Planning report · Cavan County Council · 500 m around the house · the last 12 months · 18 Oct 2026, 07:18

Main Street, Ballinagh

53.93097, -7.41010

Homes here mostly date from the 2000s. 4 planning files on this house, the latest from 2025. 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Cavan County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 4 planning files on this house, the latest from 2026.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 4 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BellananaghBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2026: 2558 · extension, approved2018: 18323 · change of use, approved2018: 18266 · change of use, withdrawn or invalid2017: 17253 · signage, approved2017: 1 file on Bellananagh2021: 1 file on Bellananagh2022: 1 file on Bellananagh2023: 1 file on Bellananagh4 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    2558 · extension · approved 2026 · work already done
    approvedstartedsigned off?
  2. 2018
    18323 · change of use · approved 2018 · work already done
    approvedstartedsigned off?
  3. 2018
    18266 · change of use · withdrawn
    approved?started?signed off?
  4. 2017
    17253 · signage · approved 2017 · started, not signed off
    approvedstartedsigned off
On this site
M2
Zoning · Major town centre
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningM2 · Major town centre
What it says

Town Core: To protect and enhance the special physical and social character of the town and village core while providing and/or improving town/village centre facilities.

The main town centre — retail, offices, civic uses, apartments.

cavan county development plan incorporating a local area plan for cavan town 2022 2028 · 11 Jul 2022 – 10 Jul 2028

ZoningM2 · Major town centre
What it says

Town Core: To protect and enhance the special physical and social character of the town and village core while providing and/or improving town/village centre facilities.

The main town centre — retail, offices, civic uses, apartments.

cavan county development plan incorporating variation no1 2022 2028 · 11 Jul 2022 – 10 Jul 2028

Protected building3 within 100 m on the council's record (not republished); on the council's record (not republished)
Heritage inventory3 within 100 m house; house

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Ballinagh (237 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings11St Felim's Roman Catholic Church; surgery/clinic
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 13 on the draft 2027 map; 12 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 12 Oct 2026, 23:31
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA licensed facilities (LEAP)CC BY 4.012 Oct 2026, 23:31open
Records of Protected StructuresNo licence stated · shown as a yes/no only—open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 18 Oct 2026, 02:06
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 80% approved, and 1 in 3 is asked for more information.

New house in a garden or site10 decided · more info asked 30%
80% · council 90%
Approved nearbyCavan overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 10 nearby, 976 council-wide

Figure 3

Bellananagh, file by file since 2017

1 of 1 decided extensions on the road were approved.

4 planning files on Bellananagh since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo number · 2023 · attic conversion / dormer · approved · 2360272Porches, roofs, otherNo number · 2017 · other work · approved · 1713No number · 2021 · other work · refused · 21205No number · 2022 · other work · approved · 22529New house in a side garden
ApprovedRefusedWithdrawn or invalid

4 files with "Bellananagh" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; Appeal window: 4 weeks; Building starts: 158 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 42–56 (n=16)52 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 158 days after permission (n=9)158 days after permissionSigned off22% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated19 decided home extensions, 9 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 1 appealed refusals became permissions.

    Refusals appealed1 decided
    1 became permissions
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Main Street, Ballinagh with 8 numbered planning items
    ⌖ the houseOpen for commentsEmpty land zoned for homesApprovedNo decision yet
    1. 1Main Street, Ballinagh 2660548No decision yet · 72 m
    2. 20.2 ha zoned for homesEmpty land zoned for homes · 58 m
    3. 30.1 ha zoned for homesEmpty land zoned for homes · 127 m
    4. 40.1 ha zoned for homesEmpty land zoned for homes · 141 m
    5. 50.3 ha zoned for homesEmpty land zoned for homes · 218 m
    6. 60.3 ha zoned for homesEmpty land zoned for homes · 227 m
    7. 7Main Street, Ballinagh 2558Approved with conditions · 5 m
    8. 8Fort View, Bellananagh (Ballinagh) 2660399No decision yet · 435 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 23 permissions since 2016, 11 show a start notice and 4 have a completion certificate.

    23 applications lodged within 500 m. Council: 22 approved, 1 refused. After appeals: 23 approved. Of those: 4 signed off, 2 built with the owner's opt-out, 5 started, 5 with no start notice found, 7 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT22: lodged → approved1: lodged → refused22: approved → approved1 refused by the council, approved after an appeal5: approved → no start notice found2: approved → built, owner opted out5: approved → started, not signed off4: approved → signed off7: approved → ran out23 lodged23 lodged22 approved22 approved1 refused1 refused23 approved23 approved5 no start notice found5 no start notice found2 built, owner opted out2 built, owner opted out5 started, not signed off5 started, not signed off4 signed off4 signed off7 ran out7 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured23 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 28 Oct 2026.

    1 deadlines in the next 30 days: 2026-10-28 2660548: application received — to demolish derelict semi-detached dwelling and construct replacement dwelling with vehicular access to rear and associatoday23 Oct28 Oct2 Nov7 Nov12 Nov17 Nov2660548: application received — to demolish derelict semi-detached dwelling and construct replacement dwelling with vehicular access to rear and associa · 72 m away · 2026-10-28
    Comments close
    • Comments close 28 Oct 202610 days left
      12660548 · application received — to demolish derelict semi-detached dwelling and construct replacement dwelling with vehicular…
      €20 to the council · 72 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 5 within 500 m

    Empty land zoned for homes 5

    • 20.2 ha zoned for homes · no homes built on it yet · 58 m
    • 30.1 ha zoned for homes · no homes built on it yet · 127 m
    • 40.1 ha zoned for homes · no homes built on it yet · 141 m
    • 50.3 ha zoned for homes · no homes built on it yet · 218 m
    • 60.3 ha zoned for homes · no homes built on it yet · 227 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
    Figure 8

    Applications within 500 m, by year

    Between 1 and 4 a year; busiest 2018. 96% of decisions were approvals.

    2017: 5, 2018: 4, 2019: 1, 2020: 1, 2021: 3, 2022: 4, 2023: 2, 2025: 305102017: 5 approved5’17*2018: 4 approved4’182019: 1 approved1’192020: 1 approved1’202021: 2 approved2021: 1 refused3’212022: 4 approved4’222023: 2 approved2’232025: 3 approved3’25
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 1Main Street , Ballinagh , Co. Cavan comments close 28 Oct 2026
      to demolish derelict semi-detached dwelling and construct replacement dwelling with vehicular access to rear…
      266054823 Sept 20261 homes72 m
    Every application within 500 m 4 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    Building work nearby 1 in the last 12 months
    1 no sign-off needed
    • Drumlion, Ballinagh, Cavan · 15 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · 2560561 · 464 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 18 Oct 2026, 01:21
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Happy Hours Community Playgroup Ltd · Crèche8 Oct 2024 · report · Tusla Early Years Inspectorate139 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area About as busy as most of Cavan County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here5
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    25% owner-occupied (council 69%).

    Homes built before 1971
    23% · council 25%
    Homes built since 2001
    39% · council 41%
    Owner-occupied
    25% · council 69%
    Rented
    69% · council 24%
    Children under 15
    22% · council 22%
    Aged 65 and over
    10% · council 15%
    Households with 2+ cars
    16% · council 47%
    Work mainly from home
    4% · council 8%
    This small area (304 people)Cavan

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 027012003

    Bus
    95 m
    Ballinagh · 111A, 465, 466 · busiest stop within 500 m: 1 an hour at peak
    Nearest school
    235 m
    S N Beal Atha na nEach, 229 pupils
    Schools, stops and the council

    Schools

    • S N Beal Atha na nEach · primary · 229 pupils · 235 m

    Stops 4

    • Ballinagh · 111A, 465, 466, 65, C2, GM13 · 1/hour at peak · 95 m
    • Ballinagh · 111A, 465, 466, 65, C2 · 1/hour at peak · 128 m
    • St Felim's Church · C2 · 1/hour at peak · 378 m
    • St Felim's Church · C2 · 1/hour at peak · 390 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • S N Beal Atha na nEach · 235 m+0.4% pupils (229)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 18 Oct 2026, 02:18
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    Council consultation portalsPublic18 Oct 2026, 01:37open
    Council meetings (ModernGov)Public18 Oct 2026, 02:18open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Signage (17253) started Nov 2017, never signed off: is it finished?
      Ask for: The completion certificate, or an engineer's opinion of compliance.
      Seller · solicitor
    2. Extension (2558): work kept with permission. Done as approved?
      Ask for: The retention grant and an opinion of compliance.
      Seller · solicitor
    3. Change of use (18323): work kept with permission. Done as approved?
      Ask for: The retention grant and an opinion of compliance.
      Seller · solicitor
    4. Application 72 m away open for comments until 28 Oct 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    5. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Bellananagh
    Electoral division
    Bellananagh
    Electoral area
    Ballyjamesduff
    Council
    Cavan County Council
    Everything we found, as a list 8 lines
    • 1 job on this site started but never signed off as finished.
    • Zoned M2 (major town centre); not protected; no vacant land tax.
    • 5 sites nearby could change: 5 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 28 Oct 2026.
    • Ballinagh (bus 111A, 465) 94 m away: 1 an hour at morning peak; 3 from all stops within 500 m.
    • Here (2022 census): 69% rent (council 24%); 16% of homes empty (council 15%); most built 2001–2010; 48% drive to work (council 65%); population up 6% since 2016.
    • 1 home extension within 250 m since 2025.
    • The council decides in a median 58 days (about 8 weeks); 45% are asked for more information.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.018 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public18 Oct 2026
    www2.courts.ie—© the publisher18 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.012 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public18 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.018 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence18 Oct 2026
    services-eu1.arcgis.comLocal authorities (Record of Protected Structures)No licence stated · flag only—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 18 Oct 2026, 07:18 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.