PlanningRegister.ie
Dublin City Council · 3861/24 · Permission

62-64 Fenian Street

82 apartments3 storeysGold Run Properties Ltd.Dublin 2, Dublin City Council

Approved on appeal May 2025.

Also known as 1-3 Sandwith Street Upper, 2-11 Bass Place.

  1. 17 Jun 2024Received
  2. 18 Dec 2024Approved
  3. 23 Jan 2025Appealed
  4. 28 May 2025Appeal: Approved with conditions
  5. 28 May 2025Final approval
  6. 28 May 2030Approval runs out
Status
Appeal decided — granted No start yet
Decision
Approved · 18 Dec 2024
Size
82 apartments · up to 3 storeys
Uses
residential, apartments, retail
Applicant
Gold Run Properties Ltd.
Site
1,912 m²
Appeal
ACP 321759 · Approved with conditions

Building progress councils’ figures, Q4 2025

11 homes proposed; none permitted yet (Q4 2025).

11
homes proposed
0
homes permitted
0
homes started on site
0
homes completed

completed · under construction · not started · 0 houses and 0 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 20251100
Q3 20251100
Q4 2025000

The scheme

Gold Run Properties Ltd. proposes a revision to a previously granted development at Fenian Street, Bass Place and Sandwith Street Upper. The scheme includes the demolition of 11 Bass Place and the construction of 82 apartments across three blocks, alongside retail and gym facilities.

it involves a significant residential development of 82 units.

What the register says

PERMISSION For a revision to the previously granted reg. ref. 3164/23, including. Extending the application site from c.0.183ha to c. 0.190 ha, which now includes for the demolition of 11 Bass place an end of terrace 2 Storey house in addition to those previously granted permission for demolition and replacing the previously granted 3 storey, Block 2 aspect, which incorporated a gym / yoga studio, with a larger footprint 3 storey residential block providing 8 one bed apartments with balconies facing north west, west and south, and a ground floor garden / balcony to the east. Accordingly, omission of Condition 5 referring to the yoga / gym use of this block is also sought. Modifications are sought to the ground, basement, 6th floor and roof terrace of Block 1 to include the relocation of the bin store serving all blocks to the basement / lower ground (19.5sqm) together with a new backup generator room (20sqm) for the life safety systems, provision at ground floor of a gym facility facing Bass Place and a coffee / retail outlet to the south west corner facing Fenian Street, provision of an additional one bedroom apartment at ground floor facing Bass Place with a western facing balcony and relocation of the ESB Substation & switch room from the western façade at Bass Place to the eastern façade laneway, including minor layout alterations to the previously granted one bedroom ground floor apartment and eastern facing balcony on the eastern façade. Proposed minor increase to the 6th floor area (additional 12sqm) to facilitate provision of a 3 bedroom and 1 bedroom apartment in the area previously proposing two 2 bedroom apartments. Accordingly the omission of condition 4 is also sought. Minor revision to the roof terrace of Block 1 to include a cold water storage tank and ancillary plant. Modifications and minor extension at ground (7.65sqm) first floor (5.4sqm) & second floor (2.5sqm) to Block 3 together with replacement of the ground floor Bin and Bicycle store with a new 1 bedroom apartment with a south facing balcony. A new total of 82 apartments is proposed, consisting of 65 units in Block 1 (consisting of 27 one bedroom, 37 two bedroom & 1 three bedroom units) 8 one bedroom apartments in Block 2 and 9 apartments in Block 3 (consisting of 4 one bedroom, 3 two bedroom & 2 three bedroom units). Together with minor modifications to the public and communal open space areas. All at 62-64, Fenian Street, Nos. 2,3,4,9,10 & 11 Bass Place and Nos. 1-3 Sandwith Street Upper, Dublin

Summary from the register record.

Planning timeline 6 steps

  • 17 Jun 2024
    Application lodged — Standard
  • 23 Jan 2025
    Appealed to An Coimisiún Pleanála — ABP-321759-25
  • 28 May 2025
    Commission decision — Granted
  • 28 May 2025
    Final approval
  • 18 Dec 2025
    Council decision — Grant
  • 13 Apr 2029
    Approval runs out (estimate)

The site 1,912 m²

Boundary of 62-64 Fenian Street as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 2 applications in the last 10 years

Appeals inside the site 1 with An Coimisiún Pleanála

Other big developments nearby within 2 km

Everything within 1 km on the map →