48 apartments3 storeysCairn Homes Properties LimitedSouth Dublin County Council

All 48 permitted homes are built (Q1 2026).

Also known as Taobh Chnoic.

  1. 9 Jun 2023Received
  2. 12 Jan 2024Approved
  3. 20 Feb 2024Final approval
  4. 3 Sept 2024Building started
  5. 16 Oct 2025Signed off
Status
Building started
Decision
Approved · 12 Jan 2024
Size
48 apartments · up to 3 storeys
Uses
residential, apartments
Applicant
Cairn Homes Properties Limited
Site
3.38 ha

Building progress councils’ figures, Q1 2026

  1. 2024Approved
  2. 2024Building started
  3. 2025First homes signed off4 sign-offs

All 48 permitted homes are built (Q1 2026).

48
homes permitted
48
homes started on site
48
homes completed

completed · under construction · not started · 0 houses and 48 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 202548480
Q3 202548480
Q4 202548480
Q1 202648048

The scheme

Cairn Homes Properties Limited proposes the construction of 48 duplex and apartment units in Newcastle South. The development includes the second phase of the Taobh Chnoic public park and associated infrastructure. The site is located south of Main Street and east of Athgoe Road.

it involves the construction of 48 dwellings and a public park

What the register says

Construction of 48 dwellings and open space consisting of (a) 48 duplex/apartment units in 4 three storey buildings comprising 24 two bedroom apartments and 24 three bedroom, (2-storey duplex units) all with terrace; (b) Provision of c.1.74 hectares of second phase of Taobh Chnoic public park, hard and soft landscaping (including public lighting & boundary treatment), c.1,665 sq.m of communal amenity space for duplex apartments; along with single-storey bicycle/bin stores; (c) Vehicular access will be from permitted 'Graydon' (TA06S.305343) 'Newcastle Boulevard' to the east; Provision of 73 car parking spaces and 144 bicycle spaces and all internal roads, cycleways, and paths; (d) Surface water attenuation measures, connection to water supply, and provision of foul drainage infrastructure to Irish Water specifications and all ancillary site development/construction/landscaping works on site of c.3.27 hectares, located to the south of Main Street and east of Athgoe Road and to the west of 'Graydon,' within the townland of Newcastle South

Summary from the register record.

Planning timeline 6 steps

  • 9 Jun 2023
    Application lodged — Standard
  • 12 Jan 2024
    Council decision — Grant
  • 20 Feb 2024
    Final approval
  • 3 Sept 2024
    Building started
  • Q1 2026
    Site completed — Site completed
  • 5 Apr 2029
    Approval runs out (estimate)

The site 3.38 ha

Boundary of Newcastle South as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 8 applications in the last 10 years

Appeals inside the site 11 with An Coimisiún Pleanála

Building work started inside the site 5 commencement notices