PlanningRegister.ie
Planning report · Louth County Council · 500 m around the house · the last 12 months · 17 Oct 2026, 11:52

L31617, Dundalk

53.96889, -6.36372

Homes here mostly date from the 1970s. 2 planning files on this house, the latest from 2019. Home extensions nearby almost always get approved (98%). 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Louth County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 46 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992). 2 planning files on this house, the latest from 2019.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of HaggardstownBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2019: 19663 · work already done, approved2019: 19580 · work already done, withdrawn or invalid2017: 2 files on Haggardstown2019: 1 file on Haggardstown2020: 2 files on Haggardstown5 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2019
    19663 · work already done · approved 2019 · started, no sign-off needed
    approvedstartedsigned off?
  2. 2019
    19580 · work already done · withdrawn
    approved?startedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect and enhance the amenity and character of existing residential communities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

louth county development plan · 11 Nov 2021 – 1 Jan 2027

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings9house; Ashville
Monuments2Souterrain; R174293
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 95–96% by type. A new house in a garden is harder: 92% approved, and 71% are asked for more information.

Single-storey rear23 decided · more info asked 17%
96% · council 98%
Attic or dormer19 decided · more info asked 16%
95% · council 93%
New house in a garden or site38 decided · more info asked 71%
92% · council 68%
Approved nearbyLouth overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 80 nearby, 1,785 council-wide

Figure 3

Haggardstown, file by file since 2017

2 of 2 decided extensions on the road were approved.

5 planning files on Haggardstown since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo number · 2017 · other extension · approved · 17784No number · 2020 · other extension · approved · 20724Porches, roofs, otherNo. 51A · 2017 · other work · approved · 17764No number · 2019 · other work · approved · 19183No number · 2020 · other work · approved · 20429New house in a side garden
ApprovedRefusedWithdrawn or invalid

5 files with "Haggardstown" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 6 within 250 m · 0 refused within 100 m

Extensions and refusals near you 6 extensions within 250 m · the last 12 months

4 approved2 no decision or withdrawn
KindAppliedApprovedRefused
Other33—
Single-storey rear21—
Rear10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 46 days. 1 in 5 is asked for more information, which adds about 66 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 46 days; If more info asked (1 in 5): 121 days; Appeal window: 4 weeks; Building starts: 157 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 46 days, middle half 44–50 (n=115)46 daysIf more info asked (1 in 5)With further information: median 121 days (n=30)121 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 157 days after permission (n=54)157 days after permissionSigned off362 days after the start, for the few who file. 70% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated145 decided home extensions, 54 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 8 appealed refusals became permissions. 7 of 20 appealed approvals were reversed.

    Refusals appealed8 decided
    1 became permissions
    Approvals appealed20 decided
    7 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501575 Pending · Main Street , Blackrock , Co.Louth · 443 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher17 Oct 2026, 01:34open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 4

    What's changing around you?

    Street map around L31617, Dundalk with 12 numbered planning items
    ⌖ the houseOpen for commentsBuilding startedApprovedNo decision yetRefused
    1. 1Sandymount House Blackrock, Co. Louth A91 Y9N1 2660679No decision yet · 345 m
    2. 2Rock Road, Blackrock 25180Building started · 182 m
    3. 3Kincora The Rock Road, Blackrock 2660442Approved with conditions · 58 m
    4. 4Cliffcourt, Rock Road East 2660407Approved with conditions · 98 m
    5. 5Rock Road, Blackrock 2660106Approved with conditions · 102 m
    6. 6Hill Cottage, The Crescent 2660063Approved with conditions · 111 m
    7. 7Dunard, Chapel Pass 25180Approved with conditions · 145 m
    8. 8Rock Road, Blackrock 2560732Approved with conditions · 159 m
    9. 9Chapel Pass, Blackrock 2560711Approved with conditions · 269 m
    10. 104 Seaview, Sea Road 2660620No decision yet · 318 m
    11. 11Main Street, Blackrock 2619Approved with conditions · 443 m
    12. 122 Sandy Grove Close, Blackrock 2621Refused · 475 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 101 permissions since 2016, 41 show a start notice and 8 have a completion certificate. Most owners opt out of sign-off.

    107 applications lodged within 500 m. Council: 101 approved, 6 refused. After appeals: 101 approved. Of those: 8 signed off, 26 built with the owner's opt-out, 7 started, 27 with no start notice found, 33 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT101: lodged → approved6: lodged → refused101: approved → approved6: refused → refused27: approved → no start notice found26: approved → built, owner opted out7: approved → started, not signed off8: approved → signed off33: approved → ran out107 lodged107 lodged101 approved101 approved6 refused6 refused101 approved101 approved6 refused6 refused27 no start notice found27 no start notice found26 built, owner opted out26 built, owner opted out7 started, not signed off7 started, not signed off8 signed off8 signed off33 ran out33 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured107 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 5 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-05 2660679: application received — (i) construction of a three-storey residential extension (two-storey over basement level) to the side/north of the dwelltoday22 Oct27 Oct1 Nov6 Nov11 Nov16 Nov2660679: application received — (i) construction of a three-storey residential extension (two-storey over basement level) to the side/north of the dwell · 345 m away · 2026-11-05
    Comments close
    • Comments close 5 Nov 202619 days left
      12660679 · application received — (i) construction of a three-storey residential extension (two-storey over basement level) to the…
      €20 to the council · 345 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Applications within 500 m, by year

    Between 5 and 16 a year; busiest 2019. 94% of decisions were approvals.

    2017: 14, 2018: 15, 2019: 16, 2020: 11, 2021: 9, 2022: 12, 2023: 7, 2024: 13, 2025: 5, 2026: 5051015202017: 14 approved14’17*2018: 15 approved15’182019: 15 approved2019: 1 refused16’192020: 9 approved2020: 2 refused11’202021: 9 approved9’212022: 12 approved12’222023: 7 approved7’232024: 10 approved2024: 3 refused13’242025: 5 approved5’252026: 5 approved5’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 14 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Building work nearby 5 in the last 12 months
    1 not signed off4 no sign-off needed
    • 8 Elm Park, Blackrock, Louth, A91 WK46 · 5 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 22452 · 361 m
    • 2Rock Road, Blackrock, Louth, A91FH90 · 19 Jun 2026 · 1 homes · short notice no sign-off needed · 25180 · 182 m
    • 30 Sandfield Gardens, Blackrock, Louth, A91 C785 · 11 May 2026 · short notice no sign-off needed · 24/60420 · 486 m
    • Rock Road, Blackrock, Louth, a91 wv08 · 23 Feb 2026 · short notice no sign-off needed · 2560711 · 224 m
    • Chapel Road, Blackrock, Louth, A91 T3K6 · 13 Feb 2026 · start notice not signed off · 197 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 17 Oct 2026, 01:09
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Homes coming 0 not started
    • Hamilton · 12 homes · ran out · runs out 9 Jul 2022 · 391 m
    • Hamilton · 12 homes · building started · 404 m
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Happy Dayz Creche · Crèche27 Nov 2023 · report · Tusla Early Years Inspectorate571 m
    Footprints Preschool · Crèche29 Jan 2026 · report · Tusla Early Years Inspectorate593 m
    Liana Lally Preschool · Crèche27 Feb 2025 · report · Tusla Early Years Inspectorate932 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Louth County Council.
    Homes approved
    Here173
    Council middle0
    Homes started
    Here385
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    91% owner-occupied (council 67%).

    Homes built before 1971
    37% · council 28%
    Homes built since 2001
    10% · council 33%
    Owner-occupied
    91% · council 67%
    Rented
    7% · council 28%
    Children under 15
    11% · council 21%
    Aged 65 and over
    40% · council 14%
    Households with 2+ cars
    48% · council 38%
    Work mainly from home
    15% · council 10%
    This small area (227 people)Louth

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 147025017

    Bus
    156 m
    Rock Rd E · 169 · busiest stop within 500 m: 1 an hour at peak
    Nearest school
    602 m
    Scoil na gCreagacha Dubha, 503 pupils
    Schools, stops and the council

    Schools

    • Scoil na gCreagacha Dubha · primary · 503 pupils · 602 m

    Stops 10

    • Rock Rd E · 169 · 1/hour at peak · 156 m
    • Rock Rd E · 169 · 161 m
    • Hamilton Avenue · 169 · 1/hour at peak · 388 m
    • The Square · 169 · 1/hour at peak · 472 m
    • The Square · 169 · 0/hour at peak · 473 m
    • Blackrock · 169 · 1/hour at peak · 582 m
    • Blackrock · 169 · 1/hour at peak · 593 m
    • Sandy Lane · 169 · 1/hour at peak · 671 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Scoil na gCreagacha Dubha · 602 m+6.1% pupils (503)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 17 Oct 2026, 02:12
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Council consultation portalsPublic17 Oct 2026, 01:36open
    Council meetings (ModernGov)Public17 Oct 2026, 02:12open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Work already done (19663): work kept with permission. Done as approved?
      Ask for: The retention grant and an opinion of compliance.
      Seller · solicitor
    2. Application 345 m away open for comments until 5 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Haggardstown
    Electoral division
    Haggardstown
    Electoral area
    Dundalk South
    Council
    Louth County Council
    Everything we found, as a list 8 lines
    • 2 applications on this site; latest 19663, approved 2019, started, no sign-off needed.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • Nothing nearby looks set to change.
    • 1 application open for comments nearby; nearest closes 5 Nov 2026.
    • Rock Rd E (bus 169) 156 m away: 1 an hour at morning peak; 3 from all stops within 500 m.
    • Here (2022 census): 91% owner-occupied (council 67%); 8% of homes empty (council 8%); most built 1971–1980; 61% drive to work (council 59%); population up 34% since 2016.
    • 6 home extensions within 250 m since 2025. Most were single-storey rear extensions.
    • Around here the council decides in a median 51 days (about 7 weeks); 36% are asked for more information.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 26
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.017 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public17 Oct 2026
    www2.courts.ie—© the publisher17 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public17 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.017 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence17 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 17 Oct 2026, 11:52 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.