54.27094, -8.47201

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (95%). 32 homes approved 329 m away haven't started.

See on the mapWatch this area

Not held yet for Sligo County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 7 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
M2
Zoning · Major town centre
Yes
Protected or listed · inside the zone around a recorded monument (SL014-292----)
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningM2 · Major town centre
What it says

TC1 – town centre uses, type 1: Objective: Protect the historic character and of Sligo’s old town core through conservation, regeneration and public realm improvements, and promote civic, retail and compatible uses that preserve the town core’s identity and attractiveness.

The main town centre — retail, offices, civic uses, apartments.

sligo county development plan 2024 2030 · 11 Nov 2024 – 11 Nov 2030

Heritage inventory27 within 100 m shop/retail outlet; house
Monument zoneOn this site Wall monument, Abbeyquarter North; Graveslab, Abbeyquarter North

Not on this site: protected building, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: G. Bruss GmbH Dichtungstechnik (959 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings217house; Sligo Methodist Church
Monuments41R160348; Historic town
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 97 on the draft 2027 map; 90 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Sites and Monuments Record, SMR zones of notification, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 90–100% by type. A new house in a garden is harder: 100% approved, and 1 in 2 are asked for more information.

Single-storey rear14 decided · more info asked 21%
100% · council 100%
Two-storey rear20 decided · more info asked 35%
90% · council 90%
Attic or dormer20 decided · more info asked 5%
95% · council 96%
First-floor12 decided · more info asked 0%
100% · council 96%
New house in a garden or site11 decided · more info asked 55%
100% · council 90%
Approved nearbySligo overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 77 nearby, 783 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 52 days. 1 in 5 is asked for more information, which adds about 69 days. Building starts about 7 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 5): 124 days; Appeal window: 4 weeks; Building starts: 205 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 49–54 (n=100)52 daysIf more info asked (1 in 5)With further information: median 124 days (n=24)124 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 205 days after permission (n=21)205 days after permissionSigned off38% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated124 decided home extensions, 21 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    0 of 1 appealed refusals became permissions. 1 of 11 appealed approvals were reversed.

    Refusals appealed1 decided
    0 became permissions
    Approvals appealed11 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months
    • 324374 Open · The Lake Isle Residence, The Mall, Sligo, Ireland · 175 m
    • 500748 Open · Swan Point , Fish Quay , Sligo · 317 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around 12 Castle Street, Cranmore with 15 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedRefusedAppealBuilding startedApprovedNo decision yet
    1. 19 Castle Street, Sligo 2660422No decision yet · 17 m
    2. 2Connacht House, Markievicz Road 2660411No decision yet · 284 m
    3. 3Burton Street, Sligo 2660409No decision yet · 304 m
    4. 4No 14, Quay St. 2660426No decision yet · 354 m
    5. 5No. 6 Teeling Street 2560439Approved, no sign building has started · 114 m
    6. 6SwanPoint 2560004Approved, no sign building has started · 329 m
    7. 723 Chapel Street, Sligo 2660238Refused · 140 m
    8. 8The Lake Isle Residence, The Mall 324374Appeal: open · 175 m
    9. 911 Bridge Street, Sligo 2560026Building started · 127 m
    10. 1026 Market Street, Sligo CN0148507SOBuilding started · 147 m
    11. 11Units 1 & 2, The Courtyard 2660232Approved with conditions · 115 m
    12. 125 Old Market Street, (through to Pearse Road) 2660082Approved with conditions · 200 m
    13. 13Holborn Street, Sligo 2660246Approved with conditions · 244 m
    14. 14Chapel Hill, Abbeyquarter 2660395No decision yet · 259 m
    15. 15Swan Point, Fish Quay 2560475Refused · 317 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 90 permissions since 2016, 18 show a start notice and 5 have a completion certificate.

    100 applications lodged within 500 m. Council: 90 approved, 10 refused. After appeals: 90 approved. Of those: 5 signed off, 2 built with the owner's opt-out, 11 started, 62 with no start notice found, 10 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT90: lodged → approved10: lodged → refused90: approved → approved10: refused → refused62: approved → no start notice found2: approved → built, owner opted out11: approved → started, not signed off5: approved → signed off10: approved → ran out100 lodged100 lodged90 approved90 approved10 refused10 refused90 approved90 approved10 refused10 refused62 no start notice found62 no start notice found2 built, owner opted out2 built, owner opted out11 started, not signed off11 started, not signed off5 signed off5 signed off10 ran out10 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured100 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    4 deadlines within 500 m; the first closes 5 Nov 2026.

    4 deadlines in the next 30 days: 2026-11-05 2660409: application received — Permission for retention of change of use and alterations to elevations and plans of vacant commercial premises to use a; 2026-11-06 2660411: application received — Change of use from office space Class 3 to medial clinic Class 8(a), with new non structural internal fit out works to a; 2026-11-13 2660422: application received — Change of use of part of ground floor retail unit to consultation rooms including alterations to interior ground floor l; 2026-11-18 2660426: application received — To erect Photovoltaic solar panels on the roof of existing dwelling house at No.14. Quay St., Sligo. This dwelling housetoday6 Nov11 Nov16 Nov21 Nov26 Nov1 Dec2660409: application received — Permission for retention of change of use and alterations to elevations and plans of vacant commercial premises to use a · 304 m away · 2026-11-052660411: application received — Change of use from office space Class 3 to medial clinic Class 8(a), with new non structural internal fit out works to a · 284 m away · 2026-11-062660422: application received — Change of use of part of ground floor retail unit to consultation rooms including alterations to interior ground floor l · 17 m away · 2026-11-132660426: application received — To erect Photovoltaic solar panels on the roof of existing dwelling house at No.14. Quay St., Sligo. This dwelling house · 354 m away · 2026-11-18
    Comments close
    • Comments close 5 Nov 20264 days left
      32660409 · application received — Permission for retention of change of use and alterations to elevations and plans of vacant…
      €20 to the council · 304 m away
    • Comments close 6 Nov 20265 days left
      22660411 · application received — Change of use from office space Class 3 to medial clinic Class 8(a), with new non structural…
      €20 to the council · 284 m away
    • Comments close 13 Nov 202612 days left
      12660422 · application received — Change of use of part of ground floor retail unit to consultation rooms including alterations to…
      €20 to the council · 17 m away
    • Comments close 18 Nov 202617 days left
      42660426 · application received — To erect Photovoltaic solar panels on the roof of existing dwelling house at No.14. Quay St.,…
      €20 to the council · 354 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    32 homes 329 m away were approved Apr 2025 with no start notice yet; the permission runs to Apr 2030.

    SwanPoint · 32 homes: 32 homes approved Apr 2025, not started; No. 6 Teeling Street · 31 homes: 31 homes approved Jan 2026, not started20242025202620272028202920302031SwanPoint · 32 homes329 m · 256000432 homes approved Apr 2025, not started32 homes approved Apr 2025, not startedNo. 6 Teeling Street · 31 homes114 m · 256043931 homes approved Jan 2026, not started31 homes approved Jan 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 3 within 500 m

    Approved, not started 2

    Empty land zoned for homes 1

    • 0.2 ha zoned for homes · no homes built on it yet · 79 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 14 and 22 a year; busiest 2023. 90% of decisions were approvals.

    2021: 15, 2022: 17, 2023: 22, 2024: 14, 2025: 21, 2026: 1101020302021: 15 approved15’21*2022: 16 approved2022: 1 refused17’222023: 21 approved2023: 1 refused22’232024: 13 approved2024: 1 refused14’242025: 16 approved2025: 5 refused21’252026: 9 approved2026: 2 refused11’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 3Burton Street , Sligo , Co. Sligo comments close 5 Nov 2026
      Permission for retention of change of use and alterations to elevations and plans of vacant commercial…
      26604091 Oct 2026304 m
    • 2Connacht House , Markievicz Road , Co. Sligo comments close 6 Nov 2026
      Change of use from office space Class 3 to medial clinic Class 8(a), with new non structural internal fit out…
      26604112 Oct 2026284 m
    • 19 Castle Street , Sligo , County Sligo comments close 13 Nov 2026
      Change of use of part of ground floor retail unit to consultation rooms including alterations to interior…
      26604229 Oct 202617 m
    • 4No 14 , Quay St. , Sligo comments close 18 Nov 2026
      To erect Photovoltaic solar panels on the roof of existing dwelling house at No.14. Quay St., Sligo. This…
      266042614 Oct 2026354 m
    Every application within 500 m 19 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 4 in the last 12 months
    2 not signed off2 no sign-off needed
    • 5 Church Street, Sligo, F91 YH57 · 9 Nov 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60244 · 302 m
    • 1026 Market Street, Sligo, F91 RK5E · 13 Oct 2026 · 2 homes · start notice not signed off · 147 m
    • 64 Saint Edwards Terrace, Sligo, F91 VC5C · 27 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2560397 · 443 m
    • 911 Bridge Street, Sligo, F91 Y993 · 29 Jun 2026 · start notice not signed off · 2560026 · 127 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 63 not started
    • 6SwanPoint · 32 homes · not started · runs out 1 Apr 2030 · 329 m
    • 5No. 6 Teeling Street · 31 homes · not started · runs out 25 Jan 2031 · 114 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Bright Minds · Crèche24 Oct 2024 · report · Tusla Early Years Inspectorate319 m
    Lilliput Montessori/Pre School · Crèche11 Feb 2025 · report · Tusla Early Years Inspectorate349 m
    Cosy Cats ChildCare Ltd · Crèche7 Nov 2024 · report · Tusla Early Years Inspectorate377 m
    Footprints · Crèche27 May 2025 · report · Tusla Early Years Inspectorate556 m
    Inspiring Minds Preschool · Crèche21 May 2025 · report · Tusla Early Years Inspectorate693 m
    Sligo Springboard CLG Resource House Project Creche · Crèche15 May 2026 · report · Tusla Early Years Inspectorate995 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Sligo County Council.
    Homes approved
    Here129
    Council middle0
    Homes started
    Here77
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    11% owner-occupied (council 67%).

    Homes built before 1971
    24% · council 27%
    Homes built since 2001
    29% · council 33%
    Owner-occupied
    11% · council 67%
    Rented
    77% · council 27%
    Children under 15
    6% · council 19%
    Aged 65 and over
    9% · council 18%
    Households with 2+ cars
    4% · council 42%
    Work mainly from home
    11% · council 12%
    This small area (217 people)Sligo

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 207082005/207082006

    Bus
    58 m
    Abbey St · S1 · busiest stop within 500 m: 7 an hour at peak
    Nearest school
    307 m
    Our Lady Of Mercy NS, 449 pupils
    Schools, stops and the council

    Schools

    • Our Lady Of Mercy NS · primary · 449 pupils · 307 m
    • Sligo Project School · primary · 52 pupils · 399 m
    • Carbury National School · primary · 210 pupils · 416 m
    • Mercy College · postprimary · 718 pupils · 521 m
    • Scoil Eoin Naofa · primary · 289 pupils · 531 m
    • Sligo Grammar School · postprimary · 475 pupils · 645 m
    • Summerhill College · postprimary · 1155 pupils · 768 m

    Stops 32

    • Abbey St · S1 · 2/hour at peak · 58 m
    • O'Connell Street · S1 · 2/hour at peak · 208 m
    • High Street · S1 · 2/hour at peak · 218 m
    • Sligo Markievicz · 449, 458, S1, S2, S3 · 6/hour at peak · 233 m
    • Teeling Street · 449 · 237 m
    • Sligo Markievicz · 563, 566, 572, 964, 977, 981 · 7/hour at peak · 252 m
    • John Street · S1, S2, S3 · 3/hour at peak · 325 m
    • Quay Street · NG05 · 379 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Our Lady Of Mercy NS · 307 m+2.7% pupils (449) · an extension 2026, approved with conditions
    • Sligo Project School · 399 m+10.6% pupils (52)
    • Carbury National School · 416 m-0.5% pupils (210)
    • Mercy College · 521 m+6.2% pupils (718) · 2 classrooms 2025, approved with conditions
    • Scoil Eoin Naofa · 531 m+9.9% pupils (289)
    • Sligo Grammar School · 645 m-4% pupils (475)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    2. 31 homes approved 114 m away (No. 6 Teeling Street), not started: what is planned?
      Ask for: The planning file for 2560439.
      Council
    3. Application 17 m away open for comments until 13 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Abbeyquarter South
    Electoral division
    Sligo East
    Electoral area
    Sligo-Strandhill
    Council
    Sligo County Council
    Everything we found, as a list 8 lines
    • Zoned M2 (major town centre); monument zone; no vacant land tax.
    • 3 sites nearby could change: 2 approved schemes, 1 empty zoned plot.
    • 4 applications open for comments nearby; nearest closes 13 Nov 2026.
    • 63 homes approved nearby, not started; largest 32 at SwanPoint.
    • Sligo Markievicz (bus 563, 566) 252 m away: 7 an hour at morning peak; 33 from all stops within 500 m.
    • Here (2022 census): 77% rent (council 27%); 30% of homes empty (council 18%); most built 2001–2010; 18% drive to work (council 61%); population down 1% since 2016.
    • The council decides in a median 52 days (about 7 weeks); 1 in 4 is asked for more information.
    • Homes started within 1 km: 45 in the last year, 5 three years before.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 28
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 08:50 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.