Building: first homes signed off Jul 2023, of 69 homes; approved Aug 2021.
Dublin 15, Fingal County Council
Email me when the next phase is lodged
- Status
- Building started
- Decision
- Approved · 20 Jul 2021
- Site
- 8.20 ha
Building progress councils’ figures, Q1 2025
- 2021Approved
- 2022Building started
- 2023First homes signed off1 sign-off
Source and licence
The scheme
What the register says
We, Glenveagh Homes Ltd, intend to apply for planning permission for development at this site of c.7.71 ha at Hollywoodrath Road (R121) in Hollystown Dublin 15. The site is bound by the R121 to the south and east with emerging residential areas of Hollywoodrath beyond the R121; existing residential areas of Redwood and The Oaks to the north and east; and the remaining former Hollystown Golf Course Lands to the west. The proposed development will consist of: 69 no. houses comprising 52 no. 2-storey houses and 17 no. 3-storey houses (13 no. 2-bed units, 39 no. 3-bed units, 17 no. 4-bed units), private open spaces (including terraces at first and second floor level), carports incorporated into the footprint of each dwelling (providing 125 no, parking spaces) that also accommodate bike storage (138 no. cycle spaces) and refuse storage, and all associated roads, services, visitor parking (13 no. car spaces and 8 no. cycle spaces), public open spaces (Class 2), changes in level, hard and soft landscaping and boundary treatments where required on a residential area of c.1.94 ha. The proposed development also includes: 1. The construction of a new foul outfall sewer (c.0.97 ha), approx. 3km in length to connect to the existing 600mm diameter foul sewer to the south of Powerstown Road which will include decommissioning of the existing Pump House south of Hollystown Park. 2. The construction of a new vehicular entrance off Hollywoodrath Road (R121), a new footpath and cycle path along the northern and western side of the R121 along the site frontage extending south to the existing Toucan crossing facility over the R121, and provision of 2 no. new Toucan crossings on the R121 (c.0.53 ha). 3. The development of proposed (Class 1) public open space including walking routes, seating areas, kick about area, playground, dog park, associated landscaping works including planting, changes in level and boundary treatments, and 10 no, public cycle parking spaces (c.3…
Cut short by the council feed. Full text ↗
Summary from the register record.
Planning timeline 6 steps
- 5 Mar 2021Application lodged — Standard
- 20 Jul 2021Council decision — Grant permission
- 24 Aug 2021Final approval
- 3 Feb 2022Building started
- Q1 2024Site completed — Site completed
- 24 Aug 2025Approval runs out (estimate)
The site 8.20 ha
Boundary of Hollystown Dublin 15 as the Dublin councils map it in the housing pipeline.
Planning applications inside the site 4 applications in the last 10 years
Appeals inside the site 4 with An Coimisiún Pleanála
- OtherLands to the north west of Tyrrelstown Public Park, townland of Kilmartin, Dublin 15
- OtherLands west of the R121 Church Road, townlands of Kilmartin and Hollystown, Dublin 15
- OtherLands west of the R121 Church Road, Kilmartin, Tyrrelstown, townland of Hollystown, Dublin 15
- Granted with conditionsLands at Hollystown-Kilmartin, Townlands of Hollystown, Kilmartin, Hollywoodrath, Cruiserath, Yellow Walls, Powerstown, and Tyrrelstown, Dublin 15. (www.hollystown2shd.ie)
Commencement notices inside the site 2
Other big developments nearby within 2 km
- Hollystown-Kilmartin · first homes signed off 2024 · 580 homes · 392 m away
- Within the curtilage of Hollywoodrath House · refused 2023 · 96 homes · 420 m away