PlanningRegister.ie
South Dublin County Council · LRD24A/0007 · Permission

Ballycullen Gate

523 homes4 storeysCapami LimitedOldcourt & Kilininny, South Dublin County Council

61 under construction of 523 permitted homes (Q2 2026).

On the planning register as Bohernabreena, Oldcourt and Killininny Development (LRD24A/0007). 108 new homes have sold at Ballycullen Gate since 21 Jun 2023, at a median €440,529 on the Property Price Register (without VAT).

  1. 24 Sept 2024Received
  2. 18 Nov 2024Approved
  3. 10 Dec 2024Appealed
  4. 8 Apr 2025Appeal: Approved with conditions
  5. 12 Feb 2026Building started
Status
Building started
Decision
Approved · 18 Nov 2024
Size
523 homes · up to 4 storeys
Uses
residential, houses, apartments, creche
Applicant
Capami Limited
Site
20.42 ha
Appeal
ACP 321419 · Approved with conditions

Building progress councils’ figures, Q2 2026

  1. 2025Approved
  2. 2026Building started
  3. Not yetFirst homes signed off

61 under construction of 523 permitted homes (Q2 2026).

523
homes proposed
523
homes permitted
61
homes started on site
0
homes completed

completed · under construction · not started · 252 houses and 271 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 202552300
Q3 202552300
Q4 202552300
Q1 2026523150
Q2 2026523610

The scheme

Capami Limited proposes a large scale residential development on a 20.4 hectare site in the townlands of Bohernabreena, Oldcourt, and Killininny. The project includes 523 residential units consisting of houses, duplexes, and apartments, alongside a two-storey childcare facility. The development also involves the demolition of existing structures and the provision of public open space.

it is a large scale residential development of 523 units

What the register says

Capami Ltd. wishes to apply for a seven year planning permission for a Large Scale Residential Development (LRD) on a site measuring c.20.4Ha, located in the townlands of Bohernabreena, Oldcourt, and Killininny, Dublin 24. The development site is located to the east of Bohernabreena Road, north and east of Bohernabreena cemetery, south and south-east of St. Anne's GAA club, south and south-west of the Dodderbrook residential estate, west of the Ballycullen Gate residential development (currently under construction) and west of Oldcourt Road (R113). The proposed development consists of 523 no. residential units comprised of 255 no. 2, 3 & 4 bed, 2 & 3 storey, detached, semi-detached and terraced houses, 206 no. 1, 2 & 3 bed duplex units in 20 no. 2 & 3 storey blocks, and 62 no. 1, 2 & 3 bed apartments in 7 no. 2-3 & 3-4 storey blocks (i.e. Blocks A, B2 & D, and 2 no. Blocks B1 & 2 no. Blocks C), along with a 2 storey childcare facility of c. 457sq.m. Private amenity space for the residential units is provided in the form of rear gardens for houses and ground floor terraces / upper floor balconies for apartments and duplex units. The proposed development provides for a total of c. 7.3Ha of public open space, and c. 5,505sq.m of communal open space associated with proposed residential units. Vehicular access to the development will be via 4 no. access points, as follows: (i) from the west of the site, via 2 no. accesses, located off Bohernabreena Road, (ii) from the north of the site, via 1 no. access at Dodderbrook Place, and (iii) from the east of the site, via Oldcourt Road (R113) and via adjoining residential development at Ballycullen Gate. The proposed development includes for pedestrian and cyclist connections and accesses throughout the proposed development and to adjoining lands to the north at Dodderbrook Avenue and to the north-west into St. Anne's GAA club. The proposed development includes the demolition of all existing structures on site, including 2 no. single storey dwellings and outbuildings/sheds (total demolition area: c. 4,152.06sq.m). The proposed development provides for (i) all associated site development works above and below ground, including 2 no. underground foul sewerage pumping stations, (ii) public open spaces (c. 7.3Ha), (iii) communal open spaces (c. 5,505sq.m), (iv) hard and soft landscaping and boundary treatments, (v) surface car parking (746 no. car parking spaces, including EV parking), (vi) bicycle parking (1,268 no. bicycle parking spaces), (vii) bin & bicycle storage, (viii) public lighting, and (ix), plant / PV panels (M&E), utility services & 5 no. ESB sub-station/kiosks, all on an overall application site area of c.20.4Ha. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany the application

Summary from the register record.

Planning timeline 7 steps

  • 24 Sept 2024
    Application lodged — LRD
  • 18 Nov 2024
    Council decision — Grant
  • 10 Dec 2024
    Appealed to An Coimisiún Pleanála — ABP-321419-24
  • 9 Apr 2025
    Commission decision — Granted
  • 9 Apr 2025
    Final approval
  • 12 Feb 2026
    Building started
  • 6 Jun 2032
    Approval runs out (estimate)

The site 20.42 ha

Boundary of Ballycullen Gate as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 3 applications in the last 10 years

Appeals inside the site 1 with An Coimisiún Pleanála

Building work started inside the site 6 commencement notices

Other big developments nearby within 2 km

Everything within 1 km on the map →

Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.