PlanningRegister.ie
Planning report · Cavan County Council · 500 m around the house · the last 12 months · 19 Oct 2026, 18:56

Oakwood Lane

54.04435, -7.32428

Homes here mostly date from the 2000s. 1 planning file on this house, the latest from 2021. 16 homes approved 374 m away haven't started.

See on the mapWatch this area

Not held yet for Cavan County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 8 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 1 planning file on this house, the latest from 2021.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of TownparksBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 21148 · attic or dormer, approved2017: 2 files on Townparks2018: 3 files on Townparks2019: 2 files on Townparks2020: 5 files on Townparks2021: 4 files on Townparks2022: 6 files on Townparks2023: 1 file on Townparks2024: 1 file on Townparks2025: 1 file on Townparks2026: 2 files on Townparks27 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    21148 · attic or dormer · approved 2021 · started, no sign-off needed
    approvedstartedsigned off?
On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings1St Mary's Roman Catholic Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 80% by type. A new house in a garden is harder: 100% approved, and 1 in 2 are asked for more information.

Attic or dormer10 decided · more info asked 30%
80% · council 95%
New house in a garden or site5 decided · more info asked 60%
100% · council 90%
Approved nearbyCavan overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 15 nearby, 1,352 council-wide

Figure 3

Townparks, file by file since 2017

14 of 14 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

27 planning files on Townparks since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo number · 2017 · single-storey rear · approved · 17229No number · 2017 · other extension · approved · 17403No number · 2018 · other extension · approved · 18334No. 15 · 2019 · other extension · approved · 1994No number · 2020 · two-storey rear · approved · 20437No number · 2020 · single-storey rear · approved · 2065No number · 2021 · attic conversion / dormer · approved · 21148No number · 2021 · single-storey side · approved · 2129No number · 2021 · first-floor · approved · 21767No number · 2022 · other extension · approved · 22114No. 6 · 2022 · garage conversion · approved · 2218No number · 2022 · attic conversion / dormer · approved · 22485No number · 2022 · attic conversion / dormer · approved · 22528No number · 2026 · attic conversion / dormer · approved · 2660234Porches, roofs, otherNo number · 2018 · other work · approved · 18343No number · 2019 · other work · approved · 19459No number · 2020 · other work · refused · 20469No number · 2020 · other work · approved · 2091No number · 2021 · other work · approved · 21110No number · 2022 · other work · approved · 22484No number · 2022 · other work · approved · 2267No number · 2023 · other work · refused · 2360235No number · 2024 · other work · approved · 2460162No number · 2025 · other work · approved · 2560627No number · 2026 · other work · approved · 2660464New house in a side gardenNo number · 2018 · new house · approved · 18375No number · 2020 · new house · approved · 20296
ApprovedRefusedWithdrawn or invalid

27 files with "Townparks" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Dormer or attic11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 50 days. Building starts about 8 months after permission.

    Comments open: 5 weeks · €20; Council decision: 50 days; Appeal window: 4 weeks; Building starts: 252 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 48–55 (n=24)50 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 252 days after permission (n=13)252 days after permissionSigned off407 days after the start, for the few who file. 23% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated29 decided home extensions, 13 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    2 of 3 appealed refusals became permissions. 0 of 2 appealed approvals were reversed.

    Refusals appealed3 decided
    2 became permissions
    Approvals appealed2 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Oakwood Lane with 6 numbered planning items
    ⌖ the houseWindow closingApproved, not startedLarge schemeApproved
    1. 1Oakwood Lane, Ballyhaise 2660447Approved with conditions · 95 m
    2. 2St. Mary’s National School, Townparks 2660464Approved with conditions · 238 m
    3. 3Church View 2560453Approved, no sign building has started · 374 m
    4. 4Site located to the north of Oakwood Lane, Townparks Ballyhaise 2660204No decision yet · 172 m
    5. 5Townparks, Ballyhaise 2660435No decision yet · 400 m
    6. 6Cavan Road Townparks, Ballyhaise 2660234Approved with conditions · 317 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 30 permissions since 2016, 12 show a start notice and 5 have a completion certificate.

    32 applications lodged within 500 m. Council: 30 approved, 2 refused. After appeals: 30 approved. Of those: 5 signed off, 1 built with the owner's opt-out, 6 started, 10 with no start notice found, 8 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT30: lodged → approved2: lodged → refused29: approved → approved1: refused → refused1 approved by the council, withdrawn or invalid after an appeal1 refused by the council, approved after an appeal10: approved → no start notice found1: approved → built, owner opted out6: approved → started, not signed off5: approved → signed off8: approved → ran out32 lodged32 lodged30 approved30 approved2 refused2 refused30 approved30 approved1 refused1 refused1 withdrawn1 withdrawn10 no start notice found10 no start notice found1 built, owner opted out1 built, owner opted out6 started, not signed off6 started, not signed off5 signed off5 signed off8 ran out8 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured32 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 3 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-03 2660447: CONDITIONAL — to retain existing detached dormer domestic garage on bungalow site, known as ‘Woodbine Cottage’; 2026-11-10 2660464: CONDITIONAL — to install an Astro Turf Pitch, perimeter fencing and flood lighting at St. Mary’s National School, Townparks, Ballyhaistoday24 Oct29 Oct3 Nov8 Nov13 Nov18 Nov2660447: CONDITIONAL — to retain existing detached dormer domestic garage on bungalow site, known as ‘Woodbine Cottage’ · 95 m away · 2026-11-032660464: CONDITIONAL — to install an Astro Turf Pitch, perimeter fencing and flood lighting at St. Mary’s National School, Townparks, Ballyhais · 238 m away · 2026-11-10
    Time to appeal ends
    • Time to appeal ends 3 Nov 202615 days left
      12660447 · CONDITIONAL — to retain existing detached dormer domestic garage on bungalow site, known as ‘Woodbine Cottage’
      €220 to An Coimisiún Pleanála (€110 observer) · 95 m away
    • Time to appeal ends 10 Nov 202622 days left
      22660464 · CONDITIONAL — to install an Astro Turf Pitch, perimeter fencing and flood lighting at St. Mary’s National School,…
      €220 to An Coimisiún Pleanála (€110 observer) · 238 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    16 homes 374 m away were approved Jan 2026 with no start notice yet; the permission runs to Jan 2031.

    Church View · 16 homes: 16 homes approved Jan 2026, not started20242025202620272028202920302031Church View · 16 homes374 m · 256045316 homes approved Jan 2026, not started16 homes approved Jan 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 1 within 500 m

    Approved, not started 1

    • Church View · 16 homes approved Jan 2026, not started · 374 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 9

    Applications within 500 m, by year

    Between 1 and 5 a year; busiest 2020. 94% of decisions were approvals.

    2017: 3, 2018: 4, 2019: 3, 2020: 5, 2021: 4, 2022: 5, 2023: 1, 2024: 2, 2025: 2, 2026: 305102017: 3 approved3’17*2018: 4 approved4’182019: 3 approved3’192020: 4 approved2020: 1 refused5’202021: 4 approved4’212022: 5 approved5’222023: 1 refused1’232024: 2 approved2’242025: 2 approved2’252026: 3 approved3’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 7 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    Homes coming 16 not started
    • 3Church View · 16 homes · not started · runs out 12 Jan 2031 · 374 m
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Ballyhaise Community Pre- School · Crèche23 Oct 2024 · report · Tusla Early Years Inspectorateapprox. 553 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Cavan County Council.
    Homes approved
    Here45
    Council middle0
    Homes started
    Here12
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    10% of homes built before 1971 (council 25%). 70% owner-occupied (council 69%).

    Homes built before 1971
    10% · council 25%
    Homes built since 2001
    60% · council 41%
    Owner-occupied
    70% · council 69%
    Rented
    28% · council 24%
    Children under 15
    25% · council 22%
    Aged 65 and over
    14% · council 15%
    Households with 2+ cars
    45% · council 47%
    Work mainly from home
    5% · council 8%
    This small area (419 people)Cavan

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 027007003

    Bus
    318 m
    Annalee Mnr · 176, C1, C3 · busiest stop within 500 m: 1 an hour at peak
    Nearest school
    317 m
    Ballyhaise NS, 152 pupils
    Schools, stops and the council

    Schools

    • Ballyhaise NS · primary · 152 pupils · 317 m

    Stops 4

    • Annalee Mnr · 176, C1, C3 · 1/hour at peak · 318 m
    • Annalee Mnr · 176, C1, C3 · 1/hour at peak · 330 m
    • Ballyhaise · 176, C3 · 1/hour at peak · 551 m
    • Ballyhaise · 176, C1, C3 · 1/hour at peak · 551 m

    Schools growing or shrinking planning in 3 years · pupils last year

    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 19 Oct 2026, 02:28
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Council consultation portalsPublic19 Oct 2026, 01:38open
    Council meetings (ModernGov)Public19 Oct 2026, 02:28open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Attic or dormer (21148) built without official sign-off: built properly?
      Ask for: An engineer's opinion of compliance.
      Seller · solicitor
    2. Decision 95 m away can be appealed until 3 Nov 2026: appeal?
      Ask for: The decision on the council's website (€220 to appeal).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Townparks
    Electoral division
    Ballyhaise
    Electoral area
    Bailieborough - Cootehill
    Council
    Cavan County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 21148, approved 2021, started, no sign-off needed.
    • Not protected; no vacant land tax.
    • 1 site nearby could change: 1 approved scheme.
    • 16 homes approved nearby, not started; largest 16 at Church View.
    • Annalee Mnr (bus 176, C1) 318 m away: 1 an hour at morning peak; 3 from all stops within 500 m.
    • Here (2022 census): 70% owner-occupied (council 69%); 7% of homes empty (council 15%); most built 2001–2010; 82% drive to work (council 65%); population up 9% since 2016.
    • 1 home extension within 250 m since 2026.
    • The council decides in a median 58 days (about 8 weeks); 45% are asked for more information.
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 25
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.019 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public19 Oct 2026
    www2.courts.ie—© the publisher19 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public19 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.019 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence19 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 19 Oct 2026, 18:56 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.