Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (98%).

See on the mapWatch this area

Not held yet for Donegal County Council: zoning and council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 48 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of LisnenanBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 2 files on Lisnenan2022: 1 file on Lisnenan2023: 1 file on Lisnenan2026: 1 file on Lisnenan5 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Monument zone1 within 100 m Ritual site - holy well, Lisnenan

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Monuments5Ringfort - cashel; Ritual site - holy well
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 9 on the draft 2027 map; 9 on the final 2026 map.
Sources: Development plan zoning (councils), Sites and Monuments Record, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 90% approved, and 1 in 7 is asked for more information.

New house in a garden or site39 decided · more info asked 15%
90% · council 92%
Approved nearbyDonegal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 39 nearby, 3,858 council-wide

Figure 3

Lisnenan, file by file since 2021

1 of 1 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

5 planning files on Lisnenan since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 79 · 2021 · other extension · approved · 2150703Porches, roofs, otherNo number · 2021 · other work · approved · 2151302No number · 2026 · other work · refused · 2661006New house in a side gardenNo. 63 · 2022 · new house · approved · 225108163No. 72 · 2023 · new house · approved · 235080772
ApprovedRefusedWithdrawn or invalid

5 files with "Lisnenan" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 48 days. 1 in 5 is asked for more information, which adds about 76 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 48 days; If more info asked (1 in 5): 121 days; Appeal window: 4 weeks; Building starts: 134 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 48 days, middle half 44–51 (n=51)48 daysIf more info asked (1 in 5)With further information: median 121 days (n=13)121 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 134 days after permission (n=18)134 days after permissionSigned off50% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated64 decided home extensions, 18 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 8 appealed approvals were reversed.

    Approvals appealed8 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Letterkenny Municipal District with 11 numbered planning items
    ⌖ the houseEmpty land zoned for homesRefusedApprovedNo decision yet
    1. 14.2 ha zoned for homesEmpty land zoned for homes · 75 m
    2. 25.3 ha zoned for homesEmpty land zoned for homes · 233 m
    3. 30.4 ha zoned for homesEmpty land zoned for homes · 367 m
    4. 40.2 ha zoned for homesEmpty land zoned for homes · 415 m
    5. 55.4 ha zoned for homesEmpty land zoned for homes · 420 m
    6. 60.4 ha zoned for homesEmpty land zoned for homes · 459 m
    7. 7BALLYBOE LISNENAN, LETTERKENNY 2661006Refused · 304 m
    8. 8NO. 55 LISNENNAN COURT, LISNENNAN 2562027Approved with conditions · 402 m
    9. 9THE PGIM BUILDING, IDA BUSINESS PARK 2562299Approved with conditions · 415 m
    10. 10BALLYRAINE, LETTERKENNY 2661646No decision yet · 448 m
    11. 11NO. 45 LISNENNAN COURT, LETTERKENNY 2660992Approved with conditions · 481 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 19 permissions since 2016, 9 show a start notice and 5 have a completion certificate.

    20 applications lodged within 500 m. Council: 19 approved, 1 refused. After appeals: 19 approved. Of those: 5 signed off, 2 built with the owner's opt-out, 2 started, 9 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT19: lodged → approved1: lodged → refused19: approved → approved1: refused → refused9: approved → no start notice found2: approved → built, owner opted out2: approved → started, not signed off5: approved → signed off1: approved → ran out20 lodged20 lodged19 approved19 approved1 refused1 refused19 approved19 approved1 refused1 refused9 no start notice found9 no start notice found2 built, owner opted out2 built, owner opted out2 started, not signed off2 started, not signed off5 signed off5 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured20 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 8 within 500 m

      Empty land zoned for homes 8

      • 14.2 ha zoned for homes · no homes built on it yet · 75 m
      • 25.3 ha zoned for homes · no homes built on it yet · 233 m
      • 30.4 ha zoned for homes · no homes built on it yet · 367 m
      • 40.2 ha zoned for homes · no homes built on it yet · 415 m
      • 55.4 ha zoned for homes · no homes built on it yet · 420 m
      • 60.4 ha zoned for homes · no homes built on it yet · 459 m
      • 0.4 ha zoned for homes · no homes built on it yet · 485 m
      • 21.4 ha zoned for homes · no homes built on it yet · 0 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 26 Oct 2026, 01:57
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
      Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
      National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 8

      Applications within 500 m, by year

      Between 2 and 8 a year; busiest 2023. 95% of decisions were approvals.

      2021: 1, 2022: 2, 2023: 8, 2024: 3, 2025: 4, 2026: 205102021: 1 approved1’21*2022: 2 approved2’222023: 8 approved8’232024: 3 approved3’242025: 4 approved4’252026: 1 approved2026: 1 refused2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 5 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
      Building work nearby 4 in the last 12 months
      1 signed off as finished1 not signed off2 no sign-off needed
      • 56 Lisnennan Court, Letterkenny, Donegal · 2 Nov 2026 · 1 homes · start notice, opted out no sign-off needed · 433 m
      • 55 Lisnennan Court, Letterkenny, Donegal · 8 Jun 2026 · 1 homes · start notice not signed off · 25-62027 · 422 m
      • Business Park Road, Ballyraine, Letterkenny, Letterkenny, Donegal, F92 FP83 · 4 Jun 2026 · start notice signed off · 25-62299 · 483 m
      • 12 Lisnennan Court, Letterkenny, Donegal · 8 May 2026 · 1 homes · start notice, opted out no sign-off needed · 24/60272 · 238 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
      0
      Named places nearby: estate, schemes, crèches, schools
      How busy is this area Busier than most of Donegal County Council.
      Homes approved
      Here62
      Council middle0
      Homes started
      Here85
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
      National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      2% of homes built before 1971 (council 21%). 61% owner-occupied (council 70%).

      Homes built before 1971
      2% · council 21%
      Homes built since 2001
      83% · council 36%
      Owner-occupied
      61% · council 70%
      Rented
      39% · council 23%
      Children under 15
      23% · council 20%
      Aged 65 and over
      8% · council 18%
      Households with 2+ cars
      47% · council 42%
      Work mainly from home
      21% · council 11%
      This small area (332 people)Donegal

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 057106028

      Nearest school
      516 m
      Letterkenny Educate Together NS, 420 pupils
      Schools, stops and the council

      Schools

      • Letterkenny Educate Together NS · primary · 420 pupils · 516 m
      • Coláiste Ailigh · postprimary · 324 pupils · 969 m

      Stops 0

        Schools growing or shrinking planning in 3 years · pupils last year

        • Letterkenny Educate Together NS · 515 m-0.2% pupils (420) · 4 classrooms 2023, approved with conditions
        • Coláiste Ailigh · 969 m+0.9% pupils (324)
        Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 26 Oct 2026, 01:54
        SourceLicenceFetchedLink
        Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
        Department of Education school listCC BY 4.027 Sept 2026, 23:32open
        National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
        Council consultation portalsPublic26 Oct 2026, 00:55open
        Council meetings (ModernGov)Public26 Oct 2026, 01:54open
        Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. On the vacant land tax map: is the 3% tax being paid?
          Ask for: Your solicitor's check of liability or exemption.
          Solicitor
        2. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Lisnenan
        Electoral division
        Letterkenny Rural
        Electoral area
        Letterkenny
        Council
        Donegal County Council
        Everything we found, as a list 8 lines
        • Not protected; on the vacant land tax map.
        • 8 sites nearby could change: 8 empty zoned plots.
        • No scheduled public transport within 800 m.
        • Here (2022 census): 61% owner-occupied (council 70%); 10% of homes empty (council 26%); most built 2001–2010; 71% drive to work (council 63%); population up 7% since 2016.
        • Around here the council decides in a median 50 days (about 7 weeks); 1 in 4 is asked for more information.
        • Homes started within 1 km: 20 in the last year, 3 three years before.
        • 5 applications nearby in the last 12 months.
        • Letterkenny Educate Together NS, 515 m away: 4 classrooms approved (2023).
        What the terms mean 6 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
        • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • Permission for work already done (Retention permission): An application to keep something that was built without permission.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 24
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.026 Oct 2026
        data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
        dlrcoco.citizenspace.comLocal authorities (consultation portals)Public26 Oct 2026
        www2.courts.ie—© the publisher25 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
        transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
        lda.ieLand Development AgencyCC BY 4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)Public26 Oct 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.026 Oct 2026
        services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence26 Oct 2026
        services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
        gov.ieDepartment of EducationCC BY 4.027 Sept 2026
        gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 26 Oct 2026, 08:51 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.