Fingal County Council · F21A/0378 · Permission

Nos. 1

Building: first homes signed off Sep 2024, of 59 homes; approved May 2022.

Portmarnock, Fingal County Council

Email me when the next phase is lodged

Status
Building started
Council decision
Approved · 17 Feb 2022
Site
1.43 ha
Appeal
ACP 313039 · Withdrawn · 28 Apr 2022

Building progress councils’ figures, Q1 2025

  1. 2022Approved
  2. 2022Building started
  3. 2024First homes signed off3 sign-offs
Source and licence

The scheme

What the register says

The demolition of the existing no. 3 Station Road (a habitable house) and associated garages and outhouses and the development of 59 dwellings consisting of 1 no. Type A detached, two storey, 4 bedroom house (TA01), 25 no. Type B terraced two storey, 3 bedroom houses (8 no. TB01 end of terrace houses, 15 no. TB02 mid-terrace houses and 2 no. TB03 end of terrace, side entrance houses). 4 no. Type C three storey, 4 bedroom semidetached houses (3 no TC01 and 1 no. TC020) and 29 no. apartments in two blocks. Block A is three and four storeys and contains 18 no apartments consisting of 11 no. two bedroom units and 7 no. one bedroom units with balconies and terraces on the north, east and south elevations. Block B is three storeys and contains 11 no apartments consisting of 5 no. two bedroom units and 6 no. one bedroom units with balconies and terraces on the south and west elevations. The proposed development is accessed from Station Road and includes all associated site development and infrastructural works including the retention of the existing access to no. 3 Station Road, a new access onto Station Road which necessitates the moving of the existing pedestrian crossing and associated works to the public road, open space, landscaping, car parking, ESB substation, bin and bike storage on a 1.35 ha site. AI received 20/12/21 AI deemed significant revised public notices (SAI) received 20/01/22…

Cut short by the council feed. Full text ↗

Summary from the register record.

Planning timeline 7 steps
  • 13 Jul 2021
    Application lodged — Standard
  • 17 Feb 2022
    Council decision — Grant permission
  • 16 Mar 2022
    Appealed to An Coimisiún Pleanála — 313039
  • 28 Apr 2022
    Commission decision — Withdrawn
  • 28 Apr 2022
    Final approval
  • 21 Dec 2022
    Building started
  • Q4 2024
    Site completed — Site completed

The site 1.43 ha

Boundary of Nos. 1 as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 7 applications in the last 10 years

Appeals inside the site 3 with An Coimisiún Pleanála
Commencement notices inside the site 4

Other big developments nearby within 2 km

Start notices are matched from the national building control register; a start on site can be missed.