Building: all 23 apartments are under construction (Q2 2026).
3 storeysLorat Trading Ltd.Rathcoole, South Dublin County Council
Email me when the next phase is lodged
How the homes are counted23 permitted · 21 applied for
- 23 apartments permitted (the Dublin councils' housing pipeline, Q2 2026).
- 21 apartments applied for (the application on the planning register).
- Status
- Building started
- Council decision
- Approved · 17 Apr 2023
- Height
- up to 3 storeys
- Uses
- residential, apartments
- Applicant
- Lorat Trading Ltd.
- Site
- 5,891 m²
- Appeal
- ACP 317122 · Invalid · 15 May 2023
Building progress councils’ figures, Q2 2026
- 2023Approved
- 2025Building started
- Not yetFirst homes signed off
completed · under construction · not started · 2 houses and 21 apartments permitted
Quarter by quarter
| Quarter | Permitted | Under construction | Completed | Completed share |
|---|---|---|---|---|
| Q2 2025 | 23 | 0 | 0 | |
| Q3 2025 | 23 | 0 | 0 | |
| Q4 2025 | 23 | 0 | 0 | |
| Q1 2026 | 23 | 0 | 0 | |
| Q2 2026 | 23 | 23 | 0 |
Source and licence
The scheme
Lorat Trading Ltd. proposes the demolition of existing structures and the renovation of cottages and Muldowney's Pub on Main Street, Rathcoole. The development includes the construction of 21 residential units across two three-storey blocks. The project also provides for pedestrian and vehicular access, car parking, and bicycle spaces.
What the register says
Demolition of some of the existing structures on site to include a portion of an existing rubble wall; the rear extension of an existing cottage; existing structures, storerooms, and sheds to the west and north of Muldowney's Pub; the reconfiguration, renovation, and extension of the existing cottages on site to provide for 2 two bedroom units; the reconfiguration and renovation of Muldowney's Pub and storage yard; the construction of 21 residential units within 2 three storey blocks to the rear and side of Muldowney's Pub as follows: Block A will provide 6 one bedroom units, giving a total of 6 apartments in this building; Block B will provide for a mix of 3 one bedroom and 12 two bedroom units, giving a total of 15 units within this Block; private open space will be provided in the form of balconies with communal open space provided in the centre of the site. The development will also include the provision of a pedestrian access from Main Street and a pedestrian and vehicular access via the existing car-park entrance to the rear of Muldowney's Pub; Provision of 32 carparking spaces and 44 bicycle spaces, all ancillary hard and soft landscaping, boundary treatment, ESB sub-station, signage, bin and bike stores and all engineering and site development works necessary to facilitate the development
Summary from the register record.
Planning timeline 7 steps
- 5 Apr 2022Application lodged — Standard
- 17 Apr 2023Council decision — Grant
- 15 May 2023Appealed to An Coimisiún Pleanála — 317122
- 15 May 2023Commission decision — invalid
- 23 May 2023Final approval
- 28 Jul 2025Building started
- 6 Jul 2028Approval runs out (estimate)
The site 5,891 m²
Boundary of Muldowney's Pub as the Dublin councils map it in the housing pipeline.
Planning applications inside the site 6 applications in the last 10 years
- RefusedHayden House, (D24 K793) and cottages (D24 T326 and D24 H981), forming part of the development site at Muldowney's Pub, Main Street, Rathcoole, Co. Dublin., D24 K793
- WithdrawnHayden House, (D24 K793) and cottages (D24 T326 and D24 H981), forming part of the development site at Muldowney's Pub, Main Street, Rathcoole, Co. Dublin., D24 K793
- WithdrawnHayden House (D24 K793) and cottages (D24 T326 and D24 H981, forming part of the development site, at Muldowney's Pub, Main Street, Rathcoole, Co. Dublin, D24 K793
- CommencedMuldowney’s Pub, Main Street, Rathcoole, Co. Dublin, D24 AE33
- CommencedMuldowney's Pub, Main Street, Rathcoole, Co. Dublin
- GrantedScoil Chrónáin, Lands Opposite Rathcoole Community Centre, Rathcoole, Dublin
Appeals inside the site 3 with An Coimisiún Pleanála
Commencement notices inside the site 2
Other big developments nearby within 2 km
- Rathcoole Courthouse · first homes signed off 2023 · 324 m away
- Lands East of Tay Lane · building started 2024 · 58 homes · 4 storeys · 354 m away
- Stoney Hill Road Development · refused 2026 · 176 homes · 3 storeys · 402 m away
- Mill Road Development · first homes signed off 2025 · 274 homes · 8 storeys · 814 m away
- Drury Mills and Drury Park Extension · building started 2026 · 73 homes · 4 storeys · 1.0 km away
- Rathmill Manor Extension · approved 2021 · 98 homes · 4 storeys · 1.3 km away
- Fortunestown Lane and Parklands Parade · approved 2024, no start notice · 86 homes · 9 storeys · 1.8 km away
- Fortunestown Lane Development · approved 2022 · 524 homes · 3 storeys · 1.8 km away
Start notices are matched from the national building control register; a start on site can be missed.
Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.