Planning report · Monaghan County Council · 500 m around the house · the last 12 months · 16 Oct 2026, 11:16

Kingscourt Road, Carrickmacross

53.97145, -6.72019

Homes here mostly date from after 2016. 2 planning files on this house, the latest from 2024. Home extensions nearby almost always get approved (97%).

See on the mapWatch this area

Not held yet for Monaghan County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 2 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built after 2016, with building records online. 2 planning files on this house, the latest from 2024.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2016–2021. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of KilmactrasnaBuilt: most homes in this small area date from 2016–2021 (census estimate)most built2024: 2460169 · demolition, refused2024: 2460163 · demolition, withdrawn or invalid2017: 1 file on Kilmactrasna2019: 1 file on Kilmactrasna2022: 1 file on Kilmactrasna2024: 2 files on Kilmactrasna2025: 1 file on Kilmactrasna2026: 1 file on Kilmactrasna7 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2024
    2460169 · demolition · refused 2024
    approvedstarted?signed off?
  2. 2024
    2460163 · demolition · withdrawn
    approved?started?signed off?
On this site
C6
Zoning · Waterfront
Yes
Protected or listed · inside the zone around a recorded monument (MO031-035005-)
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningC6 · Waterfront
What it says

Existing Commercial: To provide for established commercial development and facilitate its appropriate expansion.

Zoned for waterfront and harbour-related development.

monaghan county development plan 2025 2031 · 7 Jul 2025 – 1 Jul 2031

Heritage inventory1 within 100 m Magheross Graveyard
Monument zoneOn this site Cross - Churchyard cross, Magheross; Graveyard, Magheross

Not on this site: protected building, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Carrickmacross (663 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings27Allied Irish Bank; house
Monuments13House - fortified house; Bawn
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 17 on the draft 2027 map; 16 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Sites and Monuments Record, SMR zones of notification, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 12 Oct 2026, 23:31
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
EPA licensed facilities (LEAP)CC BY 4.012 Oct 2026, 23:31open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 95–100% by type. A new house in a garden is harder: 92% approved, and 1 in 2 are asked for more information.

Single-storey rear11 decided · more info asked 36%
100% · council 99%
Two-storey rear19 decided · more info asked 68%
95% · council 97%
New house in a garden or site13 decided · more info asked 62%
92% · council 93%
Approved nearbyMonaghan overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 43 nearby, 1,651 council-wide

Figure 3

Kilmactrasna, file by file since 2017

2 of 2 decided extensions on the road were approved. New houses in side gardens or on sites: 0 of 1.

7 planning files on Kilmactrasna since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo number · 2019 · single-storey rear · approved · 19352No number · 2024 · single-storey side · approved · 2460216Porches, roofs, otherNo number · 2017 · new house · approved · 17458No number · 2022 · other work · approved · 22113No number · 2025 · other work · approved · 2560144No. 84 · 2026 · other work · approved · 2660028New house in a side gardenNo number · 2024 · new house · refused · 2460169
ApprovedRefusedWithdrawn or invalid

7 files with "Kilmactrasna" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Dormer or attic11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 2 is asked for more information, which adds about 67 days. Building starts about 2 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 2): 130 days; Appeal window: 4 weeks; Building starts: 72 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 50–55 (n=38)52 daysIf more info asked (1 in 2)With further information: median 130 days (n=34)130 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 72 days after permission (n=28)72 days after permissionSigned off192 days after the start, for the few who file. 57% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated72 decided home extensions, 28 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 1 appealed refusals became permissions. 0 of 3 appealed approvals were reversed.

    Refusals appealed1 decided
    0 became permissions
    Approvals appealed3 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Kingscourt Road, Carrickmacross with 10 numbered planning items
    ⌖ the houseEmpty land zoned for homesBuilding startedApproved
    1. 11.4 ha zoned for homesEmpty land zoned for homes · 160 m
    2. 21.1 ha zoned for homesEmpty land zoned for homes · 163 m
    3. 319 Riverside Road, Carraig Mhachaire Rois 2560408Building started · 175 m
    4. 40.9 ha zoned for homesEmpty land zoned for homes · 185 m
    5. 52.8 ha zoned for homesEmpty land zoned for homes · 220 m
    6. 60.8 ha zoned for homesEmpty land zoned for homes · 222 m
    7. 73.8 ha zoned for homesEmpty land zoned for homes · 320 m
    8. 8Kingscourt Road, Mullanarry 2660072Approved with conditions · 137 m
    9. 9St Louis Secondary School, Carrickmacross 2660135Approved with conditions · 184 m
    10. 1026 Emmett Street, Carrickmacross 2560515Approved with conditions · 465 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 56 permissions since 2016, 20 show a start notice and 10 have a completion certificate.

    57 applications lodged within 500 m. Council: 56 approved, 1 refused. After appeals: 56 approved. Of those: 10 signed off, 6 built with the owner's opt-out, 4 started, 22 with no start notice found, 14 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT56: lodged → approved1: lodged → refused56: approved → approved1: refused → refused22: approved → no start notice found6: approved → built, owner opted out4: approved → started, not signed off10: approved → signed off14: approved → ran out57 lodged57 lodged56 approved56 approved1 refused1 refused56 approved56 approved1 refused1 refused22 no start notice found22 no start notice found6 built, owner opted out6 built, owner opted out4 started, not signed off4 started, not signed off10 signed off10 signed off14 ran out14 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured57 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 10 within 500 m

      Empty land zoned for homes 10

      • 11.4 ha zoned for homes · no homes built on it yet · 160 m
      • 21.1 ha zoned for homes · no homes built on it yet · 163 m
      • 40.9 ha zoned for homes · no homes built on it yet · 185 m
      • 52.8 ha zoned for homes · no homes built on it yet · 220 m
      • 60.8 ha zoned for homes · no homes built on it yet · 222 m
      • 73.8 ha zoned for homes · no homes built on it yet · 320 m
      • 0.4 ha zoned for homes · no homes built on it yet · 383 m
      • 1.1 ha zoned for homes · no homes built on it yet · 400 m
      • 1.6 ha zoned for homes · no homes built on it yet · 429 m
      • 0.2 ha zoned for homes · no homes built on it yet · 448 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 16 Oct 2026, 02:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
      Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
      Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
      National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
      Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
      Figure 8

      Applications within 500 m, by year

      Between 1 and 10 a year; busiest 2023. 98% of decisions were approvals.

      2017: 8, 2018: 5, 2019: 7, 2020: 1, 2021: 6, 2022: 9, 2023: 10, 2024: 5, 2025: 4, 2026: 205102017: 8 approved8’17*2018: 5 approved5’182019: 7 approved7’192020: 1 approved1’202021: 6 approved6’212022: 9 approved9’222023: 10 approved10’232024: 4 approved2024: 1 refused5’242025: 4 approved4’252026: 2 approved2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 3 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 16 Oct 2026, 02:04
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
      Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
      Building work nearby 6 in the last 12 months
      4 not signed off2 no sign-off needed
      • 319 Riverside Road, Carraig Mhachaire Rois, Monaghan · 8 Sept 2026 · 1 homes · short notice no sign-off needed · 2560408 · 175 m
      • 66 Woodvale, Carrickmacross, Monaghan · 21 Aug 2026 · 71 homes · start notice not signed off · 25/60144 · 379 m
      • 26 Emmet Street, Monaghan, A81 NF72 · 13 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2560515 · 464 m
      • Castle Street, Carrickmacross, Monaghan, A81 YW23 · 27 Apr 2026 · start notice not signed off · 2460406 · 272 m
      • Ardee Road, Carrickmacross, Monaghan · 10 Apr 2026 · 7-day notice not signed off · 18.EL.2050 · 444 m
      • Ardee Road, Carrickmacross, Monaghan · 10 Apr 2026 · 7-day notice not signed off · 18.EL.2050 · 444 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 16 Oct 2026, 00:56
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
      Homes coming 0 not started
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 16 Oct 2026, 02:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
      Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
      National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
      Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Respond Early Years Service, Carrickmacross · Crèche3 Sept 2024 · report · Tusla Early Years Inspectorate528 m
      Carrickmacross Preschool Playgroup · Crèche14 Oct 2025 · report · Tusla Early Years Inspectorate699 m
      Carrickmacross Childcare Ltd · Crèche13 May 2025 · report · Tusla Early Years Inspectorate828 m
      Daisy Chain Childcare · Crèche15 Jan 2025 · report · Tusla Early Years Inspectorate941 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register14 Oct 2026, 23:20open
      How busy is this area Busier than most of Monaghan County Council.
      Homes approved
      Here88
      Council middle0
      Homes started
      Here127
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
      Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
      National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      24% owner-occupied (council 71%).

      Homes built before 1971
      27% · council 28%
      Homes built since 2001
      52% · council 33%
      Owner-occupied
      24% · council 71%
      Rented
      62% · council 24%
      Children under 15
      29% · council 22%
      Aged 65 and over
      7% · council 16%
      Households with 2+ cars
      28% · council 48%
      Work mainly from home
      5% · council 7%
      This small area (404 people)Monaghan

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 177017001

      Bus
      297 m
      Civic Offices · 171 · busiest stop within 500 m: 3 an hour at peak
      Nearest school
      297 m
      St Louis Secondary School, 414 pupils
      Schools, stops and the council

      Schools

      • St Louis Secondary School · postprimary · 414 pupils · 297 m
      • St Joseph's National School · primary · 234 pupils · 578 m
      • Bunscoil Louis Naofa · primary · 258 pupils · 776 m
      • Scoil Rois · primary · 260 pupils · 858 m

      Stops 6

      • Civic Offices · 171 · 0/hour at peak · 297 m
      • Civic Offices · 171 · 0/hour at peak · 302 m
      • Carrickmacross · 170, 171, 180, 182, 980, 980A · 1/hour at peak · 469 m
      • Carrickmacross · 170, 171, 182, 980, 980A, 980B · 3/hour at peak · 489 m
      • Workhouse · 171 · 0/hour at peak · 792 m
      • Workhouse · 171 · 1/hour at peak · 797 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • St Louis Secondary School · 297 m+1.2% pupils (414) · 2 classrooms 2026, approved with conditions
      • St Joseph's National School · 578 m-1.7% pupils (234)
      • Bunscoil Louis Naofa · 776 m-3.4% pupils (258)
      • Scoil Rois · 858 m+0.8% pupils (260)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 16 Oct 2026, 02:04
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
      Council consultation portalsPublic16 Oct 2026, 01:34open
      Council meetings (ModernGov)Public16 Oct 2026, 01:42open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Demolition (2460169) refused 2024: built anyway?
        Ask for: The seller's answer and your surveyor's check.
        Seller · solicitor
      2. Next to a recorded monument: does digging need notice?
        Ask for: Details of past works from the seller.
        Seller · council
      3. Zoned C6 (waterfront), not for homes: could you extend?
        Ask for: A solicitor's or planner's view.
        Solicitor · planner
      4. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Kilmactrasna
      Electoral division
      Carrickmacross Urban
      Electoral area
      Carrickmacross-Castleblayney
      Council
      Monaghan County Council
      Everything we found, as a list 8 lines
      • 2 applications on this site; latest 2460169, refused 2024.
      • Zoned C6 (waterfront); monument zone; no vacant land tax.
      • 10 sites nearby could change: 10 empty zoned plots.
      • Carrickmacross (bus 170, 171) 489 m away: 3 an hour at morning peak; 5 from all stops within 500 m.
      • Here (2022 census): 62% rent (council 24%); 11% of homes empty (council 12%); most built 2016 or later; 54% drive to work (council 66%); population up 12% since 2016.
      • 1 home extension within 250 m since 2026.
      • The council decides in a median 97 days (about 14 weeks); 63% are asked for more information.
      • Homes started within 1 km: 101 in the last year, 35 three years before.
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 28
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.09 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.015 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public16 Oct 2026
      www2.courts.ie—© the publisher16 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.012 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public16 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.016 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence16 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 16 Oct 2026, 11:16 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.