PlanningRegister.ie
Dublin City Council · 2769/21 · Permission

348 Harold's Cross Road

52 apartments5 storeysAAI Kenilworth LimitedDublin 6W, Dublin City Council

All 54 permitted homes are built (Q1 2025).

Also known as Kenilworth Motors.

  1. 21 Sept 2021Approved
  2. 18 Oct 2021Appealed
  3. 1 Jul 2022Appeal: Approved with conditions
  4. 1 Jul 2022Final approval
  5. 27 Nov 2023Building started
  6. 1 Nov 2024Signed off
Status
Building started
Decision
Approved · 21 Sept 2021
Size
52 apartments · up to 5 storeys
Uses
residential, apartments
Applicant
AAI Kenilworth Limited
Site
2,263 m²
Appeal
ACP 311691 · Approved with conditions

Building progress councils’ figures, Q1 2025

  1. 2022Approved
  2. 2023Building started
  3. 2024First homes signed off2 sign-offs

All 54 permitted homes are built (Q1 2025).

54
homes permitted
54
homes started on site
54
homes completed

completed · under construction · not started · 0 houses and 54 apartments permitted

The scheme

AAI Kenilworth Limited proposes a build-to-rent residential development at 348 Harold's Cross Road. The project involves demolishing existing buildings to construct a part-two to part-five storey building containing 52 apartments. The scheme includes communal amenities, cycle parking, and associated site works.

it involves the redevelopment of a former commercial site into a 52-unit residential scheme

What the register says

Permission for a Build-To-Rent residential development at a c. 0.2319 ha site located at No. 348 Harold’s Cross Road, Dublin 6, D6W VW99, (formerly known as ‘Kenilworth Motors) principally bounded by Laundry Lane to the north, Harold’s Cross Road to the east, Kenilworth Manor to the south, and Rosary Park to the west. The development will principally consist of: the demolition of all one storey, with part mezzanine, buildings (1,164 sqm) and certain boundary walls; the construction of a part-two, part-three, part-four, part-five storey building (total gross floor area of c. 5,163 sqm); (comprising 52 no. apartments ( 4no. studio units; 44 no. 1-bed units; 4 no. 2-bed units, all with balconies or terraces facing east, south and west). The development will also consist of: communal residential amenties (228 sqm) (including lounge, workspace, gym); concierge; plant; circulation space; ESB substation and switch room; 83 no. cycle parking spaces (62 no. at upper ground floor level bike store); and 21 no. external visitor spaces); communal amenity open spaces at upper ground floor level to the southwest (70 sqm); third floor level to the north east (82.5 sqm); and fourth floor level to the east (190 sqm); Public open space to the east (293 sqm); 2 no. car club parking spaces and 5 resident car parking spaces accessed from Harolds Cross Road; alterations to the layout of Laundry Lane including the provision of a pedestrian footpath and service area; sustainable urban drainage system (including green roof, rainwater harvesting and attenuation tanks); waste management area; roof plant, including PV panels; associated hard and soft landscaping; and all other associated site excavation, infrastructural and site development works above and below ground including changes in level, boundary treatments and associated site servicing (foul and surface water drainage and water supply). Access to the scheme will be via Harold’s Cross Road and Laundry Lane

Summary from the register record.

Planning timeline 8 steps

  • 14 May 2021
    Application lodged — Standard
  • 21 Sept 2021
    Council decision — Grant permission
  • 18 Oct 2021
    Appealed to An Coimisiún Pleanála — 311691
  • 1 Jul 2022
    Commission decision — Granted with conditions
  • 1 Jul 2022
    Final approval
  • 27 Nov 2023
    Building started
  • Q1 2025
    Site completed — Site completed
  • 14 Aug 2027
    Approval runs out (estimate)

The site 2,263 m²

Boundary of 348 Harold's Cross Road as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 2 applications in the last 10 years

Appeals inside the site 2 with An Coimisiún Pleanála

Building work started inside the site 1 commencement notice

Other big developments nearby within 2 km

Everything within 1 km on the map →

Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.