Planning report · Monaghan County Council · 2000 m around the house · the last 12 months · 16 Oct 2026, 05:09

Shercock Road

53.98345, -6.74796

Homes here mostly date from the 1970s. 56 homes approved 1.8 km away haven't started.

See on the mapWatch this area

Not held yet for Monaghan County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of LurgansBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2019: 1 file on Lurgans2020: 1 file on Lurgans2022: 1 file on Lurgans2025: 1 file on Lurgans4 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings22Derryolam House; Carrickmacross Union Workhouse
Monuments50Ringfort - rath
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 20 on the draft 2027 map; 18 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 100% approved, and 80% are asked for more information.

New house in a garden or site10 decided · more info asked 80%
100% · council 93%
Approved nearbyMonaghan overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 10 nearby, 1,384 council-wide

Figure 3

Lurgans, file by file since 2019

New houses in side gardens or on sites: 1 of 1.

4 planning files on Lurgans since 2019, by kind and decision.20192020202120222023202420252026Extensions, atticsPorches, roofs, otherNo number · 2019 · other work · approved · 19478No number · 2020 · other work · approved · 20182No number · 2025 · other work · approved · 2560199New house in a side gardenNo number · 2022 · new house · approved · 22407
ApprovedRefusedWithdrawn or invalid

4 files with "Lurgans" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2019–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days.

    Comments open: 5 weeks · €20; Council decision: 52 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 50–60 (n=8)52 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off80% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated13 decided home extensions, 5 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 2 appealed approvals were reversed.

    Approvals appealed2 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months
    • 501496 Pending · Parnell Street, Drummond Etra, Carrickmacross, Co. Monaghan. · 2.0 km
    • 500548 Granted · Cloghvally Lower, Carrickmacross, Co. Monaghan. · 1.7 km
    • 500585 Granted with conditions · Lurgans , Carrickmacross , Co. Monaghan · 1.2 km
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Courts Service legal diary (judicial reviews)© the publisher16 Oct 2026, 01:34open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 4

    What's changing around you?

    Street map around Shercock Road with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedEmpty land zoned for homesApproved
    1. 1Mullanarry, Carrickmacross 2660426No decision yet · 1.4 km
    2. 2Corrinshigagh Carrickmaclim, Carrickmacross 2660415No decision yet · 1.7 km
    3. 34 Parnell Street, Drummond Etra 2660033Approved with conditions · 2.0 km
    4. 4Lurgans 2560176Approved, no sign building has started · 1.2 km
    5. 5Cloghvally Lower 2560303Approved, no sign building has started · 1.8 km
    6. 6Cloghvally Upper/Lower 2460457Approved, no sign building has started · 1.9 km
    7. 73.3 ha zoned for homesEmpty land zoned for homes · 1.3 km
    8. 82.3 ha zoned for homesEmpty land zoned for homes · 1.7 km
    9. 91.0 ha zoned for homesEmpty land zoned for homes · 1.7 km
    10. 101.2 ha zoned for homesEmpty land zoned for homes · 1.9 km
    11. 110.1 ha zoned for homesEmpty land zoned for homes · 1.9 km
    12. 120.2 ha zoned for homesEmpty land zoned for homes · 1.9 km
    13. 13Aghalile, Carrickmacross 2593Approved with conditions · 316 m
    14. 14Aghalile, Carrickmacross 2660265Approved with conditions · 316 m
    15. 15Dunoge, Carrickmacross 2660247Approved with conditions · 800 m
    Figure 6

    The next 30 days

    3 deadlines within 2.0 km; the first closes 29 Oct 2026.

    3 deadlines in the next 30 days: 2026-10-29 2660415: application received — permission for the development consisting of a one storey extension to the rear of an existing cottage, and all associat; 2026-11-04 2660426: application received — permission to replace existing derelict shed with 2-storey 2-bedroom dwelling, re-open former entrance and connect to ex; 2026-11-09 2660033: CONDITIONAL — permission for change of use from existing retail unit to proposed café, demolition of existing recessed shopfront entratoday21 Oct26 Oct31 Oct5 Nov10 Nov15 Nov2660415: application received — permission for the development consisting of a one storey extension to the rear of an existing cottage, and all associat · 1.7 km away · 2026-10-292660426: application received — permission to replace existing derelict shed with 2-storey 2-bedroom dwelling, re-open former entrance and connect to ex · 1.4 km away · 2026-11-042660033: CONDITIONAL — permission for change of use from existing retail unit to proposed café, demolition of existing recessed shopfront entra · 2 km away · 2026-11-09
    Comments closeTime to appeal ends
    • Comments close 29 Oct 202613 days left
      22660415 · application received — permission for the development consisting of a one storey extension to the rear of an existing…
      €20 to the council · 1.7 km away
    • Comments close 4 Nov 202619 days left
      12660426 · application received — permission to replace existing derelict shed with 2-storey 2-bedroom dwelling, re-open former…
      €20 to the council · 1.4 km away
    • Time to appeal ends 9 Nov 202624 days left
      32660033 · CONDITIONAL — permission for change of use from existing retail unit to proposed café, demolition of existing recessed…
      €220 to An Coimisiún Pleanála (€110 observer) · 2.0 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    56 homes 1.8 km away were approved Dec 2025 with no start notice yet; the permission runs to May 2031.

    Cloghvally Lower · 56 homes: 56 homes approved Dec 2025, not started; Cloghvally Upper/Lower · 38 homes: 38 homes approved Jun 2025, not started; Lurgans · 20 homes: 20 homes approved Dec 2025, not started202420252026202720282029203020312032Cloghvally Lower · 56 homes1.8 km · 256030356 homes approved Dec 2025, not started56 homes approved Dec 2025, not startedCloghvally Upper/Lower · 38 homes1.9 km · 246045738 homes approved Jun 2025, not started38 homes approved Jun 2025, not startedLurgans · 20 homes1.2 km · 256017620 homes approved Dec 2025, not started20 homes approved Dec 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 10 within 2.0 km

    Approved, not started 3

    Empty land zoned for homes 7

    • 73.3 ha zoned for homes · no homes built on it yet · 1.3 km
    • 82.3 ha zoned for homes · no homes built on it yet · 1.7 km
    • 91.0 ha zoned for homes · no homes built on it yet · 1.7 km
    • 101.2 ha zoned for homes · no homes built on it yet · 1.9 km
    • 110.1 ha zoned for homes · no homes built on it yet · 1.9 km
    • 120.2 ha zoned for homes · no homes built on it yet · 1.9 km
    • 0.2 ha zoned for homes · no homes built on it yet · 2.0 km

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
    Figure 8

    Applications within 500 m, by year

    Between 1 and 2 a year; busiest 2022. 100% of decisions were approvals.

    2020: 2, 2022: 2, 2023: 1, 2025: 2, 2026: 105102020: 2 approved2’20*2022: 2 approved2’222023: 1 approved1’232025: 2 approved2’252026: 1 approved1’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2020 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 17 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Building work nearby 7 in the last 12 months
    5 not signed off2 no sign-off needed
    • ross road, Carraig Mhachaire Rois, Monaghan · 27 Aug 2026 · 7-day notice not signed off · 2560348 · 1.8 km
    • Ballybay Road, Carrickmacross, Monaghan · 29 Jun 2026 · 43 homes · start notice not signed off · 2560311 · 1.8 km
    • Shercock Road, Carrickmacross, Monaghan · 7 May 2026 · 5 homes · start notice not signed off · 24/60415 · 1.3 km
    • Dunoge, Carrickmacross, Monaghan · 5 May 2026 · 1 homes · start notice, opted out no sign-off needed · 2560436 · 1.2 km
    • Beagh, Carrickmacross, Monaghan · 6 Apr 2026 · 1 homes · start notice not signed off · 2560398 · 1.6 km
    • Derrylavan, Carrickmacross, Monaghan · 18 Mar 2026 · start notice not signed off · 23/21 · 1.8 km
    • Shercock Road, Carrickmacross, Monaghan, A81 A403 · 23 Feb 2026 · short notice no sign-off needed · 24/60415 · 1.3 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 16 Oct 2026, 00:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Homes coming 114 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Dunogue Montessori · Crèche29 Sept 2025 · report · Tusla Early Years Inspectorateapprox. 517 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area About as busy as most of Monaghan County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here2
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    93% owner-occupied (council 71%).

    Homes built before 1971
    22% · council 28%
    Homes built since 2001
    30% · council 33%
    Owner-occupied
    93% · council 71%
    Rented
    3% · council 24%
    Children under 15
    23% · council 22%
    Aged 65 and over
    19% · council 16%
    Households with 2+ cars
    68% · council 48%
    Work mainly from home
    7% · council 7%
    This small area (574 people)Monaghan

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 177016004

    Schools, stops and the council

    Schools

    None nearby.

      Stops 2

        Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 16 Oct 2026, 01:42
        SourceLicenceFetchedLink
        Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
        Department of Education school listCC BY 4.027 Sept 2026, 23:32open
        Council consultation portalsPublic16 Oct 2026, 01:34open
        Council meetings (ModernGov)Public16 Oct 2026, 01:42open
        Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. Application 1.4 km away open for comments until 4 Nov 2026: comment?
          Ask for: The plans on the council's website (€20 to comment).
          Council
        2. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Lurgans
        Electoral division
        Carrickmacross Rural
        Electoral area
        Carrickmacross-Castleblayney
        Council
        Monaghan County Council
        Everything we found, as a list 8 lines
        • No vacant land tax.
        • 10 sites nearby could change: 3 approved schemes, 7 empty zoned plots.
        • 2 applications open for comments nearby; nearest closes 4 Nov 2026.
        • 114 homes approved nearby, not started; largest 56 at Cloghvally Lower.
        • No scheduled public transport within 800 m.
        • Here (2022 census): 93% owner-occupied (council 71%); 10% of homes empty (council 12%); most built 1971–1980; 72% drive to work (council 66%); population up 10% since 2016.
        • Around here the council decides in a median 111 days (about 16 weeks); 70% are asked for more information.
        • 17 applications nearby in the last 12 months; 100% approved (council 93%).
        What the terms mean 7 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
        • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
        • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 26
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.09 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.015 Oct 2026
        data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
        services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
        dlrcoco.citizenspace.comLocal authorities (consultation portals)Public16 Oct 2026
        www2.courts.ie—© the publisher16 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
        transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
        lda.ieLand Development AgencyCC BY 4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)Public16 Oct 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.016 Oct 2026
        services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence16 Oct 2026
        services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
        gov.ieDepartment of EducationCC BY 4.027 Sept 2026
        gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
        tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 16 Oct 2026, 05:09 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.