Planning report · Mayo County Council · 500 m around the house · the last 12 months · 14 Oct 2026, 17:24

Brooklands, Castlebar

53.85645, -9.30448

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (97%).

See on the mapWatch this area
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 8 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of GarryduffBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2017: 3 files on Garryduff2018: 3 files on Garryduff2019: 3 files on Garryduff2020: 2 files on Garryduff2021: 4 files on Garryduff2022: 2 files on Garryduff2023: 1 file on Garryduff2025: 3 files on Garryduff2026: 1 file on Garryduff22 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
M2
Zoning · Major town centre
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningM2 · Major town centre
What it says

Town Centre: To maintain and enhance the vitality, viability and environment of the town centre and provide for appropriate town centre uses.

The main town centre — retail, offices, civic uses, apartments.

castlebar local area plan · 17 Jan 2024 – 16 Jan 2030

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings47Old Church Graveyard; New Cemetery
Monuments8Historic town; Crannog
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 6 on the draft 2027 map; 7 on the final 2026 map.
Sources: zoning, rzlt, constraints, constraints.niah, constraints.smr · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 14 Oct 2026, 00:33
SourceLicenceFetchedLink
bcmsCC-BY-4.014 Oct 2026, 00:33open
npadCC-BY-4.014 Oct 2026, 02:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 83% approved, and 1 in 2 are asked for more information.

New house in a garden or site53 decided · more info asked 66%
83% · council 91%
Approved nearbyMayo overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 53 nearby, 3,380 council-wide

Figure 3

Garryduff, file by file since 2017

4 of 4 decided extensions on the road were approved. New houses in side gardens or on sites: 3 of 4.

22 planning files on Garryduff since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo number · 2017 · other extension · approved · 17722No. 35 · 2018 · other extension · approved · 18328No. 7 · 2018 · single-storey side · approved · 18987No number · 2019 · other extension · approved · 1933Porches, roofs, otherNo number · 2017 · other work · refused · 17274No number · 2018 · other work · approved · 18995No number · 2019 · other work · refused · 19584No number · 2020 · other work · approved · 201041No number · 2020 · other work · refused · 20515No number · 2021 · other work · approved · 211385No number · 2021 · other work · approved · 21742No number · 2021 · other work · refused · 21930No number · 2022 · other work · approved · 221142No number · 2023 · other work · approved · 23436No number · 2025 · other work · approved · 2560129No number · 2025 · other work · approved · 2560297No number · 2025 · other work · approved · 2560723No number · 2026 · other work · approved · 2660297New house in a side gardenNo number · 2017 · new house · approved · 171029No number · 2019 · new house · refused · 19127No number · 2021 · new house · approved · 21659No number · 2022 · new house · approved · 22676
ApprovedRefusedWithdrawn or invalid

22 files with "Garryduff" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 14 Oct 2026, 02:03
    SourceLicenceFetchedLink
    npadCC-BY-4.014 Oct 2026, 02:03open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    npadCC-BY-4.014 Oct 2026, 02:03open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 3 is asked for more information, which adds about 90 days. Building starts about 8 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 3): 144 days; Appeal window: 4 weeks; Building starts: 232 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 49–54 (n=67)52 daysIf more info asked (1 in 3)With further information: median 144 days (n=39)144 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 232 days after permission (n=10)232 days after permissionSigned off50% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated106 decided home extensions, 10 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 8 appealed refusals became permissions. 2 of 4 appealed approvals were reversed.

    Refusals appealed8 decided
    1 became permissions
    Approvals appealed4 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Brooklands, Castlebar with 15 numbered planning items
    ⌖ the houseWindow closingEmpty land zoned for homesApprovedNo decision yet
    1. 1Ellison Street, Castlebar 2660303Approved with conditions · 340 m
    2. 20.9 ha zoned for homesEmpty land zoned for homes · 63 m
    3. 30.2 ha zoned for homesEmpty land zoned for homes · 192 m
    4. 40.4 ha zoned for homesEmpty land zoned for homes · 357 m
    5. 510.3 ha zoned for homesEmpty land zoned for homes · 370 m
    6. 60.7 ha zoned for homesEmpty land zoned for homes · 391 m
    7. 70.1 ha zoned for homesEmpty land zoned for homes · 423 m
    8. 8Cavendish Lane, Knockacroghery 2660288Approved with conditions · 289 m
    9. 9Stephen Garvey Way and Mountain View, Castlebar 2660501No decision yet · 314 m
    10. 10Castle Street, Castlebar 2660106Approved with conditions · 388 m
    11. 11Mill Lane, Castlebar 2660317Approved with conditions · 414 m
    12. 12Humbert Mall, Castlebar 2660040Approved with conditions · 428 m
    13. 13Garryduff, Castlebar 2660297Approved with conditions · 464 m
    14. 1413 Garryduff Park, Castlebar 2650Approved with conditions · 466 m
    15. 1524 St Patricks Ave, Castlebar 2660671No decision yet · 476 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 86 permissions since 2016, 12 show a start notice and 5 have a completion certificate.

    103 applications lodged within 500 m. Council: 87 approved, 16 refused. After appeals: 86 approved. Of those: 5 signed off, 3 built with the owner's opt-out, 4 started, 43 with no start notice found, 31 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT87: lodged → approved16: lodged → refused86: approved → approved16: refused → refused1 approved by the council, refused after an appeal43: approved → no start notice found3: approved → built, owner opted out4: approved → started, not signed off5: approved → signed off31: approved → ran out103 lodged103 lodged87 approved87 approved16 refused16 refused86 approved86 approved17 refused17 refused43 no start notice found43 no start notice found3 built, owner opted out3 built, owner opted out4 started, not signed off4 started, not signed off5 signed off5 signed off31 ran out31 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured103 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 19 Oct 2026.

    1 deadlines in the next 30 days: 2026-10-19 2660303: CONDITIONAL — Planning Permission to change the use of existing vacant single dwelling house to form 4 ground floor offices/studios antoday19 Oct24 Oct29 Oct3 Nov8 Nov13 Nov2660303: CONDITIONAL — Planning Permission to change the use of existing vacant single dwelling house to form 4 ground floor offices/studios an · 340 m away · 2026-10-19
    Time to appeal ends
    • Time to appeal ends 19 Oct 20265 days left
      12660303 · CONDITIONAL — Planning Permission to change the use of existing vacant single dwelling house to form 4 ground floor…
      €220 to An Coimisiún Pleanála (€110 observer) · 340 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 7 within 500 m

    Empty land zoned for homes 7

    • 20.9 ha zoned for homes · no homes built on it yet · 63 m
    • 30.2 ha zoned for homes · no homes built on it yet · 192 m
    • 40.4 ha zoned for homes · no homes built on it yet · 357 m
    • 510.3 ha zoned for homes · no homes built on it yet · 370 m
    • 60.7 ha zoned for homes · no homes built on it yet · 391 m
    • 70.1 ha zoned for homes · no homes built on it yet · 423 m
    • 0.8 ha zoned for homes · no homes built on it yet · 468 m

    Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

    Sources: acp, bcms, derelict, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    derelictCC-BY-4.012 Oct 2026, 23:08open
    npadCC-BY-4.014 Oct 2026, 02:03open
    Figure 8

    Applications within 500 m, by year

    Between 6 and 14 a year; busiest 2023. 84% of decisions were approvals.

    2017: 15, 2018: 10, 2019: 6, 2020: 9, 2021: 10, 2022: 13, 2023: 14, 2024: 8, 2025: 10, 2026: 8051015202017: 13 approved2017: 2 refused15’17*2018: 9 approved2018: 1 refused10’182019: 5 approved2019: 1 refused6’192020: 5 approved2020: 4 refused9’202021: 9 approved2021: 1 refused10’212022: 13 approved13’222023: 12 approved2023: 2 refused14’232024: 5 approved2024: 3 refused8’242025: 9 approved2025: 1 refused10’252026: 7 approved2026: 1 refused8’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 14 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 14 Oct 2026, 02:03
    SourceLicenceFetchedLink
    npadCC-BY-4.014 Oct 2026, 02:03open
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    Building work nearby 5 in the last 12 months
    1 signed off as finished3 not signed off1 no sign-off needed
    • Riverside, Newtown, Castlebar, Mayo · 7 Sept 2026 · 4 homes · start notice not signed off · 201041 · 207 m
    • 17 Main Street, Castlebar, Mayo · 3 Jul 2026 · 4 homes · start notice not signed off · 2560316 · 420 m
    • 27 Market Street, Castlebar, Mayo, F23 H367 · 17 Apr 2026 · start notice signed off · 273 m
    • 39 Ellison Street, Castlebar, Mayo, F23 TD50 · 13 Dec 2025 · short notice no sign-off needed · P25/60572 · 315 m
    • 1A Newtown, Castlebar, Mayo, F23 WV66 · 19 Nov 2025 · start notice not signed off · P23/60041 · 260 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 14 Oct 2026, 00:33
    SourceLicenceFetchedLink
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Brooklands · 1 applications in 10 years

    Crèches and schools inspected

    NameLatest inspectionDistance
    Little Treasures Creche · Crèche11 Jan 2023 · report · Tusla Early Years Inspectorate219 m
    Curious Minds · Crèche9 May 2024 · report · Tusla Early Years Inspectorate318 m
    Imagination Station · Crèche3 Dec 2025 · report · Tusla Early Years Inspectorate624 m
    Juniors Childcare · Crèche10 Jun 2026 · report · Tusla Early Years Inspectorate792 m
    Ballyheane Buttercups · Crèche26 Jan 2026 · report · Tusla Early Years Inspectorate818 m
    Buttercups Playschool and Afterschool Castlebar · Crèche16 Dec 2024 · report · Tusla Early Years Inspectorate818 m
    Naionra Tir na Nog · Crèche27 Nov 2025 · report · Tusla Early Years Inspectorate908 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: estates, schools, tusla_ey · fetched 27 Sept 2026, 20:18
    SourceLicenceFetchedLink
    estatesODbL-1.0 (OSM) + CC-BY-SA-4.0 (NHDS) + CC-BY-4.0 (Kildare)27 Sept 2026, 20:18open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
    How busy is this area Busier than most of Mayo County Council.
    Homes approved
    Here345
    Council middle0
    Homes started
    Here305
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.014 Oct 2026, 00:33open
    npadCC-BY-4.014 Oct 2026, 02:03open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    43% owner-occupied (council 73%).

    Homes built before 1971
    28% · council 26%
    Homes built since 2001
    8% · council 32%
    Owner-occupied
    43% · council 73%
    Rented
    48% · council 21%
    Children under 15
    14% · council 19%
    Aged 65 and over
    19% · council 20%
    Households with 2+ cars
    19% · council 45%
    Work mainly from home
    5% · council 9%
    This small area (240 people)Mayo

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 157049007

    Bus
    265 m
    Castlebar · 420, 422, 430 · busiest stop within 500 m: 4 an hour at peak
    Nearest school
    178 m
    Castlebar Educate Together National School, 113 pupils
    Schools, stops and the council

    Schools

    • Castlebar Educate Together National School · primary · 113 pupils · 178 m
    • St. Geralds College · postprimary · 688 pupils · 261 m
    • Castlebar Primary School · primary · 864 pupils · 348 m
    • St Brids Special Sch · primary · 40 pupils · 698 m
    • St Joseph's Secondary School · postprimary · 542 pupils · 865 m
    • Davitt College · postprimary · 902 pupils · 935 m
    • Gaelscoil Raifteirí · primary · 229 pupils · 943 m

    Stops 8

    • Castlebar · 420, 422, 430, 440, 454, 456 · 4/hour at peak · 265 m
    • Castlebar · 430, 454, 460a, 460b, 498, 721 · 2/hour at peak · 273 m
    • Ellison Street · 437 · 336 m
    • Ellison Street · 437 · 343 m
    • Mayo Hospital · 422, 440, 454, 456, 460a, 460b · 3/hour at peak · 507 m
    • Mayo Hospital · 420, 422, 440, 454, 456, 460a · 3/hour at peak · 523 m
    • Castlebar Library · UL05 · 560 m
    • Castlebar Library · UL05 · 573 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Castlebar Educate Together National School · 178 m-11.7% pupils (113)
    • St. Geralds College · 261 m+3.5% pupils (688)
    • Castlebar Primary School · 348 m+1.8% pupils (864)
    • St Brids Special Sch · 698 m+17.6% pupils (40) · 3 classrooms 2026, no decision yet
    • St Joseph's Secondary School · 865 m+0.6% pupils (542)
    • Davitt College · 934 m+2.5% pupils (902) · temporary classrooms 2026, approved with conditions
    Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
    SourceLicenceFetchedLink
    gtfsCC-BY-4.011 Oct 2026, 23:43open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    npadCC-BY-4.014 Oct 2026, 02:03open
    consultpublic14 Oct 2026, 01:30open
    moderngovpublic14 Oct 2026, 01:30open
    lda_landsCC-BY-4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Garryduff
    Electoral division
    Castlebar Urban
    Electoral area
    Castlebar
    Council
    Mayo County Council
    Everything we found, as a list 8 lines
    • Zoned M2 (major town centre); not protected; no vacant land tax.
    • 7 sites nearby could change: 7 empty zoned plots.
    • Castlebar (bus 420, 422) 265 m away: 4 an hour at morning peak; 6 from all stops within 500 m.
    • Here (2022 census): 48% rent (council 21%); 18% of homes empty (council 22%); most built 1991–2000; 45% drive to work (council 66%); population up 8% since 2016.
    • Around here the council decides in a median 62 days (about 9 weeks); 42% are asked for more information.
    • Homes started within 1 km: 158 in the last year, 40 three years before.
    • 14 applications nearby in the last 12 months; 88% approved (council 93%).
    • St Brids Special Sch, 698 m away: 3 classrooms applied for (2026). Pupils up 18% last year.
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.013 Oct 2026
    data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
    dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public14 Oct 2026
    www2.courts.ie—all-rights-reserved14 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.012 Oct 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL-1.0 (OSM) + CC-BY-SA-4.0 (NHDS) +…27 Sept 2026
    transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
    lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)public14 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.014 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…14 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
    gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
    gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 14 Oct 2026, 17:24 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.