- 22 Apr 2022Received
- 6 Oct 2022Approved
- 2 Nov 2022Appealed
- 25 Apr 2024Appeal: Approved with conditions
- 25 Apr 2024Final approval
- 25 Apr 2029Approval runs out
- Status
- Appeal decided — granted No start yet
- Decision
- Approved · 6 Oct 2022
- Size
- 31 apartments · up to 4 storeys
- Uses
- residential, apartments
- Applicant
- Lark Finance Limited
- Site
- 3,445 m²
- Appeal
- ACP 315001 · Approved with conditions
Building progress councils’ figures, Q2 2025
31 homes permitted; building has not started (Q2 2025).
completed · under construction · not started · 0 houses and 31 apartments permitted
The scheme
Lark Finance Limited proposes a residential development at 353 and 363 Blackhorse Avenue in Dublin 7. The project involves the demolition of two existing dwellings to construct a four-storey apartment block containing 31 units. The scheme includes associated site works, car parking, and bicycle storage.
it involves the construction of 31 residential units
What the register says
Planning permission for the proposed development will consist of a residential development of 31 no. residential units comprising of: 1 no. 4 storey apartment block (ranging from 3 to 4 storeys) consisting of 31 no apartment (11 no. 1 bedroom units and 20 no. 2 bedroom units) with balconies/terraces to the south east elevation, 2 no. communal roof terraces will be located at fourth floor level, 1 no ESB substation and switch room, waste storage area entrance lobbies, 2 no. bicycle parking rooms (each with 28 no. spaces, providing 56 spaces in total); landscaping, public lighting, boundary treatment, 25 no. surface level car parking spaces, 10 no surface level bicycle parking spaces, new vehicular access from Villa Park Road, pedestrian access from Villa Park Road and Blackhorse Avenue, playground and all associated site development and engineering works necessary to facilitate the proposed development. The proposed development would also consist of the demolition of the 2 no. existing single storey detached dwellings and associated outbuildings and sheds
Summary from the register record.
Planning timeline 6 steps
- 11 Feb 2022Appealed to An Coimisiún Pleanála — ABP-315001-22
- 22 Apr 2022Application lodged — Standard
- 25 Apr 2024Council decision — Grant
- 25 Apr 2024Commission decision — Granted
- 25 Apr 2024Final approval
- 6 Aug 2029Approval runs out (estimate)
The site 3,445 m²
Boundary of 353 and 363 Blackhorse Avenue as the Dublin councils map it in the housing pipeline.
Planning applications inside the site 2 applications in the last 10 years
Appeals inside the site 2 with An Coimisiún Pleanála
Other big developments nearby within 2 km
- Dominican Convent Campus · 95 homes · 3 storeys · 668 m away
- Tolka Industrial Park · 71 homes · 9 storeys · 1.3 km away
- 76, 76G & 280 Bannow Road · 69 homes · 5 storeys · 1.4 km away
- 52 & 54 Quarry Road · 64 homes · 6 storeys · 1.5 km away
Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.