Planning report · Louth County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 14:30

L20064

54.00766, -6.40704

Homes here mostly date from 1919–1945. Home extensions nearby almost always get approved (99%). 14 homes approved 255 m away haven't started.

See on the mapWatch this area

Not held yet for Louth County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 48 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of DemesneBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2023: 2 files on Demesne2024: 1 file on Demesne3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect and enhance the amenity and character of existing residential communities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

louth county development plan · 11 Nov 2021 – 1 Jan 2027

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Diageo Ireland Limited t/a The Great Northern Brewery (588 m); Great Northern Distillery Ltd (796 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings42shop/retail outlet; Dundalk House
Monuments20Souterrain; Historic town
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 95–100% by type. A new house in a garden is harder: 100% approved, and 80% are asked for more information.

Single-storey rear33 decided · more info asked 18%
100% · council 98%
Two-storey rear22 decided · more info asked 14%
95% · council 93%
Attic or dormer27 decided · more info asked 30%
100% · council 92%
First-floor18 decided · more info asked 33%
100% · council 95%
New house in a garden or site10 decided · more info asked 80%
100% · council 58%
Approved nearbyLouth overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 110 nearby, 1,268 council-wide

Figure 3

Demesne, file by file since 2023

3 planning files on Demesne since 2023, by kind and decision.2023202420252026Extensions, atticsPorches, roofs, otherNo. 14 · 2023 · other work · approved · 23127No number · 2023 · other work · approved · 23465No number · 2024 · other work · approved · 2460233New house in a side garden
ApprovedRefusedWithdrawn or invalid

3 files with "Demesne" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2023–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 approved
KindAppliedApprovedRefused
Single-storey side11—
Two-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 48 days. 1 in 4 is asked for more information, which adds about 76 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 48 days; If more info asked (1 in 4): 125 days; Appeal window: 4 weeks; Building starts: 154 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 48 days, middle half 44–50 (n=119)48 daysIf more info asked (1 in 4)With further information: median 125 days (n=42)125 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 154 days after permission (n=45)154 days after permissionSigned off58% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated161 decided home extensions, 45 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    7 of 10 appealed refusals became permissions. 1 of 8 appealed approvals were reversed.

    Refusals appealed10 decided
    7 became permissions
    Approvals appealed8 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around L20064 with 15 numbered planning items
    ⌖ the houseWindow closingApproved, not startedBuilding startedApprovedNo decision yet
    1. 12 to 6 Yorke Street, Dundalk 2660240Approved with conditions · 356 m
    2. 257 Clanbrassil Street 2360103Approved, no sign building has started · 255 m
    3. 3Former Carroll's village shopping centre, Carroll’s Village 2560845Building started · 132 m
    4. 4The Long Walk, Dundalk 22921Building started · 143 m
    5. 5Carroll’s Village Shopping Centre, Carroll’s Village Long Walk 2560845Approved with conditions · 125 m
    6. 6Carroll’s Village Shopping Centre, Carroll’s Village Long Walk 2660244Approved with conditions · 141 m
    7. 705 Oliver Plunkett Park, Dundalk 2660394Approved with conditions · 181 m
    8. 865 McSwiney Street, Dundalk 2560818Approved with conditions · 190 m
    9. 9St. Peter's, 3 Demesne Road Dundalk 2660391Approved with conditions · 227 m
    10. 102 Oriel Terrace, Demesne Road 2660306Approved with conditions · 230 m
    11. 1175 Clanbrassil Street, Dundalk 2660317No decision yet · 290 m
    12. 1258 Clanbrassil Street, Dundalk 2660397No decision yet · 292 m
    13. 13Bank of Ireland, 80 Clanbrassil Street 2660287Approved with conditions · 301 m
    14. 1475 O'Hanlon Park, Dundalk 2560780Approved with conditions · 301 m
    15. 15The Bodhran, 84 Bridge Street 2660088Approved with conditions · 306 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 77 permissions since 2016, 16 show a start notice and 3 have a completion certificate.

    83 applications lodged within 500 m. Council: 75 approved, 8 refused. After appeals: 77 approved. Of those: 3 signed off, 6 built with the owner's opt-out, 7 started, 54 with no start notice found, 7 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT75: lodged → approved8: lodged → refused75: approved → approved6: refused → refused2 refused by the council, approved after an appeal54: approved → no start notice found6: approved → built, owner opted out7: approved → started, not signed off3: approved → signed off7: approved → ran out83 lodged83 lodged75 approved75 approved8 refused8 refused77 approved77 approved6 refused6 refused54 no start notice found54 no start notice found6 built, owner opted out6 built, owner opted out7 started, not signed off7 started, not signed off3 signed off3 signed off7 ran out7 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured83 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 6 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-06 2660240: CONDITIONAL — Retention and Permission for: 1. The demolition of houses Nos 2, 3 and 4. 2. The partial demolition of houses 5 and 6.today6 Nov11 Nov16 Nov21 Nov26 Nov1 Dec2660240: CONDITIONAL — Retention and Permission for: 1. The demolition of houses Nos 2, 3 and 4. 2. The partial demolition of houses 5 and 6. · 356 m away · 2026-11-06
    Time to appeal ends
    • Time to appeal ends 6 Nov 20265 days left
      12660240 · CONDITIONAL — Retention and Permission for: 1. The demolition of houses Nos 2, 3 and 4. 2. The partial demolition of…
      €220 to An Coimisiún Pleanála (€110 observer) · 356 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    14 homes 255 m away were approved Jan 2024 with no start notice yet; the permission runs to Jan 2029.

    57 Clanbrassil Street · 14 homes: 14 homes approved Jan 2024, not started20242025202620272028202957 Clanbrassil Street · 14 homes255 m · 236010314 homes approved Jan 2024, not started14 homes approved Jan 2024, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 1 within 500 m

    Approved, not started 1

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 12 and 20 a year; busiest 2025. 90% of decisions were approvals.

    2021: 14, 2022: 13, 2023: 12, 2024: 12, 2025: 20, 2026: 12051015202021: 12 approved2021: 2 refused14’21*2022: 12 approved2022: 1 refused13’222023: 10 approved2023: 2 refused12’232024: 10 approved2024: 2 refused12’242025: 19 approved2025: 1 refused20’252026: 12 approved12’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 22 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 11 in the last 12 months
    1 signed off as finished5 not signed off5 no sign-off needed
    • 3Former Carroll's village shopping centre, Carroll’s Village, Long Walk,, Dundalk, Louth, A91 X3AX · 4 Sept 2026 · 7-day notice not signed off · 2560845 · 132 m
    • 4The Long Walk, Dundalk, Louth · 30 Jul 2026 · start notice not signed off · 22921 · 143 m
    • 2/3 The Demesne, Dundalk, Louth, A91 VP71 · 28 Jul 2026 · 7-day notice signed off · 483 m
    • 17 Park Villas, Dundalk, Louth · 29 Jun 2026 · short notice no sign-off needed · 2560560 · 470 m
    • 5 Bridge Street, Dundalk, Louth, A91 NC58 · 18 May 2026 · 3 homes · 7-day notice not signed off · 382 m
    • Philip Street, Dundalk, Louth · 16 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 2560199 · 237 m
    • 17 Park Villas, Dundalk, Louth, A91 W8Y8 · 23 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 2560560 · 459 m
    • 01 Emer Terrace, Dundalk, Louth, A91 X5W9 · 11 Mar 2026 · start notice not signed off · 2560628 · 465 m
    • 68 Father Murray Park, Dundalk, Louth, A91 T0X2 · 4 Mar 2026 · 1 homes · short notice no sign-off needed · 474 m
    • 63 Clanbrassil Street, Dundalk, Louth, A91 V2XE · 10 Dec 2025 · 7-day notice not signed off · 2460299 · 305 m
    • 3 Park Drive, Dundalk, Louth, A91 F8Y2 · 12 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · 2560188 · 336 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 14 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Dun Dealgan Childcare · Crèche20 May 2025 · report · Tusla Early Years Inspectorate114 m
    De La Salle Pre- School · Crèche19 Apr 2024 · report · Tusla Early Years Inspectorate302 m
    Castletown Girls Preschool · Crèche18 Nov 2024 · report · Tusla Early Years Inspectorate367 m
    CBS pre-school · Crèche29 Sept 2025 · report · Tusla Early Years Inspectorate594 m
    ABC Childsplay Creche · Crèche24 Apr 2026 · report · Tusla Early Years Inspectorateapprox. 623 m
    St. Nicholas N.S. Pre- School · Crèche10 Sept 2025 · report · Tusla Early Years Inspectorate655 m
    St. Malachy's Pre- School · Crèche3 Sept 2025 · report · Tusla Early Years Inspectorate763 m
    Stepping Stones · Crèche31 Mar 2026 · report · Tusla Early Years Inspectorate763 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Louth County Council.
    Homes approved
    Here51
    Council middle0
    Homes started
    Here68
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    80% of homes built before 1971 (council 28%). 63% owner-occupied (council 67%).

    Homes built before 1971
    80% · council 28%
    Homes built since 2001
    10% · council 33%
    Owner-occupied
    63% · council 67%
    Rented
    26% · council 28%
    Children under 15
    9% · council 21%
    Aged 65 and over
    26% · council 14%
    Households with 2+ cars
    8% · council 38%
    Work mainly from home
    7% · council 10%
    This small area (159 people)Louth

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 147040008

    Bus
    323 m
    Dundalk Bus Stn · 100, 100X, 160 · busiest stop within 500 m: 10 an hour at peak
    Nearest school
    302 m
    St Nicholas Monastery NS, 164 pupils
    Schools, stops and the council

    Schools

    • St Nicholas Monastery NS · primary · 164 pupils · 302 m
    • Castletown Rd Convent · primary · 191 pupils · 367 m
    • Colaiste Rís · postprimary · 616 pupils · 425 m
    • C.B.S. Primary · primary · 524 pupils · 494 m
    • S N San Nioclas · primary · 148 pupils · 551 m
    • S N An Tslanaitheora C · primary · 160 pupils · 563 m
    • S N An Tslanaitheora B · primary · 169 pupils · 563 m
    • St Mary's College · postprimary · 916 pupils · 621 m

    Stops 27

    • Dundalk Bus Stn · 100, 100X, 160, 161, 162, 167 · 10/hour at peak · 323 m
    • Árd Easmuinn · 174A · 2/hour at peak · 470 m
    • Legion Avenue · 174A · 2/hour at peak · 489 m
    • Legion Avenue · 174A · 2/hour at peak · 577 m
    • Redeemer Ch · 174A · 2/hour at peak · 623 m
    • Dundalk · 916, 918 · 4/hour at peak · 634 m
    • Roden Place · 169, 917 · 2/hour at peak · 636 m
    • Park Street · 100, 168, 170, 171, 174, 174B · 7/hour at peak · 643 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Nicholas Monastery NS · 302 m+2.5% pupils (164)
    • Castletown Rd Convent · 367 m+3.2% pupils (191)
    • Colaiste Rís · 425 m-1% pupils (616)
    • C.B.S. Primary · 494 m+6.3% pupils (524)
    • S N San Nioclas · 551 m-8.1% pupils (148)
    • S N An Tslanaitheora B · 563 m+1.8% pupils (169)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Demesne
    Electoral division
    Dundalk No. 1 Urban
    Electoral area
    Dundalk-Carlingford
    Council
    Louth County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 1 site nearby could change: 1 approved scheme.
    • 14 homes approved nearby, not started; largest 14 at 57 Clanbrassil Street.
    • Dundalk Bus Stn (bus 100, 100X) 323 m away: 10 an hour at morning peak; 14 from all stops within 500 m.
    • Here (2022 census): 63% owner-occupied (council 67%); 8% of homes empty (council 8%); most built 1919–1945; 46% drive to work (council 59%); population up 9% since 2016.
    • 2 home extensions within 250 m since 2026.
    • The council decides in a median 52 days (about 7 weeks); 39% are asked for more information.
    • Homes started within 1 km: 27 in the last year, 217 three years before.
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 14:30 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.