South Dublin County Council · SD22A/0096 · Permission

Muldowney's Pub

Building: all 23 apartments are under construction (Q2 2026).

3 storeysLorat Trading Ltd.Rathcoole, South Dublin County Council

Email me when the next phase is lodged

How the homes are counted23 permitted · 21 applied for
  • 23 apartments permitted (the Dublin councils' housing pipeline, Q2 2026).
  • 21 apartments applied for (the application on the planning register).
Status
Building started
Council decision
Approved · 17 Apr 2023
Height
up to 3 storeys
Uses
residential, apartments
Applicant
Lorat Trading Ltd.
Site
5,891 m²
Appeal
ACP 317122 · Invalid · 15 May 2023

Building progress councils’ figures, Q2 2026

  1. 2023Approved
  2. 2025Building started
  3. Not yetFirst homes signed off

completed · under construction · not started · 2 houses and 21 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 20252300
Q3 20252300
Q4 20252300
Q1 20262300
Q2 202623230
Source and licence

The scheme

Lorat Trading Ltd. proposes the demolition of existing structures and the renovation of cottages and Muldowney's Pub on Main Street, Rathcoole. The development includes the construction of 21 residential units across two three-storey blocks. The project also provides for pedestrian and vehicular access, car parking, and bicycle spaces.

What the register says

Demolition of some of the existing structures on site to include a portion of an existing rubble wall; the rear extension of an existing cottage; existing structures, storerooms, and sheds to the west and north of Muldowney's Pub; the reconfiguration, renovation, and extension of the existing cottages on site to provide for 2 two bedroom units; the reconfiguration and renovation of Muldowney's Pub and storage yard; the construction of 21 residential units within 2 three storey blocks to the rear and side of Muldowney's Pub as follows: Block A will provide 6 one bedroom units, giving a total of 6 apartments in this building; Block B will provide for a mix of 3 one bedroom and 12 two bedroom units, giving a total of 15 units within this Block; private open space will be provided in the form of balconies with communal open space provided in the centre of the site. The development will also include the provision of a pedestrian access from Main Street and a pedestrian and vehicular access via the existing car-park entrance to the rear of Muldowney's Pub; Provision of 32 carparking spaces and 44 bicycle spaces, all ancillary hard and soft landscaping, boundary treatment, ESB sub-station, signage, bin and bike stores and all engineering and site development works necessary to facilitate the development

Summary from the register record.

Planning timeline 7 steps
  • 5 Apr 2022
    Application lodged — Standard
  • 17 Apr 2023
    Council decision — Grant
  • 15 May 2023
    Appealed to An Coimisiún Pleanála — 317122
  • 15 May 2023
    Commission decision — invalid
  • 23 May 2023
    Final approval
  • 28 Jul 2025
    Building started
  • 6 Jul 2028
    Approval runs out (estimate)

The site 5,891 m²

Boundary of Muldowney's Pub as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 6 applications in the last 10 years

Appeals inside the site 3 with An Coimisiún Pleanála
Commencement notices inside the site 2

Other big developments nearby within 2 km

Start notices are matched from the national building control register; a start on site can be missed.