PlanningRegister.ie
Planning report · Leitrim County Council · 2000 m around the house · the last 12 months · 4 Nov 2026, 00:05

L55501, Mohill

53.92694, -7.86196

Homes here mostly date from the 2000s. 14 homes approved 613 m away haven't started.

See on the mapWatch this area

Not held yet for Leitrim County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 48 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
Yes
Protected or listed · inside the zone around a recorded monument (LE032-066----)
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Monument zoneOn this site Ritual site - holy well, Tullybradan

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings42Fortview House; Droim Cille
Monuments26Ringfort - rath; Ritual site - holy well
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), Sites and Monuments Record, SMR zones of notification, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 1 Nov 2026, 23:58
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 3 Nov 2026, 23:15
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
National Planning Application DatabaseCC BY 4.03 Nov 2026, 23:15open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 88% approved, and 1 in 8 is asked for more information.

New house in a garden or site8 decided · more info asked 12%
88% · council 97%
Approved nearbyLeitrim overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 8 nearby, 241 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 3 Nov 2026, 23:15
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 23:15open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 3 Nov 2026, 23:15
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 23:15open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 48 days.

    Comments open: 5 weeks · €20; Council decision: 48 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 48 days, middle half 44–53 (n=8)48 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off67% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated10 decided home extensions, 3 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    0 of 2 appealed approvals were reversed.

    Approvals appealed2 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months
    • 500659 Invalid · Drumboy , Mohill , Co. Leitrim · 1.1 km
    • 501077 Pending · Eir Exchange, Main Street Upper, Mohill, Co Leitrim · 798 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 3 Nov 2026, 23:17
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher3 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 23:15open
    Question 4

    What's changing around you?

    Street map around L55501, Mohill with 13 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedApprovedNo decision yet
    1. 1Main Street Upper, Mohill 2660237No decision yet · 673 m
    2. 2Hill Street, Mohill 2660235No decision yet · 680 m
    3. 3Hill Street 2560054Approved, no sign building has started · 613 m
    4. 4Green Road Mohill Td, Mohill 2660009Approved with conditions · 284 m
    5. 5Green Road, Mohill 2660201No decision yet · 429 m
    6. 6Main Street & Hyde Street, Mohill 2660160Approved with conditions · 660 m
    7. 7Coolabaun, Mohill 2615Approved with conditions · 844 m
    8. 8Rosharry, Mohill 2660194Approved with conditions · 986 m
    9. 9Cornee, Mohill 2524Approved with conditions · 1.3 km
    10. 10Ussaun, Mohill 2560306No decision yet · 1.5 km
    11. 11Gortfadda, Mohill 2616Approved with conditions · 1.6 km
    12. 12Lisdadnan, Mohill 2660089Approved with conditions · 1.7 km
    13. 13Tamlaght Beg, Mohill 2660162Approved with conditions · 2.0 km
    Figure 5

    The next 30 days

    2 deadlines within 2.0 km; the first closes 6 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-06 2660235: application received — part single storey/part storey and a half dwelling extension to side of existing dwelling incorporating kitchen, living ; 2026-11-10 2660237: application received — Develop site to rear of Main Street and construct 2 no. single storey semi-detached bungalows, connect to existing servitoday9 Nov14 Nov19 Nov24 Nov29 Nov4 Dec2660235: application received — part single storey/part storey and a half dwelling extension to side of existing dwelling incorporating kitchen, living · 680 m away · 2026-11-062660237: application received — Develop site to rear of Main Street and construct 2 no. single storey semi-detached bungalows, connect to existing servi · 673 m away · 2026-11-10
    Comments close
    • Comments close 6 Nov 20262 days left
      22660235 · application received — part single storey/part storey and a half dwelling extension to side of existing dwelling…
      €20 to the council · 680 m away
    • Comments close 10 Nov 20266 days left
      12660237 · application received — Develop site to rear of Main Street and construct 2 no. single storey semi-detached bungalows,…
      €20 to the council · 673 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 6

    Approved, stalled or planned, not built yet

    14 homes 613 m away were approved Sept 2025 with no start notice yet; the permission runs to Sept 2030.

    Hill Street · 14 homes: 14 homes approved Sep 2025, not started20242025202620272028202920302031Hill Street · 14 homes613 m · 256005414 homes approved Sep 2025, not started14 homes approved Sep 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 1 within 2.0 km

    Approved, not started 1

    • Hill Street · 14 homes approved Sep 2025, not started · 613 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 3 Nov 2026, 23:15
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
    Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 23:15open
    Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
    Figure 7

    Applications within 500 m, by year

    2023: 1, 2026: 105102023: 1 approved1’23*2026: 1 approved1’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2023 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 2Hill Street , Mohill , Co. Leitrim comments close 6 Nov 2026
      part single storey/part storey and a half dwelling extension to side of existing dwelling incorporating…
      26602352 Oct 20261 homes680 m
    • 1Main Street Upper , Mohill , Co. Leitrim. comments close 10 Nov 2026
      Develop site to rear of Main Street and construct 2 no. single storey semi-detached bungalows, connect to…
      26602376 Oct 20262 homes673 m
    Every application within 2.0 km 14 in the last 12 months

    See every application on the map

    • 5Green Road , Mohill , Co. Leitrim No decision yet
      construct single storey extension to side and rear of existing commercial garage, alterations to elevations…
      266020118 Aug 2026429 m
    • Green Road , Mohill , Co. Leitrim Withdrawn or not valid
      Construct single storey extension to side and rear of existing commercial garage, alterations to elevations…
      266045818 Aug 2026429 m
    • 8Rosharry , Mohill , Co. Leitrim Approved with conditions
      Planning Permission to (a) construct single storey dwelling, new entrance & driveway, waste water treatment…
      266019421 Sept 20261 homes986 m
    • 13Tamlaght Beg , Mohill , Co. Leitrim Approved with conditions
      Proposed construction of a two-storey dwelling house with detached domestic garage, boundary fence/wall,…
      266016210 Sept 20261 homes2.0 km
    • 6Main Street & Hyde Street , Mohill , Co. Leitrim Approved with conditions
      sub-divide and convert four storey vacant public house premises including living accommodation on first,…
      266016019 Oct 2026660 m
    • 11Gortfadda , Mohill , Co. Leitrim Approved with conditions
      conversion of existing granary to living accommodation and all associated works
      261612 Oct 20261 homes1.6 km
    • 7Coolabaun , Mohill , Co. Leitrim Approved with conditions
      construct a new 50 metre by 34 metre synthetically surfaced sport pitch, erection of flood lighting, erection…
      26153 Jun 2026844 m
    • 12Lisdadnan , Mohill , Co. Leitrim Approved with conditions
      Proposed construction of a two story type dwelling house, detached garage, entrance, boundary fence/wall,…
      26600892 Jul 20261 homes1.7 km
    • 4Green Road Mohill Td , Mohill , Co Leitrim Approved with conditions
      (a) Change of Use of Existing Dwelling House & Garage to Childcare Facility, (b) Demolition of Existing Shed…
      26600095 Mar 2026284 m
    • 10Ussaun , Mohill , Co. Leitrim No decision yet
      construct detached domestic storage shed and associated site works
      256030612 Dec 20251.5 km
    • 9Cornee , Mohill , Co. Leitrim Approved with conditions
      erection of an extension to the side of dwelling and connect to existing treatment plant and associated works
      252415 Jan 20261 homes1.3 km
    • Main Street Upper , Mohill , Co. Leitrim. Refused
      Develop site to rear of Main Street and construct 4 no two-storey 2-bed townhouses, bin store, landscaping,…
      256029426 Jan 20264 homes673 m
    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 3 Nov 2026, 23:15
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 23:15open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
    Building work nearby 6 in the last 12 months
    3 not signed off3 no sign-off needed
    • Lisdadnan, Mohill, Leitrim · 27 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2660089 · 1.7 km
    • Drumboy, Mohill, Leitrim · 27 May 2026 · 1 homes · start notice, opted out no sign-off needed · 2560197 · 1.1 km
    • Castle Street, Mohill, Leitrim, N41 WF83 · 18 May 2026 · 3 homes · start notice not signed off · 24-C-002 · 527 m
    • 1 Hyde Street, Mohill, Leitrim · 20 Apr 2026 · start notice not signed off · 25/60069 · 610 m
    • TAMLAGHTAVALLY, Mohill, Leitrim, N41HK59 · 3 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 1.8 km
    • Main Street, Mohill, Leitrim, No Eircode · 12 Nov 2025 · 7-day notice not signed off · 25/60118 · 618 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 3 Nov 2026, 03:31
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
    Homes coming 14 not started
    • 3Hill Street · 14 homes · not started · runs out 8 Sept 2030 · 613 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 3 Nov 2026, 23:15
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 23:15open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Eivers Lane Childcare Centre (FDC) · Crèche15 Jul 2025 · report · Tusla Early Years Inspectorateapprox. 502 m
    Clooncarne Explorers Childcare LTD · Crèche7 Oct 2025 · report · Tusla Early Years Inspectorateapprox. 502 m
    Eivers Lane Childcare CLG · Crèche17 May 2024 · report · Tusla Early Years Inspectorate822 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area About as busy as most of Leitrim County Council.
    Homes approved
    Here14
    Council middle0
    Homes started
    Here5
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 3 Nov 2026, 23:15
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.03 Nov 2026, 03:31open
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 23:15open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    39% of homes built before 1971 (council 27%). 83% owner-occupied (council 71%).

    Homes built before 1971
    39% · council 27%
    Homes built since 2001
    23% · council 40%
    Owner-occupied
    83% · council 71%
    Rented
    8% · council 23%
    Children under 15
    20% · council 20%
    Aged 65 and over
    23% · council 19%
    Households with 2+ cars
    51% · council 45%
    Work mainly from home
    8% · council 10%
    This small area (290 people)Leitrim

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 117066004/117066002

    Bus
    550 m
    Mohill · NG05
    Nearest school
    527 m
    The Hunt NS, 18 pupils
    Schools, stops and the council

    Schools

    • The Hunt NS · primary · 18 pupils · 527 m
    • Mohill Community College · postprimary · 531 pupils · 826 m
    • Mohill NS · primary · 239 pupils · 903 m

    Stops 5

    • Mohill · NG05 · 550 m
    • Mohill · 464 · 564 m
    • Mohill · 464 · 0/hour at peak · 621 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • The Hunt NS · 527 m-37.9% pupils (18)
    • Mohill Community College · 826 m+12.3% pupils (531)
    • Mohill NS · 903 m+2.6% pupils (239)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 3 Nov 2026, 23:15
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.03 Nov 2026, 23:15open
    Council consultation portalsPublic3 Nov 2026, 01:12open
    Council meetings (ModernGov)Public3 Nov 2026, 02:30open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    2. Application 673 m away open for comments until 10 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Tullybradan
    Electoral division
    Mohill
    Electoral area
    Carrick-On-Shannon
    Council
    Leitrim County Council
    Everything we found, as a list 8 lines
    • Monument zone; no vacant land tax.
    • 1 site nearby could change: 1 approved scheme.
    • 2 applications open for comments nearby; nearest closes 10 Nov 2026.
    • 14 homes approved nearby, not started; largest 14 at Hill Street.
    • No morning-peak service within 500 m; nearest is Mohill, 621 m away (1 a day).
    • Here (2022 census): 83% owner-occupied (council 71%); 26% of homes empty (council 24%); most built 2001–2010; 70% drive to work (council 66%); population up 5% since 2016.
    • The council decides in a median 53 days (about 8 weeks); 36% are asked for more information.
    • 14 applications nearby in the last 12 months; 89% approved (council 96%).
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.03 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public3 Nov 2026
    www2.courts.ie—© the publisher3 Nov 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public3 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.03 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence3 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 4 Nov 2026, 00:05 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.