yet · 1.0 km
    • 0.2 ha zoned for homes · no homes built on it yet · 1.0 km
    • 0.2 ha zoned for homes · no homes built on it yet · 1.1 km

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
    Figure 9

    Applications within 500 m, by year

    Between 5 and 12 a year; busiest 2025. 86% of decisions were approvals.

    2017: 11, 2018: 10, 2019: 9, 2020: 6, 2021: 11, 2022: 7, 2023: 7, 2024: 5, 2025: 12, 2026: 7051015202017: 9 approved2017: 2 refused11’17*2018: 9 approved2018: 1 refused10’182019: 7 approved2019: 2 refused9’192020: 5 approved2020: 1 refused6’202021: 11 approved11’212022: 6 approved2022: 1 refused7’222023: 6 approved2023: 1 refused7’232024: 5 approved5’242025: 11 approved2025: 1 refused12’252026: 4 approved2026: 3 refused7’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 1Unit 3 , Dundalk Road , Ardee Co. Louth comments close 2 Nov 2026
      Permission for the change of use from existing factory to wellness studio with new external signage, together…
      266066528 Sept 2026985 m
    Every application within 2.0 km 42 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Building work nearby 13 in the last 12 months
    2 signed off as finished7 not signed off4 no sign-off needed
    • 111 Cherrybrook, Ardee, Louth · 20 Oct 2026 · 224 homes · start notice not signed off · 20/759 ABP-313083-22 · 965 m
    • 9 Bridgegate Close, Ardee, Louth, A92 K38V · 19 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 640 m
    • Glebe, Ardee, Louth · 15 Oct 2026 · start notice not signed off · 2660363 · 1.6 km
    • Moorhall Rise, Hale Street,, Ardee, Louth · 21 Sept 2026 · 17 homes · start notice not signed off · 2660046 · 1.1 km
    • St. Tierney Street, Ardee, Louth, A92 H1FX · 27 Jun 2026 · 7-day notice not signed off · 449 m
    • Mullanstown, Mullenstown, Louth · 2 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 2560538 · 2.0 km
    • 21 Castle Street, Ardee, Louth, A92 Y0CR · 21 May 2026 · 7-day notice signed off · 282 m
    • The Boat Trench, Ardee, Louth · 1 May 2026 · 21 homes · start notice not signed off · 2460476 · 219 m
    • Castle Street, Ardee, Louth, A92 WR25 · 29 Apr 2026 · start notice not signed off · PT8LH94 · 306 m
    • 10 Markethouse / Rogans Lane, Ardee, Louth, A92 H528 · 15 Dec 2025 · 4 homes · start notice not signed off · 2560396 · 569 m
    • bohernamoe, Ardee, Louth, A92XT28 · 12 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 2560501 · 978 m
    • bohernamoe, Ardee, Louth, A92TW92 · 3 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 2560380 · 978 m
    • Castle Street, Ardee, Louth, A92 APK4 · 21 Nov 2025 · start notice signed off · 2460072 · 278 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 17 Oct 2026, 01:09
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Homes coming 106 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Aladdin's Cave Montessori School and Créche · Crèche14 Jul 2025 · report · Tusla Early Years Inspectorateapprox. 620 m
    Mary's House Ballapousta · Crèche28 Jan 2025 · report · Tusla Early Years Inspectorateapprox. 620 m
    Shining Stars Pre- School · Crèche31 Mar 2025 · report · Tusla Early Years Inspectorateapprox. 620 m
    Venessa's Little Legends · Crèche12 Feb 2026 · report · Tusla Early Years Inspectorateapprox. 620 m
    Cheeky Monkey Early Years Limited · Crèche16 Sept 2024 · report · Tusla Early Years Inspectorate941 m
    Toddlers' Hill Creche & Montessori · Crèche13 Aug 2025 · report · Tusla Early Years Inspectorate955 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Louth County Council.
    Homes approved
    Here42
    Council middle0
    Homes started
    Here368
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    38% owner-occupied (council 67%).

    Homes built before 1971
    26% · council 28%
    Homes built since 2001
    48% · council 33%
    Owner-occupied
    38% · council 67%
    Rented
    57% · council 28%
    Children under 15
    13% · council 21%
    Aged 65 and over
    15% · council 14%
    Households with 2+ cars
    20% · council 38%
    Work mainly from home
    5% · council 10%
    This small area (288 people)Louth

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 147002009

    Bus
    119 m
    Aldi Ardee · 177 · busiest stop within 500 m: 3 an hour at peak
    Nearest school
    389 m
    Ardee Community School, 1317 pupils
    Schools, stops and the council

    Schools

    • Ardee Community School · postprimary · 1317 pupils · 389 m
    • Ardee Monastery · primary · 244 pupils · 419 m
    • S N Mhuire na Trocaire · primary · 339 pupils · 618 m
    • Ardee Educate Together NS · primary · 177 pupils · 990 m

    Stops 9

    • Aldi Ardee · 177 · 1/hour at peak · 119 m
    • Ardee Ch · 167, 182, 980, DK08 · 2/hour at peak · 353 m
    • Ardee Ch · 167, 182, 980, DK08 · 3/hour at peak · 388 m
    • Ardee · 167, 177, 180, 182, 980, 980A · 3/hour at peak · 659 m
    • Ardee · 167, 177, 182, 980, 980A, 980B · 4/hour at peak · 672 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Ardee Community School · 389 m-2.7% pupils (1,317)
    • Ardee Monastery · 419 m-5.4% pupils (244)
    • S N Mhuire na Trocaire · 618 m+8% pupils (339)
    • Ardee Educate Together NS · 990 m+2.3% pupils (177)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 17 Oct 2026, 02:12
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Council consultation portalsPublic17 Oct 2026, 01:36open
    Council meetings (ModernGov)Public17 Oct 2026, 02:12open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 984 m away open for comments until 2 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Townparks
    Electoral division
    Ardee Urban
    Electoral area
    Ardee
    Council
    Louth County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 15 sites nearby could change: 1 stalled build, 4 approved schemes, 10 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 2 Nov 2026.
    • 106 homes approved nearby, not started; largest 48 at Dawsons Demesne.
    • Ardee Ch (bus 167, 182) 388 m away: 3 an hour at morning peak; 6 from all stops within 500 m.
    • Here (2022 census): 56% rent (council 28%); 14% of homes empty (council 8%); most built 2001–2010; 44% drive to work (council 59%); population up 11% since 2016.
    • Around here the council decides in a median 51 days (about 7 weeks); 35% are asked for more information.
    • Homes started within 1 km: 252 in the last year, 15 three years before.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 26
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.017 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public17 Oct 2026
    www2.courts.ie—© the publisher17 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public17 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.017 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence17 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 17 Oct 2026, 10:36 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.