South Dublin County Council · SDZ23A/0043 · SDZ Application

Kishoge Urban Centre

495 apartments7 storeysCairn Homes Properties LimitedClonburris, South Dublin County Council

176 under construction of 497 permitted homes (Q2 2026).

Also known as Clonburris SDZ.

  1. 30 Nov 2023Received
  2. 17 Apr 2024Approved
  3. 25 Sept 2024Building started
  4. 27 Oct 2026Signed off
Status
Building started
Decision
Approved · 17 Apr 2024
Size
495 apartments · up to 7 storeys
Uses
residential, apartments, retail, office, creche
Applicant
Cairn Homes Properties Limited
Site
4.94 ha

Building progress councils’ figures, Q2 2026

  1. 2024Approved
  2. 2024Building started
  3. 2026First homes signed off1 sign-off

176 under construction of 497 permitted homes (Q2 2026).

497
homes permitted
176
homes started on site
0
homes completed

completed · under construction · not started · 0 houses and 497 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 20254971150
Q3 20254971150
Q4 20254972090
Q1 20264973220
Q2 20264971760

The scheme

Cairn Homes Properties Limited proposes a mixed-use development at Kishoge Urban Centre in Clonburris. The project consists of 11 blocks ranging from 3 to 7 storeys, providing 495 residential units alongside retail, employment, and creche facilities. The development includes public open space, an urban plaza, and associated infrastructure.

it involves the construction of 495 residential units

What the register says

Cairn Homes Properties Limited, intend to apply for permission for development at this site of c.5 ha at Development Area 6 Kishoge Urban Centre, sub sector KUC-S4 (including an area of Development Area 9 Kishoge South East, sub sector KSE-S1), Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22. the development will consist of the removal of existing hardstanding and the construction of a mixed-use development arranged in 11 no. blocks, ranging between 3 & 7 storeys, comprising: 495 no. residential units, including 449 no. apartments (216 no. 1 bed units, 46 no. 2 bed 3 person units, 187 no. 2 bed 4 person units and 46 no. duplex units (22 no. 2 bed 4 person units and 24 no. 3 bedroom units), arranged across Blocks A-F; 2,502 sq.m of retail floorspace, including 1 no. large 2 storey retail unit (over an undercroft car park) and 2no. independent retail units at ground floor of Block B; 4,607 sq.m of employment floorspace within a 6 storey building and 2 no. independent employment units at ground floor of Block B and a bike hub, located at ground floor of the employment building; 483 sq.m creche, located at ground floor level of Block E; and 87 sq.m cafe, located within the employment building. Vehicular access to the site will be from the Clonburris Southern Link Street(as permitted by Reg. Ref. SDZ20A/0021). The development will also consist of the provision of public open space, including an urban plaza; hard and soft landscaping including internal roads, cycle and pedestrian routes, pathways and boundary treatments, street furniture, wetland feature, play areas; signage; basement car park (Blocks B-C); undercroft parking (Blocks A, D and retail box) and surface car parking (403 no. spaces in total, including car sharing and accessible spaces; motorcycle parking; electric vehicle charging points); bicycle parking (long and short stay spaces including stands); ESB substations, piped infrastructural services and connections; ducting; plant; waste management provision; SuDS measures (including green roofs); open attenuation pons; sustainability measures; signage; public lighting; and all site development and excavation works above and below ground

Summary from the register record.

Planning timeline 5 steps

  • 30 Nov 2023
    Application lodged — DZ
  • 17 Apr 2024
    Council decision — Grant
  • 17 Apr 2024
    Final approval
  • 6 Mar 2026
    Building started
  • 31 May 2029
    Approval runs out (estimate)

The site 4.94 ha

Boundary of Kishoge Urban Centre as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 5 applications in the last 10 years

Appeals inside the site 2 with An Coimisiún Pleanála

Building work started inside the site 2 commencement notices

Other big developments nearby within 2 km