PlanningRegister.ie
Dublin City Council · 4515/19 · Permission

Stone Villa

32 apartments4 storeysLilacstone LimitedDublin 7. The site incorporates a Protected Structure (a house) known as 'Stone Villa', Dublin City Council

Also known as 297 North Circular Road.

  1. 22 Nov 2019Received
  2. 24 Jan 2020Refuse permission
  3. 8 Mar 2024Appealed
  4. 12 Feb 2026Appeal: Granted with conditions
  5. 12 Feb 2026Final grant
Status
Appeal decided — granted
Decision
Refuse permission · 24 Jan 2020
Size
32 apartments · up to 4 storeys
Uses
residential, apartments
Applicant
Lilacstone Limited
Site
2,768 m²
Appeal
ACP 319232 · Granted with conditions

Building progress as the Dublin councils report it, Q2 2026

13 homes permitted; building has not started (Q2 2026).

32
homes proposed
13
homes permitted
0
homes started on site
0
homes completed

completed · under construction · not started · 0 houses and 13 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q1 20261300
Q2 20261300

The scheme

Lilacstone Limited proposes the conversion of Stone Villa into 3 apartments and the construction of 29 additional apartments in two new blocks at 297 North Circular Road. The development includes the widening of the existing vehicular entrance and associated site works on a 0.27 hectare site. The new blocks range from three to four storeys in height.

it involves the renovation of a protected structure and the addition of 32 apartments

What the register says

PROTECTED STRUCTURE: Permission for development at a 0.27 hectare site. The development will principally consist of: the conversion, renovation and alteration of Stone Villa (a Protected Structure) (257 sq m) to accommodate 3 no. apartments (2 no. 1 bedroom units and 1 no. 2 bedroom unit) and the construction of 29 no. apartments in 2 no. new blocks (part 3 to part 4 no. storeys in height) to the rear of the Protected Structure as follows: Block A (1,263 sq m) comprises 15 no. apartments (4 no. 1 bedroom units and 11 no. 2 bedroom units) and Block B (1,009 sq m) comprises 14 no. apartments (7 no. studios, 2 no. 1 bedroom units and 5 no. 2 bedroom units). The scheme provides a total of 32 no. apartments with a gross floor area of 2,529 sq m. The development will also include the widening of the existing vehicular entrance onto North Circular Road; 9 no. car parking spaces; bicycle parking; ESB substation; bin storage; hard and soft landscaping; pedestrian access; boundary treatments; solar panels; balconies (facing all directions); plant areas; external lighting; and all other associated site works above and below ground

On this list because it is 20 homes or more on the Dublin councils' housing pipeline. Name and summary derived from the register record on 27 Sept 2026; the facts are the council's.

Planning timeline 6 steps

  • 22 Nov 2019
    Application lodged — Standard
  • 16 Feb 2020
    Appealed to An Coimisiún Pleanála — ABP-319232-24
  • 24 Jun 2020
    Council decision — Refuse
  • 12 Feb 2026
    Commission decision — Granted
  • 12 Feb 2026
    Final grant of permission
  • 28 Mar 2031
    Permission expires (estimate) — Estimated permission expiry

The site 2,768 m²

Boundary of Stone Villa as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 6 applications in the last 10 years

Appeals inside the site 6 with An Coimisiún Pleanála

Around Stone Villa this application first, then everything within 1 km

Explore from here
Click a dot to open its row.
Loading planning applications…
Free · during launch · limited time

Full planning report for 53.36001, -6.27957

Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.

No account, no payment. Not a statutory planning search.

Other big developments nearby within 2 km

Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.