PlanningRegister.ie
Planning report · Donegal County Council · 500 m around the house · the last 12 months · 20 Oct 2026, 11:58

Dunfanaghy

55.17862, -7.97848

Homes here mostly date from the 2000s. 1 planning file on this house, the latest from 2017. Home extensions nearby almost always get approved (95%).

See on the mapWatch this area

Not held yet for Donegal County Council: zoning and council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 8 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 1 planning file on this house, the latest from 2017.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of FigartBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2017: 1750768 · driveway, withdrawn or invalid2017: 1 file on Figart2018: 2 files on Figart2019: 1 file on Figart2020: 1 file on Figart2021: 1 file on Figart2024: 1 file on Figart7 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2017
    1750768 · driveway · withdrawn
    approved?startedsigned off?
On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Heritage inventory1 within 100 m The Gallery

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings5The Gallery; The Dunfanaghy Workhouse and Famine Museum
Monuments2Megalithic tomb - unclassified; R177209
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 87% approved, and 1 in 2 are asked for more information.

New house in a garden or site61 decided · more info asked 59%
87% · council 90%
Approved nearbyDonegal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 61 nearby, 5,763 council-wide

Figure 3

Figart, file by file since 2017

2 of 2 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

7 planning files on Figart since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo number · 2017 · rear · approved · 1750316No. 2 · 2018 · garage conversion · approved · 1850861Porches, roofs, otherNo number · 2019 · other work · approved · 1950322No number · 2020 · other work · refused · 2050119No number · 2024 · other work · approved · 2460771New house in a side gardenNo number · 2018 · new house · approved · 1851309No number · 2021 · new house · approved · 2151792
ApprovedRefusedWithdrawn or invalid

7 files with "Figart" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 50 days. 1 in 4 is asked for more information, which adds about 137 days. Building starts about 8 months after permission.

    Comments open: 5 weeks · €20; Council decision: 50 days; If more info asked (1 in 4): 184 days; Appeal window: 4 weeks; Building starts: 230 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 mo21 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 48–52 (n=32)50 daysIf more info asked (1 in 4)With further information: median 184 days (n=10)184 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 230 days after permission (n=13)230 days after permissionSigned off54% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated42 decided home extensions, 13 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 1 appealed refusals became permissions. 4 of 11 appealed approvals were reversed.

    Refusals appealed1 decided
    1 became permissions
    Approvals appealed11 decided
    4 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Dunfanaghy with 6 numbered planning items
    ⌖ the houseLarge schemeBuilding startedApprovedNo decision yet
    1. 1DUNFANAGHY, LETTERKENNY PO 2661634No decision yet · 360 m
    2. 21 Éadan Mor, Dunfanaghy CN0145881DLBuilding started · 108 m
    3. 3DUNFANAGHY, LETTERKENNY 2660423Approved with conditions · 310 m
    4. 425 CNOC NA GAOITHE, RINCLEVAN 2562084Approved with conditions · 452 m
    5. 5DUNFANAGHY, LETTERKENNY 2660920Approved with conditions · 479 m
    6. 6MAIN STREET, DUNFANAGHY 2661204No decision yet · 494 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 47 permissions since 2016, 24 show a start notice and 2 have a completion certificate. Most owners opt out of sign-off.

    49 applications lodged within 500 m. Council: 47 approved, 2 refused. After appeals: 47 approved. Of those: 2 signed off, 13 built with the owner's opt-out, 9 started, 14 with no start notice found, 9 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT47: lodged → approved2: lodged → refused47: approved → approved2: refused → refused14: approved → no start notice found13: approved → built, owner opted out9: approved → started, not signed off2: approved → signed off9: approved → ran out49 lodged49 lodged47 approved47 approved2 refused2 refused47 approved47 approved2 refused2 refused14 no start notice found14 no start notice found13 built, owner opted out13 built, owner opted out9 started, not signed off9 started, not signed off2 signed off2 signed off9 ran out9 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured49 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Applications within 500 m, by year

      Between 3 and 7 a year; busiest 2019. 96% of decisions were approvals.

      2017: 4, 2018: 5, 2019: 7, 2020: 6, 2021: 3, 2022: 4, 2023: 4, 2024: 7, 2025: 7, 2026: 205102017: 4 approved4’17*2018: 5 approved5’182019: 7 approved7’192020: 5 approved2020: 1 refused6’202021: 3 approved3’212022: 3 approved2022: 1 refused4’222023: 4 approved4’232024: 7 approved7’242025: 7 approved7’252026: 2 approved2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 6 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 20 Oct 2026, 02:09
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
      Building work nearby 2 in the last 12 months
      2 not signed off
      • 21 Éadan Mor, Dunfanaghy, Donegal, F92 DV20 · 17 Aug 2026 · start notice not signed off · 108 m
      • Hornhead Road, Dunfanaghy, Donegal · 14 Apr 2026 · 56 homes · start notice not signed off · 2461665 · 306 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 20 Oct 2026, 01:45
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
      Homes coming 0 not started
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 20 Oct 2026, 02:09
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
      National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
      Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Dunfanaghy Community Playhouse Ltd · Crèche11 Mar 2026 · report · Tusla Early Years Inspectorateapprox. 375 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register14 Oct 2026, 23:20open
      How busy is this area Busier than most of Donegal County Council.
      Homes approved
      Here67
      Council middle0
      Homes started
      Here107
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
      National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      89% owner-occupied (council 70%).

      Homes built before 1971
      29% · council 21%
      Homes built since 2001
      29% · council 36%
      Owner-occupied
      89% · council 70%
      Rented
      6% · council 23%
      Children under 15
      16% · council 20%
      Aged 65 and over
      18% · council 18%
      Households with 2+ cars
      53% · council 42%
      Work mainly from home
      11% · council 11%
      This small area (201 people)Donegal

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 057057002/02/057057004/057057001

      Bus
      672 m
      Dunfanaghy · 932, 932A, 964
      Nearest school
      331 m
      S N na Croise Naofa, 33 pupils
      Schools, stops and the council

      Schools

      • S N na Croise Naofa · primary · 33 pupils · 331 m
      • Dunfanaghy NS · primary · 24 pupils · 458 m

      Stops 2

      • Dunfanaghy · 932, 932A, 964, 965 · 672 m
      • Dunfanaghy · 932, 932A, 964, 965 · 1/hour at peak · 673 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • S N na Croise Naofa · 331 m+10% pupils (33)
      • Dunfanaghy NS · 458 m-11.1% pupils (24)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 20 Oct 2026, 02:32
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
      Council consultation portalsPublic20 Oct 2026, 01:41open
      Council meetings (ModernGov)Public20 Oct 2026, 02:32open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Figart
      Electoral division
      Dunfanaghy
      Electoral area
      Glenties
      Council
      Donegal County Council
      Everything we found, as a list 8 lines
      • 1 application on this site; latest 1750768, withdrawn.
      • Not protected; no vacant land tax.
      • Nothing nearby looks set to change.
      • No morning-peak service within 500 m; nearest is Dunfanaghy, 673 m away (1 an hour).
      • Here (2022 census): 89% owner-occupied (council 70%); 44% of homes empty (council 26%); most built 2001–2010; 64% drive to work (council 63%); population up 10% since 2016.
      • Around here the council decides in a median 62 days (about 9 weeks); 43% are asked for more information.
      • Homes started within 1 km: 60 in the last year, 1 three years before.
      • 6 applications nearby in the last 12 months.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Permission for work already done (Retention permission): An application to keep something that was built without permission.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.020 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public20 Oct 2026
      www2.courts.ie—© the publisher20 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public20 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.020 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence20 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 20 Oct 2026, 11:58 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.