PlanningRegister.ie
Planning report · Donegal County Council · 500 m around the house · the last 12 months · 5 Nov 2026, 09:11

Letterkenny Municipal District

55.03751, -7.65406

Homes here mostly date from the 2000s. 43 homes approved 278 m away haven't started.

See on the mapWatch this area

Not held yet for Donegal County Council: zoning and council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BallyboeBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2022: 1 file on Ballyboe2023: 2 files on Ballyboe2024: 2 files on Ballyboe2025: 3 files on Ballyboe2026: 2 files on Ballyboe10 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Protected building1 within 100 m on the council's record (not republished)
Heritage inventory2 within 100 m house; milestone/milepost

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Ramelton (858 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings47The Tanyard; McCloughan Gunn and Co. Solicitors
Monuments1R185038
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 2 Nov 2026, 23:44
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA licensed facilities (LEAP)CC BY 4.02 Nov 2026, 23:44open
Records of Protected StructuresNo licence stated · shown as a yes/no only—open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 94% approved, and 1 in 4 is asked for more information.

New house in a garden or site16 decided · more info asked 25%
94% · council 92%
Approved nearbyDonegal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 16 nearby, 3,872 council-wide

Figure 3

Ballyboe, file by file since 2022

2 of 2 decided extensions on the road were approved. New houses in side gardens or on sites: 5 of 5.

10 planning files on Ballyboe since 2022, by kind and decision.20222023202420252026Extensions, atticsNo number · 2024 · first-floor · approved · 2450035No number · 2024 · rear · approved · 2450036Porches, roofs, otherNo number · 2022 · other work · approved · 2252027No. 34 · 2023 · other work · approved · 2350244No number · 2026 · other work · approved · 2660670New house in a side gardenNo. 27 · 2023 · new house · approved · 235141427No. 49 · 2025 · new house · approved · 256062449No. 54 · 2025 · new house · approved · 2562067No. 35 · 2025 · new house · approved · 2562095No. 59 · 2026 · new house · approved · 266113559
ApprovedRefusedWithdrawn or invalid

10 files with "Ballyboe" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 49 days.

    Comments open: 5 weeks · €20; Council decision: 49 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 44–51 (n=10)49 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off67% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated13 decided home extensions, 3 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 2 appealed approvals were reversed.

    Approvals appealed2 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Letterkenny Municipal District with 8 numbered planning items
    ⌖ the houseWindow closingApproved, not startedApprovedNo decision yet
    1. 13 COYLIN COURT, BRIDGE END OR DRUMMONAGHAN 2661586Approved with conditions · 229 m
    2. 2RADHARC AN CHUAIN 2660670Approved, no sign building has started · 278 m
    3. 354 COYLIN COURT, BALLYBOE 2562067Approved with conditions · 24 m
    4. 455 COYLIN COURT, RAMELTON 2661779No decision yet · 29 m
    5. 5NO. 35 COYLIN COURT, BALLYBOE 2562095Approved with conditions · 74 m
    6. 659 COYLIN COURT, BALLYBOE 2661135Approved with conditions · 110 m
    7. 7THE MALL, RAMELTON 2660093Approved with conditions · 296 m
    8. 8ST. MARY'S TERRACE, RAMELTON 2562125Approved with conditions · 437 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 23 permissions since 2016, 7 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    23 applications lodged within 500 m. Council: 23 approved, 0 refused. After appeals: 23 approved. Of those: 0 signed off, 5 built with the owner's opt-out, 2 started, 15 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT23: lodged → approved23: approved → approved15: approved → no start notice found5: approved → built, owner opted out2: approved → started, not signed off1: approved → ran out23 lodged23 lodged23 approved23 approved23 approved23 approved15 no start notice found15 no start notice found5 built, owner opted out5 built, owner opted out2 started, not signed off2 started, not signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured23 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 5 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-05 2661586: CONDITIONAL — DEMOLITION OF EXISTING DOMESTIC GARAGE (DUE TO DEFECTIVE CONCRETE BLOCKS) TO REAR OF EXISTING DWELLING HOUSE AND CONSTRUtoday10 Nov15 Nov20 Nov25 Nov30 Nov5 Dec2661586: CONDITIONAL — DEMOLITION OF EXISTING DOMESTIC GARAGE (DUE TO DEFECTIVE CONCRETE BLOCKS) TO REAR OF EXISTING DWELLING HOUSE AND CONSTRU · 229 m away · 2026-11-05
    Time to appeal ends
    • Time to appeal ends 5 Nov 2026closes today
      12661586 · CONDITIONAL — DEMOLITION OF EXISTING DOMESTIC GARAGE (DUE TO DEFECTIVE CONCRETE BLOCKS) TO REAR OF EXISTING DWELLING…
      €220 to An Coimisiún Pleanála (€110 observer) · 229 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    43 homes 278 m away were approved Jul 2026 with no start notice yet; the permission runs to Jan 2029.

    RADHARC AN CHUAIN · 43 homes: 43 homes approved Jul 2026, not started202420252026202720282029RADHARC AN CHUAIN · 43 homes278 m · 266067043 homes approved Jul 2026, not started43 homes approved Jul 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 1 within 500 m

    Approved, not started 1

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
    Figure 9

    Applications within 500 m, by year

    Between 4 and 5 a year; busiest 2023. 100% of decisions were approvals.

    2022: 5, 2023: 5, 2024: 4, 2025: 5, 2026: 405102022: 5 approved5’22*2023: 5 approved5’232024: 4 approved4’242025: 5 approved5’252026: 4 approved4’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2022 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 10 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Building work nearby 6 in the last 12 months
    1 not signed off5 no sign-off needed
    • 22 Chestnut Grove, Rathmelton, Donegal, F92 P6Y3 · 23 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 2351779 · 453 m
    • 54 Coylin Court, Rathmelton, Donegal · 24 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 2562067 · 38 m
    • 35 Coylin Court, Rathmelton, Donegal, F92 N840 · 1 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 2562095 · 102 m
    • Bridge End, Ramelton, Donegal · 5 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60570 · 119 m
    • Bridge End, Ramelton, Donegal · 5 Mar 2026 · short notice no sign-off needed · 25/60570 · 129 m
    • 48 Coylin Court, Ramelton, Donegal · 21 Nov 2025 · 1 homes · start notice not signed off · 25/60624 · 140 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Homes coming 43 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Ramelton Community Playgroup Ltd · Crèche27 May 2025 · report · Tusla Early Years Inspectorate569 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 4 Nov 2026, 23:36
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register4 Nov 2026, 23:36open
    How busy is this area About as busy as most of Donegal County Council.
    Homes approved
    Here43
    Council middle0
    Homes started
    Here11
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    50% owner-occupied (council 70%).

    Homes built before 1971
    16% · council 21%
    Homes built since 2001
    51% · council 36%
    Owner-occupied
    50% · council 70%
    Rented
    45% · council 23%
    Children under 15
    23% · council 20%
    Aged 65 and over
    13% · council 18%
    Households with 2+ cars
    31% · council 42%
    Work mainly from home
    12% · council 11%
    This small area (275 people)Donegal

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 057128004

    Bus
    199 m
    Coylin Court · 974 · busiest stop within 500 m: 1 an hour at peak
    Nearest school
    503 m
    Ayr Hill NS Ramelton, 32 pupils
    Schools, stops and the council

    Schools

    • Ayr Hill NS Ramelton · primary · 32 pupils · 503 m
    • Scoil Mhuire · primary · 206 pupils · 522 m

    Stops 6

    • Coylin Court · 974 · 0/hour at peak · 199 m
    • Coylin Court · 974 · 0/hour at peak · 210 m
    • Ramelton · 973, 974 · 1/hour at peak · 213 m
    • Ramelton · 973, 974 · 1/hour at peak · 216 m
    • Lennon Grove · 974 · 0/hour at peak · 449 m
    • Lennon Grove · 974 · 0/hour at peak · 452 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Ayr Hill NS Ramelton · 503 m0% pupils (32)
    • Scoil Mhuire · 522 m+3% pupils (206)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Council consultation portalsPublic5 Nov 2026, 01:15open
    Council meetings (ModernGov)Public5 Nov 2026, 02:33open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Decision 229 m away can be appealed until 5 Nov 2026: appeal?
      Ask for: The decision on the council's website (€220 to appeal).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Ballyboe
    Electoral division
    Rathmelton
    Electoral area
    Milford
    Council
    Donegal County Council
    Everything we found, as a list 8 lines
    • Not protected; no vacant land tax.
    • 1 site nearby could change: 1 approved scheme.
    • 43 homes approved nearby, not started; largest 43 at RADHARC AN CHUAIN.
    • Ramelton (bus 973, 974) 213 m away: 1 an hour at morning peak; 3 from all stops within 500 m.
    • Here (2022 census): 50% owner-occupied (council 70%); 29% of homes empty (council 26%); most built 2001–2010; 64% drive to work (council 63%); population up 4% since 2016.
    • Around here the council decides in a median 50 days (about 7 weeks); 1 in 7 is asked for more information.
    • 10 applications nearby in the last 12 months; 100% approved (council 93%).
    • 11 homes started within 1 km in 3 years (council middle 2).
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 28
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
    www2.courts.ie—© the publisher4 Nov 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.02 Nov 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
    services2.arcgis.comLocal authorities (Record of Protected Structures)No licence stated · flag only—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 5 Nov 2026, 09:11 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.