Status
Building started
Council decision
Approved · 22 Feb 2023
Height
up to 3 storeys
Uses
residential, houses, apartments
Applicant
Walthill Properties Limited · 1 planning application
Site
5,040 m²
Appeal
ACP 316087 · Approved with conditions · 9 Apr 2024

Building progress councils’ figures, Q2 2026

  1. 2024Approved on appeal
  2. 2024Building started
  3. Not yetFirst homes signed off

completed · under construction · not started · 14 houses and 8 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 202522220
Q3 202522220
Q4 202522220
Q1 202622220
Q2 202622220
Source and licence

The scheme

Walthill Properties Limited proposes the demolition of 11 Newbridge Drive and the construction of 22 residential units at Baggotrath House in Sandymount. The development includes 14 houses and a three-storey block containing 8 apartments and duplex units. The project also involves site works and revisions to the existing vehicular access.

What the register says

The development will consist of: The demolition of No.11 Newbridge Drive (a single dwelling with a total gross floor area of 248sq.m) and the construction of 22no. residential units consisting of: a. 14no. houses comprising 12no. 3-bed three storey terraced units, 1no. 4-bed two storey detached unit and 1no. 3-bed 3 storey (part single storey) house b) 4 no. ground floor apartments, comprising of 2no. 1-bed units and 2no. 2-bed units, and 4no. 3-bed duplex units, in a single three storey block, with private amenity space in the form of terraces for the ground floor units and winter gardens for the duplex units. Permission is also sought for minor revisions to the existing shared vehicular access off Newbridge Avenue, with separate access to 1no. detached house only (the future No.11 Newbridge Drive) from Newbridge Drive; associated vehicular and cycle parking; landscaping; and all associated site and development works

Summary from the register record.

Planning timeline 7 steps
  • 20 Dec 2022
    Application lodged — Standard
  • 23 Feb 2023
    Council decision — Grant
  • 21 Mar 2023
    Appealed to An Coimisiún Pleanála — ABP-316087-23
  • 9 Apr 2024
    Commission decision — Granted
  • 9 Apr 2024
    Final approval
  • 11 Sept 2024
    Building started
  • 23 May 2029
    Approval runs out (estimate)

The site 5,040 m²

Boundary of Baggotrath House as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 5 applications in the last 10 years

Appeals inside the site 2 with An Coimisiún Pleanála
Commencement notices inside the site 2

Other big developments nearby within 2 km

Start notices are matched from the national building control register; a start on site can be missed.

Everything within 1 km on the map →

Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.