Planning report · Louth County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 22:45

Potters Field

53.86015, -6.53145

Homes here mostly date from the 2000s. 3 planning files on this house, the latest from 2022. Home extensions nearby almost always get approved (98%).

See on the mapWatch this area

Not held yet for Louth County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 48 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 16 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 3 planning files on this house, the latest from 2022.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 3 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of CappocksgreenBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2022: 22529 · extension, withdrawn or invalid2021: 211190 · extension, approved2021: 211061 · extension, withdrawn or invalid2021: 4 files on Cappocksgreen2022: 2 files on Cappocksgreen2023: 3 files on Cappocksgreen2024: 3 files on Cappocksgreen2025: 1 file on Cappocksgreen13 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2022
    22529 · extension · withdrawn
    approved?started?signed off?
  2. 2021
    211190 · extension · approved 2021 · built, signed off
    approvedstartedsigned off
  3. 2021
    211061 · extension · withdrawn
    approved?started?signed off?
On this site
R1
Zoning · New residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail
ZoningR1 · New residential
What it says

New Residential Phase 1: To provide for new residential neighbourhoods and supporting community facilities.

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

louth county development plan · 11 Nov 2021 – 1 Jan 2027

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Ardee (579 m)

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings1Greenvale House
Monuments5Castle - motte; Ecclesiastical site
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 5 on the draft 2027 map; 5 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 90% by type. A new house in a garden is harder: 71% approved, and 1 in 2 is asked for more information.

Single-storey rear10 decided · more info asked 10%
90% · council 98%
New house in a garden or site7 decided · more info asked 43%
71% · council 58%
Approved nearbyLouth overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 17 nearby, 893 council-wide

Figure 3

Cappocksgreen, file by file since 2021

5 of 5 decided extensions on the road were approved.

13 planning files on Cappocksgreen since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 1 · 2021 · garage conversion · approved · 21457No. 6 · 2023 · garage conversion · approved · 2360390No. 7 · 2023 · garage conversion · approved · 2360392No. 2 · 2024 · attic conversion / dormer · approved · 2479No number · 2025 · other extension · approved · 2560457Porches, roofs, otherNo number · 2021 · other work · approved · 211190No number · 2021 · other work · approved · 211387No number · 2021 · other work · approved · 2120No number · 2022 · other work · approved · 22604No number · 2022 · other extension · approved · 22616No number · 2023 · other work · approved · 2310No number · 2024 · other work · approved · 24144No number · 2024 · other work · approved · 2482New house in a side garden
ApprovedRefusedWithdrawn or invalid

13 files with "Cappocksgreen" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 48 days. Building starts about 16 months after permission.

    Comments open: 5 weeks · €20; Council decision: 48 days; Appeal window: 4 weeks; Building starts: 472 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 mo21 mo24 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 48 days, middle half 44–50 (n=34)48 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 472 days after permission (n=15)472 days after permissionSigned off73% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated41 decided home extensions, 15 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 2 appealed refusals became permissions. 2 of 4 appealed approvals were reversed.

    Refusals appealed2 decided
    0 became permissions
    Approvals appealed4 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months
    • 500292 Refused · The Black Ridge, Townparks, Ardee, Co. Louth. · 246 m
    • 323972 Pending · Ardee, Co. Louth · 223 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher30 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 4

    What's changing around you?

    Street map around Potters Field with 7 numbered planning items
    ⌖ the houseEmpty land zoned for homesNo decision yetApproved
    1. 10.2 ha zoned for homesEmpty land zoned for homes · 121 m
    2. 20.1 ha zoned for homesEmpty land zoned for homes · 136 m
    3. 31.3 ha zoned for homesEmpty land zoned for homes · 246 m
    4. 44.4 ha zoned for homesEmpty land zoned for homes · 0 m
    5. 5Junction of N33 & O’Carroll St, Cappocksgreen 2660611No decision yet · 88 m
    6. 62 Old Dawsons Demesne, Ardee 2660445Approved with conditions · 446 m
    7. 7Lands at Old Dawsons Demesne, Ardee 2560764Approved with conditions · 470 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 24 permissions since 2016, 11 show a start notice and 3 have a completion certificate. Most owners opt out of sign-off.

    25 applications lodged within 500 m. Council: 24 approved, 1 refused. After appeals: 24 approved. Of those: 3 signed off, 6 built with the owner's opt-out, 2 started, 12 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT24: lodged → approved1: lodged → refused24: approved → approved1: refused → refused12: approved → no start notice found6: approved → built, owner opted out2: approved → started, not signed off3: approved → signed off1: approved → ran out25 lodged25 lodged24 approved24 approved1 refused1 refused24 approved24 approved1 refused1 refused12 no start notice found12 no start notice found6 built, owner opted out6 built, owner opted out2 started, not signed off2 started, not signed off3 signed off3 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured25 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 4 within 500 m

      Empty land zoned for homes 4

      • 10.2 ha zoned for homes · no homes built on it yet · 121 m
      • 20.1 ha zoned for homes · no homes built on it yet · 136 m
      • 31.3 ha zoned for homes · no homes built on it yet · 246 m
      • 44.4 ha zoned for homes · no homes built on it yet · 0 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 8

      Applications within 500 m, by year

      Between 3 and 6 a year; busiest 2023. 96% of decisions were approvals.

      2021: 7, 2022: 3, 2023: 6, 2024: 4, 2025: 4, 2026: 105102021: 7 approved7’21*2022: 3 approved3’222023: 6 approved6’232024: 4 approved4’242025: 3 approved2025: 1 refused4’252026: 1 approved1’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 4 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Homes coming 0 not started
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Cheeky Monkey Early Years Limited · Crèche16 Sept 2024 · report · Tusla Early Years Inspectorate723 m
      Toddlers' Hill Creche & Montessori · Crèche13 Aug 2025 · report · Tusla Early Years Inspectorate996 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of Louth County Council.
      Homes approved
      Here137
      Council middle0
      Homes started
      Here95
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      49% owner-occupied (council 67%).

      Homes built before 1971
      27% · council 28%
      Homes built since 2001
      50% · council 33%
      Owner-occupied
      49% · council 67%
      Rented
      49% · council 28%
      Children under 15
      22% · council 21%
      Aged 65 and over
      14% · council 14%
      Households with 2+ cars
      39% · council 38%
      Work mainly from home
      8% · council 10%
      This small area (473 people)Louth

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 147002006

      Road noise
      45–49 dB
      day–night average (EPA 2022)
      Bus
      644 m
      Ardee · 167, 177, 182
      Nearest school
      731 m
      Ardee Educate Together NS, 177 pupils
      Schools, stops and the council

      Schools

      • Ardee Educate Together NS · primary · 177 pupils · 731 m
      • S N Mhuire na Trocaire · primary · 339 pupils · 821 m
      • Ardee Monastery · primary · 244 pupils · 982 m

      Stops 7

      • Ardee · 167, 177, 182, 980, 980A, 980B · 4/hour at peak · 644 m
      • Ardee · 167, 177, 180, 182, 980, 980A · 3/hour at peak · 655 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Ardee Educate Together NS · 731 m+2.3% pupils (177)
      • S N Mhuire na Trocaire · 821 m+8% pupils (339)
      • Ardee Monastery · 982 m-5.4% pupils (244)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      Council consultation portalsPublic31 Oct 2026, 01:06open
      Council meetings (ModernGov)Public31 Oct 2026, 02:21open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. On the vacant land tax map: is the 3% tax being paid?
        Ask for: Your solicitor's check of liability or exemption.
        Solicitor
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Cappocksgreen
      Electoral division
      Ardee Urban
      Electoral area
      Ardee
      Council
      Louth County Council
      Everything we found, as a list 8 lines
      • 3 applications on this site; latest 22529, withdrawn.
      • Zoned R1 (new residential); not protected; on the vacant land tax map.
      • 4 sites nearby could change: 4 empty zoned plots.
      • No morning-peak service within 500 m; nearest is Ardee, 644 m away (4 an hour).
      • Noise from road traffic mapped at 45–49 dB (day-evening-night average, EPA 2022).
      • Here (2022 census): 48% owner-occupied (council 67%); 11% of homes empty (council 8%); most built 2001–2010; 64% drive to work (council 59%); population up 11% since 2016.
      • Around here the council decides in a median 51 days (about 7 weeks); 35% are asked for more information.
      • Homes started within 1 km: 25 in the last year, 28 three years before.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 27
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
      www2.courts.ie—© the publisher30 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 31 Oct 2026, 22:45 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.