South Dublin County Council · SD24A/0221W · Permission

The Silver Granite

43 apartments5 storeysHollyville Investments LtdPalmerstown, South Dublin County Council

Approved on appeal May 2025.

Also known as Palmerstown Shopping Centre car park.

  1. 3 Oct 2024Received
  2. 27 Nov 2024Approved
  3. 20 Dec 2024Appealed
  4. 6 May 2025Appeal: Approved with conditions
  5. 6 May 2030Approval runs out
Status
Appeal decided — granted No start yet
Decision
Approved · 27 Nov 2024
Size
43 apartments · up to 5 storeys
Uses
residential, apartments, retail
Applicant
Hollyville Investments Ltd
Site
4,754 m²
Appeal
ACP 321523 · Approved with conditions

Building progress councils’ figures, Q2 2026

43 homes permitted; building has not started (Q2 2026).

43
homes proposed
43
homes permitted
0
homes started on site
0
homes completed

completed · under construction · not started · 0 houses and 43 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 20254300
Q3 20254300
Q4 20254300
Q1 20264300
Q2 20264300

The scheme

Hollyville Investments Ltd proposes the demolition of the existing Silver Granite pub to construct a 5-storey mixed-use development. The scheme includes 43 apartments alongside a gastro pub, restaurant, and two retail units at the junction of Kennelsfort Road Upper and Wheatfield Road in Palmerstown. The project also features communal roof gardens, car parking, and upgrades to the local public realm.

it involves the demolition of an existing building to provide 43 new apartments

What the register says

Demolition of the existing building on site and the construction of a 5-storey over partial basement, mixed-use development comprising a gastro pub/restaurant, 2 no. retail units, associated bin stores, bike stores, 1 no. ESB sub-station, all at ground floor level; a small plant room at basement level; a total of 43 no. apartments (17 no. 1 beds, 13 no. 2 beds and 13 no. 3 beds) on the upper floors, all provided with private balconies/terraces; communal roof gardens; car parking; bicycle parking; landscaping and upgrades to public realm including upgrades to existing pedestrian crossing on Kennelsfort Road Upper; and all associated engineering and site works necessary to facilitate the development

Summary from the register record.

Planning timeline 6 steps

  • 3 Oct 2024
    Application lodged — Standard
  • 27 Nov 2024
    Council decision — Grant
  • 19 Dec 2024
    Appealed to An Coimisiún Pleanála — ABP-321523-24
  • 7 May 2025
    Commission decision — Granted
  • 7 May 2025
    Final approval
  • 19 Oct 2030
    Approval runs out (estimate)

The site 4,754 m²

Boundary of The Silver Granite as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 9 applications in the last 10 years

Show 1 more

Appeals inside the site 2 with An Coimisiún Pleanála

Other big developments nearby within 2 km

Everything within 1 km on the map →

Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.