Building: 28 under construction of 634 homes (Q2 2026).
Cairn Homes Properties LimitedSwords, Fingal County Council
Email me when the next phase is lodged
How the homes are counted634 permitted · 640 applied for
- 634 homes permitted (the Dublin councils' housing pipeline, Q2 2026).
- 640 homes applied for (the Dublin councils' housing pipeline, Q2 2026).
- On the planning register as Estuary West Lands at Holybanks (LRD0018/S3E).
- Status
- Building started
- Council decision
- Approved · 16 Jun 2025
- Applicant
- Cairn Homes Properties Limited · 46 planning applications, 95% granted
- Site
- 13.66 ha
- Appeal
- ACP 323029 · open
Building progress councils’ figures, Q2 2026
- 2025Approved
- 2026Building started
- 2026First homes signed off1 sign-off
634
homes permitted
28
homes started on site
completed · under construction · not started · 132 houses and 502 apartments permitted
Quarter by quarter
| Quarter | Permitted | Under construction | Completed | Completed share |
|---|---|---|---|---|
| Q2 2025 | — | 0 | 0 | |
| Q3 2025 | 0 | 0 | 0 | |
| Q4 2025 | 634 | 0 | 0 | |
| Q1 2026 | 634 | 28 | 0 | |
| Q2 2026 | 634 | 28 | 0 |
Source and licence
The scheme
What the register says
We, Cairn Homes Properties Limited, intend to apply to Fingal County C…
Cut short by the council feed. Full text ↗
Summary from the register record.
Planning timeline 7 steps
- 26 Nov 2024Application lodged — LRD
- 16 Jun 2025Council decision — Grant
- 14 Jul 2025Appealed to An Coimisiún Pleanála — ACP-323029-25
- 1 Oct 2025Commission decision — Withdrawn
- 9 Oct 2025Final approval
- 8 Apr 2026Building started
- 23 Nov 2030Approval runs out (estimate)
The site 13.66 ha
Boundary of Holybanks, Swords as the Dublin councils map it in the housing pipeline.
Planning applications inside the site 6 applications in the last 10 years
- GrantedEstuary West Lands at “Holybanks”, Swords, Co. Dublin
- GrantedSwords Business Campus, Balheary Road, Swords, Co. Dublin, K67 C6H6
- CommencedEstuary West Lands at Holybanks, Swords, Co Dublin
- GrantedAll in or in the vicinity of the townlands of Mainscourt, Roscall, Ri
- Appeal decidedLands locally known as the Celestica/Motorola site, Junction of Glen E
- OtherHolybanks, Swords, Co. Dublin.
Appeals inside the site 11 with An Coimisiún Pleanála
- OtherHolybanks, Swords, Co. Dublin
- Under appealEstuary West Lands at Holybanks, Swords, Co Dublin
- Under appealHolybanks, Swords, Co. Dublin
- Under appealLocated off the coast of Counties Dublin, Meath and Louth
- OtherHolybanks, Swords, Co. Dublin
- OtherMetrolink. Estuary through Swords, Dublin Airport, Ballymun, Glasnevin and City Centre to Charlemont, Co. Dublin
- Granted with conditionsLands locally known as the Celestica/Motorola site, Junction of Glen Ellan Road and Balheary Road, and at/on Balheary Road, Swords, Co. Dublin.
- Granted with conditionsLands to the south of Rathbeale Road and to the north and south of Main Street, Mooretown Distributor Road, Celestica/Motorola site, Swords, Co. Dublin. (www.mooretownshd.ie)
- WithdrawnEstuary West Lands at Holybanks, Swords, Co. Dublin. (www.holybanksshdplanning.com)
- Granted with conditionsLands to the north of Rathbeale Road and to the west of and north of Miller?s Avenue and Glen Ellan Road, Oldtown, Swords, Co. Dublin. (www.oldtownshd.ie)
- Granted with conditionsAlong existing R132 situated between Lissenhall Interchange and Pinnockhill Junction, to the east of Swords Town Centre, Co. Dublin
Commencement notices inside the site 5
- CommencedBlock 06, Holybanks Place, Glen Ellan Road,, Swords, Fingal, Swords, Dublin
- CommencedHolybanks, Swords, Dublin
- CommencedBlock 1, Holybanks Boulevard, Glen Ellan Road., Swords, Fingal
- CommencedHolybanks, Swords, Fingal
- CommencedBlock 4 Holybanks, Holybanks Drive and Holybanks Place, Glen Ellan Road, Swords, Fingal
Other big developments nearby within 2 km
- Mill · 1.2 km away
- Swords Business Park · 1.4 km away
- Mai · first homes signed off 2023 · 1.5 km away
- 2 No. sites totalling approximately 6.34 Ha in the townland · building started 2026 · 1.6 km away
- Main Street · building started 2024 · 1.6 km away
Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.