Corballis East
Building: first homes signed off Nov 2026, of 96 homes.
Donabate, Fingal County Council
Email me when the next phase is lodged
- Status
- Building started
- Decision
- Withdraw application · 15 Sept 2022
- Site
- 3.52 ha
Is it built?
- Not yetApproved
- 2024Building started
- 2026First homes signed off1 sign-off
The scheme
What the register says
A 7 No. year permission for development at this 3.50 Ha landholding in Corballis East, Donabate, Co. Dublin, which comprises 2 No. separate sites divided by the Donabate Distributor Road. The western site (3.34 Ha) is generally bounded to the north by greenfield lands, to the south and east by the Donabate Distributor Road and to the west by greenfield lands (subject to a live Planning Application for a mixed-use development as per An Bord Pleanala Case Reference TA06F.311059). The eastern site (0.16 Ha), which is subject to drainage infrastructure works only, is generally bounded to the north by greenfield lands, to the south by a wastewater pumping station and attenuation storage, to the east by greenfield lands and the Balcarrick Golf Course and to the west by greenfield lands and the Donabate Distributor Road. The development, which will have a total Gross Floor Area of 10,891sq m, will consist of: the construction of 96 No. residential units including 61 No. two storey houses (6 No. 2 bed units and 55 No. 3 bed units ranging in size from 78 sq m to 117 sq m) and 7 No. three storey 4 bed houses (150 sq m), with associated private open space in the form of gardens and/or terraces facing all aspects, and 2 No. three storey duplex buildings comprising a total of 28 No. duplex units (14 No. 2 bed units and 14 No. 3 bed units ranging in size from 78 sq m to 134 sq m) with associated balconies/terraces predominantly facing north, south, east and west; and 1 No. two storey creche with associated rooflight to atrium (595 sq m). The development will also comprise of the following on the western site: a vehicular access from the Donabate Distributor Road; internal roads, footpaths and a shared pedestrian and cyclist link; pedestrian connections to the Donabate Distributor Road; pedestrian and vehicular connections to the adjoining site to the west (subject to a live Planning Application for a mixed use development as per An Bord Pleanala Case Reference TAo6F.311059)…
Cut short by the council feed. Full text ↗
Summary from the register record.
Planning timeline
- 31 Aug 2022Received
- 15 Sept 2022Withdraw application
The site 3.52 ha
Boundary of Corballis East from the planning application.
Planning applications inside the site 9 applications in the last 10 years
- Awaiting decisionCorballis East, Donabate, County Dublin
- CommencedCorballis East, Donabate, County Dublin
- Commenced3.28 Ha site in Corballis East, Donabate, Co. Dublin.
- CommencedCorballis East,, Donabate,, Co. Dublin.
- CommencedCorballis East, Donabate, Co Dublin
- CommencedCorballis East, Donabate, Co Dublin
- CommencedCorballis East, Donabate, Co Dublin
- WithdrawnCorballis East, Donabate, Co Dublin
Appeals inside the site 3 with An Coimisiún Pleanála
Other big developments nearby within 2 km
- New Road · withdrawn or invalid · 373 m away
- Ballymastone · first homes signed off 2025 · 411 m away
- Main Street · building started 2026 · 695 m away
- Hearse Road · first homes signed off 2023 · 69 homes · 868 m away
- Semple Woods · first homes signed off 2023 · 76 homes · 872 m away
- Site located off Hearse Road · withdrawn or invalid · 76 homes · 872 m away
- existing · first homes signed off 2026 · 1.0 km away
- The Gallery · first homes signed off 2026 · 1.0 km away