Planning report · Donegal County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 16:44

L1741

55.10864, -7.47098

Homes here mostly date from the 1970s. 1 planning file on this house, the latest from 2021. 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Donegal County Council: zoning and council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 45 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992). 1 planning file on this house, the latest from 2021.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of LisfannanBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2021: 2151738 · erection of a, approved2021: 1 file on Lisfannan2025: 2 files on Lisfannan3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    2151738 · erection of a · approved 2021 · started, not signed off
    approvedstartedsigned off
On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 95% approved, and 1 in 2 is asked for more information.

New house in a garden or site22 decided · more info asked 41%
95% · council 92%
Approved nearbyDonegal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 22 nearby, 3,872 council-wide

Figure 3

Lisfannan, file by file since 2021

1 of 1 decided extensions on the road were approved.

3 planning files on Lisfannan since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2025 · other extension · approved · 2560821Porches, roofs, otherNo number · 2021 · other work · approved · 2151954No number · 2025 · other work · approved · 2562206New house in a side garden
ApprovedRefusedWithdrawn or invalid

3 files with "Lisfannan" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 45 days.

    Comments open: 5 weeks · €20; Council decision: 45 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 45 days, middle half 44–51 (n=14)45 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off67% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated17 decided home extensions, 3 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around L1741 with 3 numbered planning items
    ⌖ the houseOpen for commentsEmpty land zoned for homesApproved
    1. 1BALLYMACARRY LOWER LUDDAN LISFANNON FIGARY CARROWMULLIN CARRONTLIEVE GLEBE GLEBE LARGE CASTLEQUARTER MAGHERABEG TIEVEBANE CARNASHANNAGH INCH LEVEL CARROWNAMADDY & SPEENOGUE, INISHOWEN 2661837No decision yet · 121 m
    2. 20.8 ha zoned for homesEmpty land zoned for homes · 461 m
    3. 3CARRONTLIEVE CARROWMULLIN FIGARY, LISFANNAN LUDDAN & BALLYMACARRY LOWER 2562206Approved with conditions · 121 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 10 permissions since 2016, 2 show a start notice and 0 have a completion certificate.

    13 applications lodged within 500 m. Council: 10 approved, 3 refused. After appeals: 10 approved. Of those: 0 signed off, 1 built with the owner's opt-out, 1 started, 8 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT10: lodged → approved3: lodged → refused10: approved → approved3: refused → refused8: approved → no start notice found1: approved → built, owner opted out1: approved → started, not signed off13 lodged13 lodged10 approved10 approved3 refused3 refused10 approved10 approved3 refused3 refused8 no start notice found8 no start notice found1 built, owner opted out1 built, owner opted out1 started, not signed off1 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured13 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 9 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-09 2661837: application received — A PERIOD OF 10 YEARS FOR CONSTRUCTION OF APPROXIMATELY 13 KILOMETRES OF STRATEGIC TRUNK WATERMAIN TO REPLACE THE EXISTINtoday6 Nov11 Nov16 Nov21 Nov26 Nov1 Dec2661837: application received — A PERIOD OF 10 YEARS FOR CONSTRUCTION OF APPROXIMATELY 13 KILOMETRES OF STRATEGIC TRUNK WATERMAIN TO REPLACE THE EXISTIN · 121 m away · 2026-11-09
    Comments close
    • Comments close 9 Nov 20268 days left
      12661837 · application received — A PERIOD OF 10 YEARS FOR CONSTRUCTION OF APPROXIMATELY 13 KILOMETRES OF STRATEGIC TRUNK…
      €20 to the council · 121 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 1 within 500 m

    Empty land zoned for homes 1

    • 20.8 ha zoned for homes · no homes built on it yet · 461 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 7

    Applications within 500 m, by year

    Between 1 and 4 a year; busiest 2022. 77% of decisions were approvals.

    2021: 2, 2022: 4, 2023: 3, 2024: 1, 2025: 305102021: 2 approved2’21*2022: 3 approved2022: 1 refused4’222023: 2 approved2023: 1 refused3’232024: 1 refused1’242025: 3 approved3’25
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 2 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 1 in the last 12 months
    1 no sign-off needed
    • Lisfannon, Fahan, Donegal · 17 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · 2561522 · 483 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    0
    How busy is this area Busier than most of Donegal County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here42
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    71% owner-occupied (council 70%).

    Homes built before 1971
    27% · council 21%
    Homes built since 2001
    14% · council 36%
    Owner-occupied
    71% · council 70%
    Rented
    7% · council 23%
    Children under 15
    10% · council 20%
    Aged 65 and over
    48% · council 18%
    Households with 2+ cars
    43% · council 42%
    Work mainly from home
    11% · council 11%
    This small area (181 people)Donegal

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 057063002

    Schools, stops and the council

    Schools

    None nearby.

      Stops 0

        Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 02:24
        SourceLicenceFetchedLink
        Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
        Department of Education school listCC BY 4.027 Oct 2026, 23:04open
        Council consultation portalsPublic1 Nov 2026, 01:08open
        Council meetings (ModernGov)Public1 Nov 2026, 02:24open
        Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. Erection of a (2151738) started Mar 2022, never signed off: is it finished?
          Ask for: The completion certificate, or an engineer's opinion of compliance.
          Seller · solicitor
        2. Application 121 m away open for comments until 9 Nov 2026: comment?
          Ask for: The plans on the council's website (€20 to comment).
          Council
        3. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Lisfannan
        Electoral division
        Fahan
        Electoral area
        Buncrana
        Council
        Donegal County Council
        Everything we found, as a list 8 lines
        • 1 job on this site started but never signed off as finished.
        • Not protected; no vacant land tax.
        • 1 site nearby could change: 1 empty zoned plot.
        • 1 application open for comments nearby; nearest closes 9 Nov 2026.
        • No scheduled public transport within 800 m.
        • Here (2022 census): 71% owner-occupied (council 70%); 42% of homes empty (council 26%); most built 1971–1980; 60% drive to work (council 63%); population down 4% since 2016.
        • Around here the council decides in a median 46 days (about 7 weeks); 1 in 5 is asked for more information.
        • 2 applications nearby in the last 12 months.
        What the terms mean 6 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
        • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 23
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
        data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
        dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
        www2.courts.ie—© the publisher31 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
        transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
        lda.ieLand Development AgencyCC BY 4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
        services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
        services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
        gov.ieDepartment of EducationCC BY 4.027 Oct 2026
        gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 1 Nov 2026, 16:44 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.