C. 09 ha landholding
15 homesClear Real Estate Holdings LimitedLucan, South Dublin County Council
Approved Jul 2026; no start notice yet.
- 31 Mar 2026Received
- 28 Jul 2026Approved
- 27 Jul 2031Approval runs out
- Status
- Approved No start yet
- Decision
- Approved · 28 Jul 2026
- Size
- 15 homes
- Applicant
- Clear Real Estate Holdings Limited
- Site
- 9,055 m²
Building progress councils’ figures, Q2 2026
63 homes proposed; none permitted yet (Q2 2026).
completed · under construction · not started
The scheme
What the register says
Permission for development at a c. 0.9 Ha landholding. The landholding comprises 2 No. physically separated, yet proximate sites (referred to as Plot A and Plot B for the purposes of this Planning Application). Plot A measures 0.14 Ha and the main development site is generally bound: to the north by Stratton Court; to the east by Adamstown Park; to the south by Adamstown Avenue; and to the west by Stratton Drive. Plot B measures 0.76 Ha and the main development site is generally bound: to the north by Adamstown Avenue; to the east by Castlegate Vale and Castlegate Downs; to the south by sports surfaces associated with Adamstown Community College, an all-weather sports pitch associated with Adamstown Community Centre and undeveloped lands; and to the west by Adamstown Park. The development will principally consist of the construction of a 63 No. unit residential development (6,096 sq m) across Plot A and Plot B as follows; Plot A: the construction of a 4-storey apartment building (1,208 sq m) comprising 15 No. apartments (8 No. 1-bed units and 7 No. 2-bed units); Plot B: the construction of 48 No. duplex units (24 No. 2-bed units and 24 No. 3-bed units) in 4 No. 3-storey buildings (4,888 sq m). The development will also include: foul and surface water drainage connections; 63 No. car parking spaces; new access road at Plot B connecting Castlegate Vale to Adamstown Park; bicycle parking; ESB substations; hard and soft landscaping; boundary treatments; balconies/terraces facing south, east and west; green roofs; public lighting; bin storage; and all associated site and development works above and below ground
Summary from the register record.
Planning timeline 2 steps
- 1 Jul 2026Application lodged — DZ
- 28 Jul 2026Council decision — Grant permission
The site 9,196 m²
Boundary of C. 09 ha landholding as the Dublin councils map it in the housing pipeline.
Planning applications inside the site 8 applications in the last 10 years
- GrantedC. 09 ha landholding, in the townlands of Gollierstown and Finnstown, Adamstown, LUCAN
- GrantedTownland of Gollierstown, Adamstown, Lucan, Co Dublin
- CommencedAdamstown, Co Dublin
- CommencedIn the townland of Gollierstown, Adamstown, Lucan, Co. Dublin
- GrantedIn the townland of Gollierstown, Adamstown, Lucan, Co. Dublin
- CommencedTownlands of Gollierstown, Adamstown, Lucan, Co. Dublin
- CommencedIn the townland of Gollierstown, Adamstown, Lucan, Co. Dublin
- GrantedTownland of Gollierstown, Adamstown, Lucan, Co Dublin
Appeals inside the site 1 with An Coimisiún Pleanála
Other big developments nearby within 2 km
- Gollierstown · 29 m away
- Adamstown Block G · 184 homes · 9 storeys · 89 m away
- Adamstown District Centre Phase Two · 185 homes · 9 storeys · 89 m away
- Adamstown Strategic Development Zone · 205 homes · 5 storeys · 150 m away
- The Crossings Phase 3 · 214 homes · 9 storeys · 159 m away
- 14 Stratton Drive · 201 m away
- Stratton Way · 217 m away
- Tandy's Lane · 228 m away
Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.