PlanningRegister.ie
Dublin City Council · 3594/23 · Permission

The Drake Inn

25 apartments7 storeysFinglas, Dublin City Council

Approved Jul 2023; no start notice yet.

Also known as 59/60 Main Street.

  1. 19 Apr 2023Received
  2. 12 Jun 2023Approved
  3. 20 Jul 2023Final approval
  4. 20 Jul 2028Approval runs out
Status
Approved No start yet
Decision
Approved · 12 Jun 2023
Size
25 apartments · up to 7 storeys
Uses
residential, apartments, retail, mixed
Site
884 m²

Building progress councils’ figures, Q2 2026

25 homes permitted; building has not started (Q2 2026).

25
homes proposed
25
homes permitted
0
homes started on site
0
homes completed

completed · under construction · not started · 0 houses and 25 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 20252500
Q3 20252500
Q4 20252500
Q1 20262500
Q2 20262500

The scheme

The proposal involves the demolition of the existing commercial building at the former Drake Inn site in Finglas. A new seven-storey mixed-use building is planned, featuring a retail unit, a gastropub, and 25 apartments. The development includes communal roof terraces and basement facilities for bicycle parking and services.

it replaces a local landmark with a seven-storey mixed-use building

What the register says

The proposed development will consist of the demolition of the existing two-storey over part basement (three storey), terraced, commercial building and the construction of a six-storey over full basement (seven storey) terraced mixed-use building consisting of 1 no. retail unit and 1 no. gastropub/restaurant at ground floor level, and a total of 25 no. apartments over five floors (8 no. one beds, 11 no. two beds and 6 no. three beds) with balconies to the south, east and west elevations, and communal roof terraces, all over a basement comprising 74 no. bicycle parking spaces, bin stores, plant room, and stores and ancillary service areas for the commercial unit, 10 no. bicycle parking spaces at ground floor level for staff, and 6 no. external bicycle parking spaces for visitors (adjoining Jamestown Road), and all associated site and engineering works necessary to facilitate the development

Summary from the register record.

Planning timeline 4 steps

  • 19 Apr 2023
    Application lodged — Standard
  • 12 Jun 2023
    Council decision — Grant
  • 20 Jul 2023
    Final approval
  • 2 Sept 2028
    Approval runs out (estimate)

The site 884 m²

Boundary of The Drake Inn as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 3 applications in the last 10 years

Appeals inside the site 1 with An Coimisiún Pleanála

Other big developments nearby within 2 km

Everything within 1 km on the map →

Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.