Kilmacrenan Road, Kilmacrennan

55.03375, -7.77641

Homes here mostly date from the 2000s. 12 homes approved 994 m away haven't started.

See on the mapWatch this area
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of KilmacrenanBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2017: 2 files on Kilmacrenan2018: 1 file on Kilmacrenan2019: 1 file on Kilmacrenan2021: 2 files on Kilmacrenan2022: 1 file on Kilmacrenan2024: 2 files on Kilmacrenan2025: 1 file on Kilmacrenan10 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Kilmacrennan (307 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings7Church of St. Finian and St. Mark; St. Columba's Catholic Church
Monuments25Burial ground; Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: zoning, epa_leap, rzlt, constraints, constraints.niah, constraints.smr · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
epa_leapCC-BY-4.012 Oct 2026, 23:31open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 13 Oct 2026, 00:21
SourceLicenceFetchedLink
bcmsCC-BY-4.013 Oct 2026, 00:21open
npadCC-BY-4.013 Oct 2026, 01:45open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 88% approved, and 1 in 2 are asked for more information.

New house in a garden or site32 decided · more info asked 50%
88% · council 90%
Approved nearbyDonegal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 32 nearby, 5,750 council-wide

Figure 3

Kilmacrenan, file by file since 2017

1 of 1 decided extensions on the road were approved. New houses in side gardens or on sites: 4 of 4.

10 planning files on Kilmacrenan since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo. 289 · 2018 · porch / front · approved · 1850528Porches, roofs, otherNo number · 2017 · other work · approved · 1750705No number · 2021 · other work · approved · 2150888No number · 2022 · other work · approved · 2250950No number · 2024 · other work · approved · 2461041No number · 2025 · other work · approved · 2561655New house in a side gardenNo number · 2017 · new house · approved · 1751259No number · 2019 · new house · approved · 1952013No number · 2021 · new house · approved · 2150988No number · 2024 · new house · approved · 2462158
ApprovedRefusedWithdrawn or invalid

10 files with "Kilmacrenan" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 13 Oct 2026, 01:45
    SourceLicenceFetchedLink
    npadCC-BY-4.013 Oct 2026, 01:45open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 49 days.

    Comments open: 5 weeks · €20; Council decision: 49 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 44–55 (n=15)49 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off60% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated18 decided home extensions, 5 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 1 appealed refusals became permissions. 3 of 4 appealed approvals were reversed.

    Refusals appealed1 decided
    0 became permissions
    Approvals appealed4 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501703 Pending · Letter, Kilmacrennan, Letterkenny PO, Co. Donegal · 1.3 km
    Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    courtsall-rights-reserved13 Oct 2026, 01:30open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Question 4

    What's changing around you?

    Street map around Kilmacrenan Road, Kilmacrennan with 15 numbered planning items
    ⌖ the houseWindow closingApproved, not startedLarge schemeApprovedNo decision yetRefused
    1. 1'THE LEARNING TREE' CHILDCARE & PRE-SCHOOL, KILCONNELL / GLEBE 2660104Refused · 430 m
    2. 2LEITER, KILMACRENNAN 2661447Approved with conditions · 981 m
    3. 3KILMACRENNAN 2562295Approved, no sign building has started · 994 m
    4. 4ARD NA GLAISE, MASSREAGH 2660849No decision yet · 593 m
    5. 5MASSREAGH, KILMACRENNAN 2660934Approved with conditions · 605 m
    6. 6MASSREAGH, KILMACRENNAN 2661263No decision yet · 700 m
    7. 7BALLYKEERAN, KILMACRENNAN 2661122Approved with conditions · 715 m
    8. 8GORTNASKEAGH, KILMACRENNAN 2561968Approved with conditions · 732 m
    9. 9ARD NA GLAISE, KILMACRENNAN 2650034Approved with conditions · 793 m
    10. 10BALLYKEERAN, KILMACRENNAN 2660113Approved with conditions · 1.1 km
    11. 11MASSREAGH, KILMACRENAN 2661547No decision yet · 1.1 km
    12. 12LETTER, KILMACRENNAN 2660753Approved with conditions · 1.3 km
    13. 13KEENAGHAN, KILMACRENNAN 2561970Refused · 1.3 km
    14. 14LETTERFAD, KILMACRENNAN 2660782Approved with conditions · 1.4 km
    15. 15KEENAGHAN, KILMACRENNAN 2661508No decision yet · 1.8 km
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 24 permissions since 2016, 5 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    27 applications lodged within 500 m. Council: 24 approved, 3 refused. After appeals: 24 approved. Of those: 0 signed off, 4 built with the owner's opt-out, 1 started, 10 with no start notice found, 9 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT24: lodged → approved3: lodged → refused24: approved → approved3: refused → refused10: approved → no start notice found4: approved → built, owner opted out1: approved → started, not signed off9: approved → ran out27 lodged27 lodged24 approved24 approved3 refused3 refused24 approved24 approved3 refused3 refused10 no start notice found10 no start notice found4 built, owner opted out4 built, owner opted out1 started, not signed off1 started, not signed off9 ran out9 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured27 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 2.0 km; the first closes 15 Oct 2026.

    2 deadlines in the next 30 days: 2026-10-15 2660104: REFUSED — PROVISION OF A NEW PREFABRICATED CLASSROOM BUILDING CONSISTING OF 2 NO. CLASSROOMS WITH ANCILLARY ACCOMMODATION, INCLUDI; 2026-10-22 2661447: CONDITIONAL — (1) THE RE-LOCATION, WITHIN THE SITE, OF A STORAGE SHED PREVIOUSLY PERMITTED UNDER PLANNING REF. NO. 26/60517, (2) TEMPOtoday18 Oct23 Oct28 Oct2 Nov7 Nov12 Nov2660104: REFUSED — PROVISION OF A NEW PREFABRICATED CLASSROOM BUILDING CONSISTING OF 2 NO. CLASSROOMS WITH ANCILLARY ACCOMMODATION, INCLUDI · 430 m away · 2026-10-152661447: CONDITIONAL — (1) THE RE-LOCATION, WITHIN THE SITE, OF A STORAGE SHED PREVIOUSLY PERMITTED UNDER PLANNING REF. NO. 26/60517, (2) TEMPO · 981 m away · 2026-10-22
    Time to appeal ends
    • Time to appeal ends 15 Oct 20262 days left
      12660104 · REFUSED — PROVISION OF A NEW PREFABRICATED CLASSROOM BUILDING CONSISTING OF 2 NO. CLASSROOMS WITH ANCILLARY…
      €220 to An Coimisiún Pleanála (€110 observer) · 430 m away
    • Time to appeal ends 22 Oct 20269 days left
      22661447 · CONDITIONAL — (1) THE RE-LOCATION, WITHIN THE SITE, OF A STORAGE SHED PREVIOUSLY PERMITTED UNDER PLANNING REF. NO.…
      €220 to An Coimisiún Pleanála (€110 observer) · 981 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    12 homes 994 m away were approved Aug 2026 with no start notice yet; the permission runs to Aug 2031.

    KILMACRENNAN · 12 homes: 12 homes approved Aug 2026, not started202420252026202720282029203020312032KILMACRENNAN · 12 homes994 m · 256229512 homes approved Aug 2026, not started12 homes approved Aug 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 1 within 2.0 km

    Approved, not started 1

    • KILMACRENNAN · 12 homes approved Aug 2026, not started · 994 m

    Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

    Sources: acp, bcms, derelict, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    derelictCC-BY-4.012 Oct 2026, 23:08open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Figure 9

    Applications within 500 m, by year

    Between 2 and 4 a year; busiest 2022. 89% of decisions were approvals.

    2017: 3, 2018: 3, 2019: 2, 2020: 3, 2021: 2, 2022: 4, 2023: 2, 2024: 4, 2025: 3, 2026: 105102017: 3 approved3’17*2018: 3 approved3’182019: 2 approved2’192020: 3 approved3’202021: 2 approved2’212022: 3 approved2022: 1 refused4’222023: 2 approved2’232024: 3 approved2024: 1 refused4’242025: 3 approved3’252026: 1 refused1’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 2.0 km 22 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 13 Oct 2026, 01:45
    SourceLicenceFetchedLink
    npadCC-BY-4.013 Oct 2026, 01:45open
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    Building work nearby 14 in the last 12 months
    8 not signed off6 no sign-off needed
    • Keenaghan, Letterkenny, Donegal · 30 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · 2462123 · 1.7 km
    • Letterfad, Tawney Upper, Donegal · 12 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2660782 · 1.5 km
    • Ard Na Glaise, Kilmacrennan, Donegal · 29 Jun 2026 · 20 homes · start notice not signed off · PART 8 – PG 24/16 · 895 m
    • Ard Na Glaise, Kilmacrennan, Donegal · 29 Jun 2026 · 20 homes · start notice not signed off · PART 8 – PG 24/16 · 878 m
    • Ard Na Glaise, Kilmacrennan, Donegal · 29 Jun 2026 · 20 homes · start notice not signed off · PART 8 – PG 24/16 · 867 m
    • Ard Na Glaise, Kilmacrennan, Donegal · 29 Jun 2026 · 20 homes · start notice not signed off · PART 8 – PG 24/16 · 932 m
    • Ard Na Glaise, Kilmacrennan, Donegal · 29 Jun 2026 · 20 homes · start notice not signed off · PART 8 – PG 24/16 · 860 m
    • Kilmacrennan, Kilmacrenan, Donegal · 18 Jun 2026 · 1 homes · start notice not signed off · 25/60087 · 416 m
    • Tawny Lower, Tawney Lower, Donegal · 13 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 2561923 · 1.9 km
    • Kilmacrenan, Co. Donegal, F92 E26N, Kilmacrenan, Donegal · 25 Feb 2026 · 1 homes · start notice not signed off · 24/62158 · 457 m
    • Ballykeeran, Kilmacrenan, Donegal · 26 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · 609 m
    • BALLYKEERIN, Kilmacrenan, Donegal, F92W9K1 · 12 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · 25/50094 · 1.5 km
    • Letterfad, Kilmacrennan, Donegal, n/a · 7 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · 2560235 · 1.5 km
    • Kilmacrennan, Kilmacrenan, Donegal · 31 Oct 2025 · 7-day notice not signed off · 1750705 · 327 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 13 Oct 2026, 00:21
    SourceLicenceFetchedLink
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    Homes coming 12 not started
    • 3KILMACRENNAN · 12 homes · not started · runs out 25 Aug 2031 · 994 m
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    npadCC-BY-4.013 Oct 2026, 01:45open
    social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    The Learning Tree · Crèche5 Mar 2026 · report · Tusla Early Years Inspectorateapprox. 571 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: schools, tusla_ey · fetched 27 Sept 2026, 23:32
    SourceLicenceFetchedLink
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
    How busy is this area Busier than most of Donegal County Council.
    Homes approved
    Here12
    Council middle0
    Homes started
    Here34
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    81% owner-occupied (council 70%).

    Homes built before 1971
    13% · council 21%
    Homes built since 2001
    34% · council 36%
    Owner-occupied
    81% · council 70%
    Rented
    14% · council 23%
    Children under 15
    26% · council 20%
    Aged 65 and over
    15% · council 18%
    Households with 2+ cars
    48% · council 42%
    Work mainly from home
    8% · council 11%
    This small area (265 people)Donegal

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 057100005

    Bus
    414 m
    Kilmacrennan · 932, 932A · busiest stop within 500 m: 1 an hour at peak
    Nearest school
    722 m
    S N Naomh Colmchille, 231 pupils
    Schools, stops and the council

    Schools

    • S N Naomh Colmchille · primary · 231 pupils · 722 m

    Stops 6

    • Kilmacrennan · 932, 932A · 1/hour at peak · 414 m
    • Kilmacrennan · 932, 932A · 428 m
    • Kilmacrennan · 964 · 467 m
    • Kilmacrennan · 964 · 474 m
    • Kilmacrennan · 965 · 0/hour at peak · 591 m
    • Kilmacrennan · 965 · 0/hour at peak · 656 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • S N Naomh Colmchille · 722 m+1.3% pupils (231) · temporary classrooms 2026, approved with conditions
    Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
    SourceLicenceFetchedLink
    gtfsCC-BY-4.011 Oct 2026, 23:43open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    npadCC-BY-4.013 Oct 2026, 01:45open
    consultpublic13 Oct 2026, 01:29open
    moderngovpublic13 Oct 2026, 01:29open
    lda_landsCC-BY-4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Kilmacrenan
    Electoral division
    Kilmacrenan
    Electoral area
    Milford
    Council
    Donegal County Council
    Everything we found, as a list 8 lines
    • Not protected; no vacant land tax.
    • 1 site nearby could change: 1 approved scheme.
    • 12 homes approved nearby, not started; largest 12 at KILMACRENNAN.
    • Kilmacrennan (bus 932, 932A) 414 m away: 5 a day, fewer than one an hour at morning peak.
    • Here (2022 census): 81% owner-occupied (council 70%); 11% of homes empty (council 26%); most built 2001–2010; 74% drive to work (council 63%); population up 2% since 2016.
    • Around here the council decides in a median 51 days (about 7 weeks); 36% are asked for more information.
    • Homes started within 1 km: 23 in the last year, 2 three years before.
    • 22 applications nearby in the last 12 months; 86% approved (council 93%); 23% for work already built (council 24%).
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 27
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.012 Oct 2026
    data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
    dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public13 Oct 2026
    www2.courts.ie—all-rights-reserved13 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.012 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC-BY-4.012 Oct 2026
    transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
    lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)public13 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.013 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…13 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
    gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
    gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 13 Oct 2026, 02:43 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.