Nos. 1
Building: first homes signed off Sep 2024, of 59 homes; approved May 2022.
Portmarnock, Fingal County Council
Email me when the next phase is lodged
- Status
- Building started
- Council decision
- Approved · 17 Feb 2022
- Site
- 1.43 ha
- Appeal
- ACP 313039 · Withdrawn · 28 Apr 2022
Building progress councils’ figures, Q1 2025
- 2022Approved
- 2022Building started
- 2024First homes signed off3 sign-offs
Source and licence
The scheme
What the register says
The demolition of the existing no. 3 Station Road (a habitable house) and associated garages and outhouses and the development of 59 dwellings consisting of 1 no. Type A detached, two storey, 4 bedroom house (TA01), 25 no. Type B terraced two storey, 3 bedroom houses (8 no. TB01 end of terrace houses, 15 no. TB02 mid-terrace houses and 2 no. TB03 end of terrace, side entrance houses). 4 no. Type C three storey, 4 bedroom semidetached houses (3 no TC01 and 1 no. TC020) and 29 no. apartments in two blocks. Block A is three and four storeys and contains 18 no apartments consisting of 11 no. two bedroom units and 7 no. one bedroom units with balconies and terraces on the north, east and south elevations. Block B is three storeys and contains 11 no apartments consisting of 5 no. two bedroom units and 6 no. one bedroom units with balconies and terraces on the south and west elevations. The proposed development is accessed from Station Road and includes all associated site development and infrastructural works including the retention of the existing access to no. 3 Station Road, a new access onto Station Road which necessitates the moving of the existing pedestrian crossing and associated works to the public road, open space, landscaping, car parking, ESB substation, bin and bike storage on a 1.35 ha site. AI received 20/12/21 AI deemed significant revised public notices (SAI) received 20/01/22…
Cut short by the council feed. Full text ↗
Summary from the register record.
Planning timeline 7 steps
- 13 Jul 2021Application lodged — Standard
- 17 Feb 2022Council decision — Grant permission
- 16 Mar 2022Appealed to An Coimisiún Pleanála — 313039
- 28 Apr 2022Commission decision — Withdrawn
- 28 Apr 2022Final approval
- 21 Dec 2022Building started
- Q4 2024Site completed — Site completed
The site 1.43 ha
Boundary of Nos. 1 as the Dublin councils map it in the housing pipeline.
Planning applications inside the site 7 applications in the last 10 years
- Granted128 Drumnigh Wood, Portmarnock, Co. Dublin
- Appeal decidedSite circa 0.0235 ha, 1-3 station road and 136-137 Drumnigh Wood, Por
- WithdrawnSite circa 0.0235 ha, 1-3 Station Road and 136-137 Drumnigh Wood, Por
- Commenced1, 2 and 3 Station Road, Portmarnock, Co. Dublin
- Granted1,2 and 3 Station Rd, Portmarnock, Co.Dublin
- Granted136 Drumnigh Wood, Portmarnock, Co. Dublin.
- CommencedNos. 1,2 and 3 Station Road, Portmarnock, Co Dublin
Appeals inside the site 3 with An Coimisiún Pleanála
Other big developments nearby within 2 km
- Station Road · first homes signed off 2023 · 158 m away
- Townlands Drumnigh · 347 m away
- Maynetown & Drumnigh · approved 2024, no start notice · 348 m away
- Maynetown Phase 1E · first homes signed off 2026 · 195 homes · 473 m away
- at this site (c. 8.13 Ha) generally bounded by the existing · approved 2026, no start notice · 475 m away
- Teagasc Research Centre · building started 2026 · 1.3 km away
- GA3 Lands at Baldoyle · approved 2021, no start notice · 1.4 km away
- GA1 Lands at Baldoyle · 1.4 km away
Start notices are matched from the national building control register; a start on site can be missed.
Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.