PlanningRegister.ie
Planning report · Leitrim County Council · 2000 m around the house · the last 12 months · 24 Oct 2026, 02:08

L61801, Manorhamilton

54.31478, -8.16810

Homes here mostly date from the 2000s. 10 homes approved 1.5 km away haven't started.

See on the mapWatch this area

Not held yet for Leitrim County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Monument zone1 within 100 m Ringfort - rath, Skreeny (Drumahaire By.)

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings29Manorhamilton Castle; house
Monuments52Ringfort - rath
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 11 on the draft 2027 map; 11 on the final 2026 map.
Sources: Development plan zoning (councils), Sites and Monuments Record, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 02:28
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 100% approved, and 1 in 3 is asked for more information.

New house in a garden or site8 decided · more info asked 38%
100% · council 96%
Approved nearbyLeitrim overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 8 nearby, 369 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 23 Oct 2026, 23:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 23:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Question 3

    How long, and what if someone objects?

    Appeals nearby 1 in the last 12 months
    • 324290 Pending · located in the townlands of Boleyboy, Cashelaveela, Cherrybrook,… · 1.4 km
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 23 Oct 2026, 23:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher23 Oct 2026, 23:01open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Question 4

    What's changing around you?

    Street map around L61801, Manorhamilton with 15 numbered planning items
    ⌖ the houseWindow closingEmpty land zoned for homesNo decision yetApproved
    1. 1New Line, Manorhamilton 2660035Approved with conditions · 1.1 km
    2. 2Riverdale Station Road, Manorhamilton 2660203Approved with conditions · 1.3 km
    3. 3Millhill Lawns, Manorhamilton TD. Manorhamilton 2660067Approved with conditions · 1.4 km
    4. 41.9 ha zoned for homesEmpty land zoned for homes · 288 m
    5. 51.8 ha zoned for homesEmpty land zoned for homes · 490 m
    6. 60.7 ha zoned for homesEmpty land zoned for homes · 742 m
    7. 71.1 ha zoned for homesEmpty land zoned for homes · 923 m
    8. 80.8 ha zoned for homesEmpty land zoned for homes · 979 m
    9. 90.9 ha zoned for homesEmpty land zoned for homes · 1.2 km
    10. 10Clooneen & Skreeny Tds., Manorhamilton 2660169No decision yet · 852 m
    11. 11Castle Street, Manorhamilton 2660148Approved with conditions · 1.1 km
    12. 1217 Castle street, Manorhamilton 2660077Approved with conditions · 1.2 km
    13. 1318 Castle street, Manorhamilton 2660086Approved with conditions · 1.2 km
    14. 14The Central, Main Street 2660131Approved with conditions · 1.3 km
    15. 15Killasnett Co-op, Sligo Road 2660216No decision yet · 1.3 km
    Figure 3

    The next 30 days

    3 deadlines within 2.0 km; the first closes 27 Oct 2026.

    3 deadlines in the next 30 days: 2026-10-27 2660067: CONDITIONAL — 1. To construct 10 number single storey type detached domestic dwellings comprising 5 no. 2-bed units and 5 no. 3-bed un; 2026-11-02 2660035: CONDITIONAL — 1. Retention of extension to rear of shop. 2. Retention of changed front elevation (lowered cills) 3. Demolition of exis; 2026-11-04 2660203: CONDITIONAL — 1. Retain an existing single storey rear extension, 2. Retain the porch to the front of the existing dwelling, 3. Retatoday29 Oct3 Nov8 Nov13 Nov18 Nov23 Nov2660067: CONDITIONAL — 1. To construct 10 number single storey type detached domestic dwellings comprising 5 no. 2-bed units and 5 no. 3-bed un · 1.4 km away · 2026-10-272660035: CONDITIONAL — 1. Retention of extension to rear of shop. 2. Retention of changed front elevation (lowered cills) 3. Demolition of exis · 1.1 km away · 2026-11-022660203: CONDITIONAL — 1. Retain an existing single storey rear extension, 2. Retain the porch to the front of the existing dwelling, 3. Reta · 1.3 km away · 2026-11-04
    Time to appeal ends
    • Time to appeal ends 27 Oct 20263 days left
      32660067 · CONDITIONAL — 1. To construct 10 number single storey type detached domestic dwellings comprising 5 no. 2-bed units and…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.4 km away
    • Time to appeal ends 2 Nov 20269 days left
      12660035 · CONDITIONAL — 1. Retention of extension to rear of shop. 2. Retention of changed front elevation (lowered cills) 3.…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.1 km away
    • Time to appeal ends 4 Nov 202611 days left
      22660203 · CONDITIONAL — 1. Retain an existing single storey rear extension, 2. Retain the porch to the front of the existing…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.3 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 4

    Approved, stalled or planned, not built yet

    10 homes 1.5 km away were approved Sept 2026 with no start notice yet; the permission runs to Sept 2031.

    Millhill Lawns · 10 homes: 10 homes approved Sep 2026, not started202420252026202720282029203020312032Millhill Lawns · 10 homes1.5 km · 266006710 homes approved Sep 2026, not started10 homes approved Sep 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 2.0 km

    Approved, not started 1

    Empty land zoned for homes 10

    • 41.9 ha zoned for homes · no homes built on it yet · 288 m
    • 51.8 ha zoned for homes · no homes built on it yet · 490 m
    • 60.7 ha zoned for homes · no homes built on it yet · 742 m
    • 71.1 ha zoned for homes · no homes built on it yet · 923 m
    • 80.8 ha zoned for homes · no homes built on it yet · 979 m
    • 90.9 ha zoned for homes · no homes built on it yet · 1.2 km
    • 0.2 ha zoned for homes · no homes built on it yet · 1.4 km
    • 0.8 ha zoned for homes · no homes built on it yet · 1.4 km
    • 1.7 ha zoned for homes · no homes built on it yet · 1.4 km
    • 0.4 ha zoned for homes · no homes built on it yet · 1.4 km

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 23 Oct 2026, 23:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Every application within 2.0 km 10 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 23 Oct 2026, 23:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    Building work nearby 8 in the last 12 months
    1 not signed off7 no sign-off needed
    • Castle Street, Manorhamilton, Leitrim, F91 FT50 · 30 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 2660148 · 1.2 km
    • Upper Main Street, Manorhamilton, Leitrim · 8 Sept 2026 · 2 homes · 7-day notice not signed off · 1.3 km
    • Lisnabrack, Lurganboy, Leitrim · 26 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2560025 · 2.0 km
    • 17 Castle Street, Manorhamilton, Leitrim, F91 YA72 · 24 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2660077 · 1.2 km
    • 18 Castle Street, Manorhamilton, Leitrim, F91 Y635 · 24 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2660086 · 1.2 km
    • Deerpark, Manorhamilton, Leitrim · 4 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2357 · 284 m
    • Skreeney Rd, Manorhamilton, Leitrim, F91FH63 · 13 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2560080 · 1.1 km
    • Castle Street, Manorhamilton, Leitrim, F91 FT50 · 27 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 2460059 · 1.2 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 23 Oct 2026, 02:22
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    Homes coming 10 not started
    • 3Millhill Lawns · 10 homes · not started · runs out 28 Sept 2031 · 1.5 km
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 23 Oct 2026, 23:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    How busy is this area About as busy as most of Leitrim County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here2
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 23 Oct 2026, 23:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.023 Oct 2026, 02:22open
    National Planning Application DatabaseCC BY 4.023 Oct 2026, 02:28open
    Question 5

    What's the area like?

    Figure 5

    This street block against the council

    82% owner-occupied (council 71%).

    Homes built before 1971
    33% · council 27%
    Homes built since 2001
    28% · council 40%
    Owner-occupied
    82% · council 71%
    Rented
    11% · council 23%
    Children under 15
    17% · council 20%
    Aged 65 and over
    20% · council 19%
    Households with 2+ cars
    59% · council 45%
    Work mainly from home
    12% · council 10%
    This small area (397 people)Leitrim

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 117063001

    Nearest school
    1.1 km
    Mastersons NS, 34 pupils
    Schools, stops and the council

    Schools

    • Mastersons NS · primary · 34 pupils · 1.1 km
    • Gaelscoil Chluainín · primary · 69 pupils · 1.2 km
    • St Clare's National School · primary · 204 pupils · 1.4 km
    • St. Clare's Comprehensive School · postprimary · 504 pupils · 1.5 km

    Stops 4

      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 24 Oct 2026, 01:49
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Council consultation portalsPublic24 Oct 2026, 01:49open
      Council meetings (ModernGov)Public23 Oct 2026, 02:42open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Skreeny
      Electoral division
      Manorhamilton
      Electoral area
      Manorhamilton
      Council
      Leitrim County Council
      Everything we found, as a list 8 lines
      • Not protected; no vacant land tax.
      • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
      • 10 homes approved nearby, not started; largest 10 at Millhill Lawns.
      • No scheduled public transport within 800 m.
      • Here (2022 census): 82% owner-occupied (council 71%); 23% of homes empty (council 24%); most built 2001–2010; 70% drive to work (council 66%); population up 9% since 2016.
      • The council decides in a median 53 days (about 8 weeks); 36% are asked for more information.
      • 10 applications nearby in the last 12 months; 100% approved (council 96%).
      • 2 homes started within 1 km in 3 years (council middle 1).
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 25
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.023 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public24 Oct 2026
      www2.courts.ie—© the publisher23 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public23 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.023 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence24 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 24 Oct 2026, 02:08 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.