PlanningRegister.ie
Planning report · Ireland · 500 m around the house · the last 12 months · 20 Oct 2026, 00:45

21-23 Lower Main Street, Buncrana

55.13338, -7.45331

Homes here mostly date from before 1919. 4 planning files on this house, the latest from 2020. Home extensions nearby almost always get approved (94%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 9 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 4 planning files on this house, the latest from 2021.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 4 planning files on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of ArdaravanBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2021: 2051940 · demolition, approved2020: 2050492 · extension, approved2020: 2050375 · extension, withdrawn or invalid2019: 1851900 · extension, approved2017: 4 files on Ardaravan2018: 8 files on Ardaravan2019: 7 files on Ardaravan2020: 16 files on Ardaravan2021: 14 files on Ardaravan2022: 18 files on Ardaravan2023: 11 files on Ardaravan2024: 11 files on Ardaravan2025: 17 files on Ardaravan2026: 2 files on Ardaravan108 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    2051940 · demolition · approved 2021 · work already done
    approvedstartedsigned off?
  2. 2020
    2050492 · extension · approved 2020 · ran out unbuilt
    approvedstartedsigned off
  3. 2020
    2050375 · extension · withdrawn
    approved?started?signed off?
  4. 2019
    1851900 · extension · approved 2019 · ran out unbuilt
    approvedstartedsigned off
On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Heritage inventory6 within 100 m post box; Buncrana Courthouse

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Buncrana (706 m); Fruit of the Loom International Limited (837 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings46Cloneen; Melbourne House
Monuments1Cist
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 88 on the draft 2027 map; 87 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 19 Oct 2026, 23:51
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 96% approved, and 1 in 4 is asked for more information.

Two-storey rear14 decided · more info asked 29%
100% · council 95%
New house in a garden or site74 decided · more info asked 24%
96% · council 90%
Approved nearbyDONEGAL overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 88 nearby, 5,859 council-wide

Figure 3

Ardaravan, file by file since 2017

32 of 34 decided extensions on the road were approved. New houses in side gardens or on sites: 14 of 14.

108 planning files on Ardaravan since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo. 3 · 2017 · other extension · approved · 1751005No. 38 · 2018 · first-floor · approved · 1851507No number · 2018 · other extension · refused · 1851608No number · 2018 · other extension · approved · 1851642No number · 2020 · two-storey rear · approved · 2050376No. 32 · 2020 · two-storey rear · approved · 2050492No. 5 · 2020 · two-storey rear · approved · 2050733No. 6 · 2020 · attic conversion / dormer · approved · 2051163No. 81 · 2020 · rear · approved · 2051263No number · 2020 · two-storey rear · approved · 2051590No. 5 · 2020 · two-storey rear · approved · 2051780No. 35 · 2020 · two-storey rear · approved · 2051822No. 2 · 2021 · rear · approved · 2150065No number · 2021 · other extension · approved · 2150252No. 12 · 2021 · two-storey rear · approved · 2150286No. 8 · 2021 · two-storey rear · approved · 2150394No. 9A · 2021 · first-floor · approved · 2150588No number · 2021 · other extension · approved · 2151446No number · 2021 · rear · approved · 2152382No. 35 · 2022 · single-storey rear · approved · 2250139No number · 2022 · two-storey side · approved · 2251415No number · 2022 · side · approved · 2251540No. 10 · 2023 · other extension · approved · 2350171No. 43 · 2023 · rear · approved · 2350365No. 10 · 2023 · other extension · approved · 2351546No. 23 · 2023 · other extension · approved · 2351563No. 11 · 2023 · other extension · approved · 2351611No. 7 · 2024 · two-storey rear · approved · 2460438No. 2 · 2024 · side · approved · 2461540No number · 2024 · other extension · approved · 2461689No number · 2025 · side · approved · 2561386No number · 2025 · single-storey rear · approved · 2561811No number · 2025 · single-storey rear · approved · 2562045No number · 2026 · other extension · refused · 2660071Porches, roofs, otherNo. 1 · 2017 · other work · approved · 1750579No. 43 · 2017 · other work · approved · 1751039No number · 2017 · other work · refused · 1751094No. 15A · 2018 · other work · approved · 1850242No number · 2018 · other work · approved · 1850849No number · 2018 · other work · approved · 1851944No number · 2019 · other work · approved · 1950207No number · 2019 · other work · approved · 1950237No. 59 · 2019 · other work · refused · 1951077No. 43 · 2019 · other work · approved · 1951480No. 59 · 2019 · other work · approved · 1951549No. 8 · 2019 · other work · approved · 1951657No number · 2019 · other work · approved · 1951996No. 21 · 2020 · other work · approved · 2050357No number · 2020 · other work · approved · 2050424No. 3 · 2020 · other work · approved · 2050568No. 24 · 2020 · other work · approved · 2050634No number · 2020 · other work · approved · 2050744No number · 2020 · other work · approved · 2051214No. 30 · 2020 · other work · approved · 2051940No number · 2021 · other work · approved · 2150098No number · 2021 · other work · approved · 2150798No. 1 · 2021 · other work · approved · 2151063No number · 2021 · other work · approved · 2151704No number · 2021 · new house · approved · 2152606No number · 2022 · other work · approved · 2250162No number · 2022 · other work · refused · 2250262No. 31 · 2022 · other work · approved · 2250374No number · 2022 · other work · approved · 2250491No number · 2022 · other work · approved · 2250526No. 30 · 2022 · other work · approved · 2250590No number · 2022 · other work · approved · 2250676No. 1 · 2022 · other work · approved · 2251505No number · 2022 · other work · approved · 2251588No number · 2022 · other work · approved · 2251645No number · 2022 · other work · approved · 2252045No number · 2023 · other work · approved · 2350667No number · 2023 · other work · approved · 2350741No number · 2023 · other work · approved · 2350784No number · 2023 · other work · approved · 2350805No number · 2023 · other work · approved · 2350876No number · 2023 · other work · approved · 2351183No number · 2024 · other work · approved · 2460134No. 16 · 2024 · other work · approved · 2460612No number · 2024 · other work · approved · 2460950No number · 2024 · other work · approved · 2461583No number · 2024 · other work · refused · 2461774No number · 2024 · other work · approved · 2461899No number · 2024 · other work · approved · 2461973No number · 2025 · other work · refused · 2560091No number · 2025 · other work · approved · 2560241No number · 2025 · other work · approved · 2560379No number · 2025 · other work · approved · 2560536No number · 2025 · other work · approved · 2560566No number · 2025 · other work · approved · 2560761No number · 2025 · other work · approved · 2560966No number · 2025 · other work · approved · 2561726No number · 2025 · other work · approved · 2562103No number · 2025 · other work · approved · 2562212No number · 2025 · other work · approved · 2562216New house in a side gardenNo. 11 · 2018 · new house · approved · 185052511No number · 2018 · new house · approved · 1850745No number · 2020 · new house · approved · 2051923No. 15 · 2021 · new house · approved · 215032315No number · 2021 · new house · approved · 2152142No number · 2022 · new house · approved · 2250414No number · 2022 · new house · approved · 2250650No number · 2022 · new house · approved · 2250879No number · 2022 · new house · approved · 2251664No. 1 · 2024 · new house · approved · 24610671No. 9 · 2025 · new house · approved · 25612989No number · 2025 · new house · approved · 2562181No. 9 · 2025 · new house · approved · 2562254No number · 2026 · new house · approved · 2660016
ApprovedRefusedWithdrawn or invalid

108 files with "Ardaravan" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 refused
KindAppliedApprovedRefused
Other101

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 50 days. 1 in 6 is asked for more information, which adds about 130 days. Building starts about 9 months after permission.

    Comments open: 5 weeks · €20; Council decision: 50 days; If more info asked (1 in 6): 177 days; Appeal window: 4 weeks; Building starts: 276 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 45–53 (n=71)50 daysIf more info asked (1 in 6)With further information: median 177 days (n=16)177 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 276 days after permission (n=17)276 days after permissionSigned off35% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated87 decided home extensions, 17 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 1 appealed refusals became permissions. 4 of 8 appealed approvals were reversed.

    Refusals appealed1 decided
    1 became permissions
    Approvals appealed8 decided
    4 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 500954 Pending · Ardaravan, Buncrana, Lifford Po, Co. Donegal · 394 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher19 Oct 2026, 01:37open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 4

    What's changing around you?

    Street map around 21-23 Lower Main Street, Buncrana with 15 numbered planning items
    ⌖ the houseRefusedEmpty land zoned for homesNo decision yetApproved
    1. 1MARKET SQUARE, ARDARAVAN 2660071Refused · 141 m
    2. 20.1 ha zoned for homesEmpty land zoned for homes · 26 m
    3. 31.0 ha zoned for homesEmpty land zoned for homes · 60 m
    4. 40.5 ha zoned for homesEmpty land zoned for homes · 85 m
    5. 50.3 ha zoned for homesEmpty land zoned for homes · 110 m
    6. 60.4 ha zoned for homesEmpty land zoned for homes · 162 m
    7. 70.7 ha zoned for homesEmpty land zoned for homes · 164 m
    8. 8MCCARTERS ROAD, BUNCRANA 2661359No decision yet · 61 m
    9. 9ST ORAN'S ROAD, ARDARAVAN 2562045Approved with conditions · 83 m
    10. 10ST. HELEN'S, ST. ORAN'S ROAD 2661280Approved with conditions · 105 m
    11. 11ARDARAVAN, BUNCRANA 2660633No decision yet · 120 m
    12. 12REAR OF MILLBRAE, ARDARAVAN 2660016Approved with conditions · 156 m
    13. 139 ST. ORAN'S PARK, ARDARAVAN 2562254Approved with conditions · 366 m
    14. 14LOOKING GLASS BRAE, BALLYMACARRY LOWER 2661369No decision yet · 374 m
    15. 15COCKHILL RD, ARDARAVAN 2562181Approved with conditions · 393 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 126 permissions since 2016, 23 show a start notice and 4 have a completion certificate.

    145 applications lodged within 500 m. Council: 130 approved, 15 refused. After appeals: 126 approved. Of those: 4 signed off, 4 built with the owner's opt-out, 15 started, 61 with no start notice found, 42 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT130: lodged → approved15: lodged → refused125: approved → approved14: refused → refused4 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal1 refused by the council, approved after an appeal61: approved → no start notice found4: approved → built, owner opted out15: approved → started, not signed off4: approved → signed off42: approved → ran out145 lodged145 lodged130 approved130 approved15 refused15 refused126 approved126 approved18 refused18 refused1 withdrawn1 withdrawn61 no start notice found61 no start notice found4 built, owner opted out4 built, owner opted out15 started, not signed off15 started, not signed off4 signed off4 signed off42 ran out42 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured145 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 10 within 500 m

      Empty land zoned for homes 10

      • 20.1 ha zoned for homes · no homes built on it yet · 26 m
      • 31.0 ha zoned for homes · no homes built on it yet · 60 m
      • 40.5 ha zoned for homes · no homes built on it yet · 85 m
      • 50.3 ha zoned for homes · no homes built on it yet · 110 m
      • 60.4 ha zoned for homes · no homes built on it yet · 162 m
      • 70.7 ha zoned for homes · no homes built on it yet · 164 m
      • 0.2 ha zoned for homes · no homes built on it yet · 176 m
      • 1.6 ha zoned for homes · no homes built on it yet · 183 m
      • 0.2 ha zoned for homes · no homes built on it yet · 184 m
      • 1.6 ha zoned for homes · no homes built on it yet · 186 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 19 Oct 2026, 23:17
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
      Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
      National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
      Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
      Figure 8

      Applications within 500 m, by year

      Between 11 and 23 a year; busiest 2022. 90% of decisions were approvals.

      2017: 8, 2018: 11, 2019: 13, 2020: 18, 2021: 17, 2022: 23, 2023: 16, 2024: 16, 2025: 19, 2026: 401020302017: 6 approved2017: 2 refused8’17*2018: 8 approved2018: 3 refused11’182019: 12 approved2019: 1 refused13’192020: 17 approved2020: 1 refused18’202021: 16 approved2021: 1 refused17’212022: 21 approved2022: 2 refused23’222023: 16 approved16’232024: 14 approved2024: 2 refused16’242025: 17 approved2025: 2 refused19’252026: 3 approved2026: 1 refused4’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 17 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 19 Oct 2026, 02:08
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
      Building work nearby 6 in the last 12 months
      6 not signed off
      • 11 Upper Main Street, Buncrana, Donegal, F93X9C7 · 15 May 2026 · 3 homes · start notice not signed off · 2351611 · 215 m
      • 9 Ardaravan Heights, Buncrana, Donegal · 14 Apr 2026 · 1 homes · start notice not signed off · 2561298 · 461 m
      • Saint Patrick's Road, Buncrana, Donegal, F93 E6P8 · 13 Mar 2026 · 1 homes · start notice not signed off · 24/61689 · 274 m
      • Marian Park, Buncrana, Donegal · 31 Dec 2025 · 2 homes · 7-day notice not signed off · 25/60241 · 407 m
      • 15 Marian Park, Buncrana, Donegal, F93 R7D4 · 6 Dec 2025 · start notice not signed off · 2560536 · 321 m
      • 16 Castle Avenue, Buncrana, Donegal, F93 P6X5 · 22 Oct 2025 · 1 homes · start notice not signed off · 2351361 · 458 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 19 Oct 2026, 01:33
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Little Acorns Montessori Playschool · Crèche4 Sept 2025 · report · Tusla Early Years Inspectorate187 m
      Shelly's Childcare Ltd. · Crèche24 Feb 2026 · report · Tusla Early Years Inspectorate187 m
      Little Acorns Montessori Playschool · Crèche18 Nov 2025 · report · Tusla Early Years Inspectorate505 m
      Little Acorns Nursery · Crèche12 Feb 2025 · report · Tusla Early Years Inspectorate525 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register14 Oct 2026, 23:20open
      How busy is this area Busier than most of Donegal County Council.
      Homes approved
      Here24
      Council middle0
      Homes started
      Here70
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
      National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
      Question 5

      What's the area like?

      Bus
      114 m
      Buncrana · 976 · busiest stop within 500 m: 1 an hour at peak
      Nearest school
      169 m
      St. Mura's National School, 26 pupils
      Schools, stops and the council

      Schools

      • St. Mura's National School · primary · 26 pupils · 169 m
      • Scoil Iosagain · primary · 778 pupils · 177 m
      • Crana College · postprimary · 585 pupils · 331 m
      • Scoil Mhuire Secondary School · postprimary · 885 pupils · 380 m
      • Gaelscoil Bhun Cranncha · primary · 67 pupils · 652 m

      Stops 7

      • Buncrana · 976 · 1/hour at peak · 114 m
      • Buncrana · 976 · 1/hour at peak · 154 m
      • Buncrana · 951, 959, 976 · 1/hour at peak · 370 m
      • Cockhill Road · 964 · 528 m
      • Cockhill Rd · 933, 933A, 964 · 533 m
      • Cockhill Rd · 933, 933A, 951, 959, 976 · 2/hour at peak · 577 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • St. Mura's National School · 169 m-13.3% pupils (26)
      • Scoil Iosagain · 177 m-1.5% pupils (778)
      • Crana College · 331 m-3.1% pupils (585)
      • Scoil Mhuire Secondary School · 380 m+1.1% pupils (885)
      • Gaelscoil Bhun Cranncha · 652 m-2.9% pupils (67)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 19 Oct 2026, 02:28
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
      Council consultation portalsPublic19 Oct 2026, 01:38open
      Council meetings (ModernGov)Public19 Oct 2026, 02:28open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Demolition (2051940): work kept with permission. Done as approved?
        Ask for: The retention grant and an opinion of compliance.
        Seller · solicitor
      2. Extension (2050492) ran out unbuilt in 2025: built anyway?
        Ask for: If built: proof it started in time, and an opinion of compliance.
        Seller · solicitor
      3. Extension (1851900) ran out unbuilt in 2024: built anyway?
        Ask for: If built: proof it started in time, and an opinion of compliance.
        Seller · solicitor
      4. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Ardaravan
      Electoral division
      Buncrana Urban
      Electoral area
      Buncrana
      Everything we found, as a list 8 lines
      • 4 applications on this site; latest 2051940, approved 2021, work already done.
      • Not protected; no vacant land tax.
      • 10 sites nearby could change: 10 empty zoned plots.
      • Buncrana (bus 951, 959) 370 m away: 1 an hour at morning peak; 3 from all stops within 500 m.
      • Here (2022 census): 71% owner-occupied; 29% of homes empty; most built before 1919; 56% drive to work; population down 3% since 2016.
      • 1 home extension within 250 m since 2026. 1 extension refused.
      • Around here the council decides in a median 51 days (about 7 weeks); 40% are asked for more information.
      • 17 applications nearby in the last 12 months; 89% approved (council 93%).
      What the terms mean 8 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • Permission for work already done (Retention permission): An application to keep something that was built without permission.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 27
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.019 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public19 Oct 2026
      www2.courts.ie—© the publisher19 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public19 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.019 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence19 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 20 Oct 2026, 00:45 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.