PlanningRegister.ie
Dublin City Council · 4115/21 · Permission

Former Murphy and Gunn Site

97 apartments6 storeysCharlemont Project Limited(currently Autovision) and the former St Joseph's Junior Education Centre site., Dublin City Council

Also known as Autovision Site, St Joseph's Junior Education Centre Site.

  1. 17 Dec 2021Received
  2. 18 Feb 2022Refuse permission
  3. 16 Mar 2022Appealed
  4. 26 Jul 2023Appeal: Granted with conditions
  5. 26 Jul 2023Final grant
  6. 17 Sept 2026Commenced
Status
Commenced
Decision
Refuse permission · 18 Feb 2022
Size
97 apartments · up to 6 storeys
Uses
residential, apartments
Applicant
Charlemont Project Limited
Site
4,093 m²
Appeal
ACP 313048 · Granted with conditions
On site
Commencement notice SN0014832DC · 17 Sept 2026

Building progress as the Dublin councils report it, Q2 2026

74 homes permitted; building has not started (Q2 2026).

97
homes proposed
74
homes permitted
0
homes started on site
0
homes completed

completed · under construction · not started · 0 houses and 74 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 20259700
Q3 20259700
Q4 20259700
Q1 20269700
Q2 20267400

The scheme

Charlemont Project Limited proposes a build-to-rent residential development at the former Murphy and Gunn site on Milltown Road. The scheme involves demolishing existing buildings to construct 97 apartments across three blocks ranging from three to six storeys in height.

it involves the redevelopment of a significant former commercial and educational site

What the register says

The proposed development will consist of the following: Demolition of the existing buildings on site, with a total combined gross floor area (GFA) of 1,739 sq.m; Construction of a Build-to-Rent (BTR) residential development, comprising 97 no. BTR apartments with a mix of 48 no. 1 bed units and 49 no. 2 bed units in three no. blocks of part 3, part 4, part 5 and part 6 storeys in height, over basement level, including resident support and amenity facilities. The total GFA, including the basement level, of the proposed development is 9,216 sq.m; Block A, fronting Milltown Road, comprises 23 no. BTR units including 9 no. 1 bed units and 14 no. 2 bed units in a part 3, part 4 and part 5 storey building, over a basement level. Block A and Block B will be connected by a bridge link from first to fourth floor levels. Resident support and amenity facilities are proposed at ground floor and basement level of Block A. Balconies are proposed on the north, east and south elevations; Block B adjoins Block A to the east and Block C to the west, comprises 34 no. BTR units including 14 no. 1 bed units and 20 no. 2 bed units, in a part 4, part 5 and part 6 storey building, over a basement level. Balconies are proposed on the north and south elevations, and terraces are proposed on the south elevation; Block C adjoins Block B to the east, comprises 40 no. BTR units including 25 no. 1 bed units and 15 no. 2 bed units, in a part 4, part 5 and part 6 storey building, over a basement level. Balconies are proposed on the north and south elevations, and terraces are proposed on the south and west elevations; The development includes ancillary resident support and amenity facilities for the BTR residential units with a total floor area of 302 sq.m, including a co-working area, meeting room, coffee dock, lounge and concierge at ground floor level and a gym, shared kitchen, media room and parcel store at basement level; The proposal includes communal open space and public open space, including improvements to the public realm and a shared space with an entrance plaza / set down area on the existing access road from Milltown Road; The basement level contains 47 no. car parking spaces, 2 no. motorcycle spaces and 150 no. cycle spaces. The basement level also includes bin storage, cores and plant rooms; The proposal includes 54 no. cycle parking spaces (including 4 no. cargo spaces) at surface level, a turning point, a new vehicular access to the basement level from Milltown Road, and associated improvements to Milltown Road (which includes alterations to the existing footpaths / public road, with relocation of the existing pedestrian crossing and bus stop, which are external to the planning application site boundary and subject to agreement with the Planning Authority); The proposal includes an ESB substation and associated set down area, landscaping, boundary treatment, lighting, PV panels, site services and all associated site works

On this list because it is 20 homes or more on the Dublin councils' housing pipeline. Name and summary derived from the register record on 27 Sept 2026; the facts are the council's.

Planning timeline 7 steps

  • 17 Dec 2021
    Application lodged — Standard
  • 18 Feb 2022
    Council decision — Refuse
  • 16 Mar 2022
    Appealed to An Coimisiún Pleanála — ABP-313048-22
  • 26 Jul 2023
    Commission decision — Granted
  • 26 Jul 2023
    Final grant of permission
  • 17 Sept 2026
    Building started — BCMS commencement notice
  • 8 Sept 2028
    Permission expires (estimate) — Estimated permission expiry

The site 4,093 m²

Boundary of Former Murphy and Gunn Site as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 3 applications in the last 10 years

Appeals inside the site 2 with An Coimisiún Pleanála

Building work started inside the site 1 commencement notice

Around Former Murphy and Gunn Site this application first, then everything within 1 km

Explore from here
Click a dot to open its row.
Loading planning applications…
Free · during launch · limited time

Full planning report for 53.31503, -6.24686

Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.

No account, no payment. Not a statutory planning search.

Other big developments nearby within 2 km

Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.